Disaster Recovery Site fot UAE

Page 1

Disaster Recovery Site Setup & Implementation Progressive setups a Disaster Recovery (DR) site for an International Hospital – One of the most popular in United Arab Emirates

O

ne of the most admired hospital in the island of UAE wanted to have a disaster recovery site to support it existing IT infrastructure and maintain business continuity in case of failover.

In Brief Challenge One of UAE’s most well-liked hospital wanted to have a Disaster Recovery site to backup all its existing IT infrastructure in case of any man made / Natural calamity and ensures complete Business Continuity. Since the client is major giant in Medical centers in UAE, this was a much esteemed project for us. Solution Progressive setup a Disaster Recovery site for the client creating complete replica of the existing IT infrastructure ensuring complete move over of all systems & applications, maintaining business continuity. The Solution was implemented with VMware Site Recovery Manager – making disaster recovery rapid, manageable, reliable & affordable. Benefits y, The solution delivers high availability business continuity against any disaster. Also automated disaster recovery – switch over process is independent and real time, improving ng uptime & reducing adverse implications towards owards business. It also ensures with redundant IT infrastructure to stand against inst any unfavorable state of affairs.

Disaster Recovery Setup The client wanted to have Disaster Recovery Site to support all of its IT operations and automatically becomes active in case of failover process. The site should be capable enough to handle all of IT infrastructure with real time switchover process and a central point of management for disaster recovery plans. Progressive's solution constitutes of setting up a disaster recovery site, with the help of VMware vCenter Site Recovery Manager. er. It also includes, VMware vSphere ESX for 8 physical servers distributed equally between Production and DR Sites with HP High Configuration Server for DR and Site Location. The recovery process includes 15 physical servers such as domain 2003, exchange 2007 clustered, SQL 2005 clustered, SharePoint 2003, SCOM, ISA 2006 and SCCM 2007 and Creation of 15 New virtual Machine on top of 8 Physical Server. The Client chose to go with this solution as it was convinced by Progressive’s s technical expertise. This was a prestigious project as one of the biggest Hospitals in UAE chose Progressive to deliver DR solution in a highly complex environment.

Leveraging Virtualization Expertise VMware is a renowned player in meadow of providing virtualization & disaster recovery solution. With Progressive being a solution partner with VMware and a decade long implementation expertise, we have provided an edge over quality of service & support. Some of the major challenges which Progressive faced were: The setup of DR site required third party storage based replication to be installed & configured. configur The Site Recovery Manager operates on paired sites, i.e. one site protects another, for each pair of sites that are protected. protected The Applications need to be protected in order to tolerate


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.