1 minute read

Quality System SOP 3.7 Project Quality Inspection and Test Plan

Training Title/ID Training Date

Participant Name Participant Signature Trainer Signature Of Completion Notes

Page 146 Standard Operating Procedures

QUALITY SYSTEM SOP 3.12 PROJECT RECORDS AND DOCUMENTATION PLAN Version

10/25/2021 Quality Manager

Purpose:

To define quality-related records that will be maintained for a project.

Scope:

All projects

Definitions:

None:

Approved by:

Responsible Person(s):

Person conducting training: Quality Manager, Project Manager, or General Foreman as appropriate

References:

Quality Manual Section 3.12 Project Records and Documentation Plan Quality Manual Section 13.4.2 Project Records Control

Procedure:

1. Use the form contained in this procedure unless the customer contract or Project Quality Assurance/Quality Control Plan specifies the use of a modified or customer supplied form. In that case, the specified form replaces the standard form for that contract. 2. The Responsible Person prepares a project quality training plan as required by the Quality Manual. 3. The Responsible Person records the training plan on a Project Quality Training Plan Form. 4. The Responsible Person stores the completed form in the field office as required by Quality Manual Section 13.4.2 Project Records Control.

Trinity URD Electric Project Quality Records Plan

Project ID

#7000168098

Project Name

Installation, Termination and Rehabilitation Services for Underground Residential Distribution Facilities Services

Preparer Date

Project records are maintained by forms contained in Trinity URD Electric Quality Standard Operating Procedures and customer supplied forms. Quality Standard Operating Procedures that apply to the project and are part of the project Quality Assurance/Quality Control Plan are listed below. The Standard Operating Procedures are included as an attachment to this plan.

This article is from: