Bucyrus International, Inc. 59HR ELECTRIC BLAST HOLE DRILL

4.

Turn the hoist brake switch to the RELEASE position. “Head Brake Released” will appear on operator’s display terminal operator’s display screen.

5.

Rotate the hoist/pulldown rheostat in the hoist direction to hoist the rotary/pulldown unit. The farther the rheostat is turned to the right the faster the unit will be raised.

6.

Rotate the pulldown force rheostat in the pulldown direction to lower the rotary/pulldown unit. The farther the rheostat is turned to the left the faster the unit will be lowered.

7.

When the hoist/pulldown operations are complete, set the hoist/pulldown speed rheostat to the “0” position and then turn the hoist brake switch to the SET position. CAUTION:

Whenever the hoist/pulldown speed rheostat is in the “0” position, the hoist brake switch must be in the SET position to prevent the rotary/pulldown unit from creeping downward due to the weight of the unit.

AUXILIARY WINCH OPERATION

Controls for Operating the Winch

To operate the auxiliary winch proceed as follows: 1.

Place the winch/mast control selector switch in the WINCH position.

2.

Place the operating mode selector switch in the DRILL position. The main air compressor must be energized.

Manual No. 10425

66

August 2006


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

MACHINE SPECIFICATIONS

3min
pages 112-115

PIPE SIZE LIMITATIONS

1min
pages 109-111

TOOL RECOVERY

4min
pages 107-108

LONG TERM STORAGE

1min
page 105

SHORT TERM STORAGE

1min
page 104

PREPARING TO MOVE

3min
pages 101-102

PROGRAMMED DRILL CONTROL DRILLING

1min
page 100

ANGLE DRILLING

2min
page 99

WET OR STICKY FORMATIONS

2min
page 98

STARTING THE HOLE (COLLARING

1min
page 91

NORMAL DRILLING

4min
pages 92-93

UNCONSOLIDATED MATERIALS

6min
pages 96-97

ENDING THE HOLE

2min
page 94

DUST SUPPRESSION SYSTEM OPERATION

1min
page 89

VERTICAL DRILLING

1min
page 90

REMOVAL OF MULTIPLE SECTION DRILL PIPE

2min
page 87

DRILL TOOL STRING ASSEMBLY

8min
pages 77-82

AUXILIARY WINCH OPERATION

1min
page 70

BREAKOUT WRENCH OPERATION

2min
page 83

ADDING ADDITIONAL DRILL PIPE

2min
page 86

ANGLE DRILLING

1min
page 88

PIPE RACK OPERATION

3min
pages 71-74

DRILL TOOL STRING DISASSEMBLY

4min
pages 84-85

PULLDOWN MACHINERY OPERATION

1min
page 69

PROPEL PROCEDURE

4min
pages 56-60

MAST LOWERING

3min
pages 67-68

PRECAUTIONS BEFORE AND DURING MAINTENANCE WORK

2min
page 52

TOWING PROCEDURE

1min
page 61

LEVELING

2min
pages 63-64

MAINTENANCE DURING OPERATION

1min
page 51

CABLE REEL OPERATION

1min
page 62

MACHINE START-UP

1min
page 53

PRESTART LUBRICATION

1min
page 50

OPERATOR’S DISPLAY TERMINAL

1min
page 38

CONTROLS ON OR NEAR THE AIR COMPRESSOR

1min
page 42

OPERATOR’S CONTROL CONSOLE

1min
page 23

ONBOARD INSPECTION

2min
pages 48-49

LEVELING CONTROL PANEL

1min
page 35

MISCELLANEOUS CONTROLS

1min
pages 43-44

CONTROLS - LOCATION AND FUNCTION

1min
page 22

MACHINE OVERVIEW

1min
page 21

FIRE PREVENTION CONSIDERATIONS

1min
page 14

STANDARD CRANE HAND SIGNALS

2min
pages 15-17

OPERATION NEAR ELECTRICAL TRANSMISSION LINES

1min
page 20

SAFETY

1min
page 10

MACHINE PLACARDS

1min
pages 18-19

GENERAL INFORMATION

1min
page 9

SAFETY PRECAUTIONS

4min
pages 11-13
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Rotary Track Drills 59HR Blast Hole Drill Operator’s Manual – PDF DOWNLOAD by www.heydownloads.com - Issuu