Trinity URD Electric ISNetworld ISO9001 2015 Quality Management System

Page 205

Trinity URD Electric, LLC Quality Management System

Trinity URD Electric Quality System Audit Form Project ID

Project Name

Preparer

#7000168098

Installation, Termination and Rehabilitation Services for Underground Residential Distribution Facilities Services

Date

Review Topics: (Place check mark next to each item reviewed) Project Quality Assurance/Quality Control Plan Contract Specifications Design Control Project-Specific Quality Standards Project Purchasing Process Controls Inspections and Tests Nonconformances and Corrective Actions Preventive Actions Quality System Audits Trinity URD Electric Quality System Standard Operating Procedures The auditor provides additional audit topic detail by initialing each paragraph of the attached quality manual that was reviewed.

Notes and observations

Action plan for improvement

Follow-up results and date

QUALITY SYSTEM SOP 13.3.1 CONTROL OF SYSTEM DOCUMENTS Version 10/25/2021

Approved by: Quality Manager

Purpose: To ensure the proper control of documents related to the quality system.

Scope:

Page 205 Standard Operating Procedures Copyright


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Trinity URD Electric ISNetworld ISO9001 2015 Quality Management System by Trinity URD Electric, LLC - Issuu