Southington Master Plan Community Risk Assessment: Standards of Cover

Page 178

Master Plan, CRA/SOC

Town of Southington, CT

Opportunity #3: Service Delivery Deployment and Documentation Recommendation 3.1: All staffed engines and ladder trucks should have a minimum of four personnel. The Southington Fire Department should work toward having a minimum of four personnel on all staffed engines and ladder trucks in accordance with NFPA 1710. The value of four-person staffing cannot be overstated. Four firefighters allow for a safer and more efficient delivery of fire suppression operations than is possible with only three firefighters. The town and department should make a commitment to adopting a minimum staffing policy using NFPA 1710 that guarantees at least four qualified members on each piece of apparatus for field operations. Recommendation 3.2: Modify the Working Fire Protocol Declaration to ensure that adequate resources are dispatched to a working fire in a single-family home to initially respond at least 17 firefighters and that at least 28 firefighters are initially dispatched for working fires in strip malls and apartment buildings. The Southington Fire Department uses a “Working Fire Protocol Declaration” to determine the mutual aid that will be requested for a working fire. ESCI understands that Southington volunteer firefighters are dispatched to working fires and may respond, but since there is no guarantee of a volunteer firefighter response, volunteers are not included in this calculation to illustrate the potential worst-case scenario of a working fire without any volunteer response. Based on the current Working Fire Protocol Declaration, in order to achieve an effective fire fighting force of 17 firefighters for a single-family residence, Southington will require a second alarm response. To satisfy the ERF of 28 firefighters for a strip shopping center or an apartment building, Southington will require a third alarm response. ESCI recommends that the Southington Fire Department modify its Working Fire Protocol Declaration to assure that those adequate resources are dispatched to a working fire in a single-family home to initially respond at least 17 firefighters and that at least 28 firefighters are initially dispatched for working fires in strip malls and apartment buildings. Figure 134: Southington Fire Department Working Fire Declaration: Personnel On Scene 1st Alarm Department Southington Bristol (North) or Meriden (South) for RIT

Alarm Total

Staffing 6 3

9

2nd Alarm 3rd Alarm Department Staffing Department Staffing Southington 6 Southington 6 Meriden Bristol Plainville Cheshire Kensington

3 3 3 3 3

19

Meriden Bristol Plainville Cheshire Kensington New Britain Wolcott

3 3 3 3 3 6 3 30 Page 178


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Opportunity #5: Prevention Programs

3min
pages 189-191

Opportunity #4: Training and Professional Development Programs

7min
pages 184-188

Opportunity #6: Facilities and Apparatus

26min
pages 192-222

Opportunity #3: Service Delivery Deployment and Documentation

11min
pages 178-183

Opportunity #2: Staffing, Recruitment and Retention

5min
pages 174-177

People, Tools, and Time

1min
page 165

Dynamics of Fire in Buildings

4min
pages 162-163

Mutual Aid Alarm Assignments

1min
pages 157-158

Opportunity #1: Agency Management & Organization

8min
pages 170-173

Service Demand Projections

1min
page 161

Response Performance Summary

9min
pages 150-156

Response Reliability Review

5min
pages 147-149

Resource Concentration Study

2min
pages 143-146

Operational Staffing

17min
pages 122-131

Resource Distribution Analysis

5min
pages 137-142

Apparatus Replacement

4min
pages 106-107

Information Technology

2min
page 97

Health and Safety Programs

3min
pages 95-96

Capital Assets and Capital Improvement Programs

2min
page 102

Counseling Services

1min
page 94

Human-Caused Hazards

7min
pages 41-45

Union Contract

1min
page 78

Natural Hazards

13min
pages 31-40

Risk Prioritization

8min
pages 57-65

Compensation

4min
pages 90-93

Volunteer Costs

4min
pages 79-81

Capitol Region Natural Hazards Mitigation Plan

10min
pages 46-56

At-Risk Populations

5min
pages 26-30

External Stakeholder Input

3min
pages 13-15

Population

1min
page 21

Community Politics

2min
page 3

Organization Overview

1min
page 16

Community Risk Assessment

1min
page 20

Population Density

1min
page 22

Demographics

3min
pages 23-25

Organizational Design

1min
page 19
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.