
1 minute read
Sustainable Design
The process is based on the development of a constructive mechanism consisting of a dry assembly of prefabricated macro-components, using materials where they are most effective wood for the load-bearing structure, and the frameworks, collaboration metal for the floors, steel for the external frameworks. Wood shows a great overall coherence in the rationalization of materials and their performance, in their assembly and offers a great capacity of flexibility. and offers a great capacity of urban and interior volumetric adaptation. It allows for an intelligent response to the various regulatory and environmental requirements.

Advertisement
Sustainable Design


Concrete floor for the ground floor, for reasons of ease of management of rainwater and a system of reinforced wood beams with steel connections to adapt to the with steel joints to adapt to the large span, the roof and facades in photovoltaic glass, which photovoltaic glass, which make the building able to produce energy and be independent to be independent






A86 Rosny 2
Catalyzing load breaks throughout the shopping center by adapting it to future consumption patterns
The site has been studied from the transportation angle, two load breaks exist the site between the railway stations, the lo cal buses and the high level of service buses. service buses. The local buses currently have a terminus in the east, separated from Rosny 2 by the tracks. The six bus lines serving the Rosny-BoisPerrier station will be centralized to the west on the new Boulevard created by the N186.

The residential area to the will be preserved from the noise of the old bus stops and the new bus station on the other side of station on the other side of
Rosny 2 RER will be able to support the increased bus traffic when the new metro lines appear. Vehicles will travel on a new boulevard widened by the paving of the N186 at the level of the western park ing lots. To the north, a stop will be built to facilitate to the north, a stop will be set up to facilitate the circulation of high service level buses coming off the A86 ramps.
