Rotary Track Drills 59HR Blast Hole Drill Operator’s Manual – PDF DOWNLOAD

Page 51

BI616959

Bucyrus International, Inc. 59HR ELECTRIC BLAST HOLE DRILL

The lubricant used should be kept clean. If possible the lubricant should be supplied from a bulk lube truck. Be careful when adding lubricant to the automatic system to keep the pump and drum cover and fill points clean. When using a manual gun wipe each fitting and the grease gun fitting before injecting the lubricant. Use clean containers and funnels for lubricant for transferring to the gear cases or reservoirs. Do not allow water to enter any gear case, reservoir or container. Wipe off all fill caps before removing them.

MAINTENANCE DURING OPERATION Safety requirements dictate that all machines in active service be inspected at regular intervals for proper adjustment of operating mechanisms, excessive wear of components, system cleanliness and any other defects. In-operation deficiencies should be carefully investigated. It should be determined if a safety problem exists. Remember that maintenance is vital to safe operation. It should be performed systematically by competent personnel. From an economic standpoint, it is advisable to perform as much of the upkeep as can be safely accomplished while the machine is running. Obviously, there are some maintenance procedures, such as gear tooth inspection and compressor maintenance, which require machine shut down. However, many support duties can be safely and effectively handled at shift change when the machine is still activated. Some parts of the machinery may be manually lubricated in a safe manner through extended grease or oil fittings designed to keep the operator’s hands at a safe distance. Where this is not possible, the machine must be shut down during the required lubrication. DANGER:

August 2006

MAKE SURE ALL GUARDS, COVERS OR OTHER SAFETY DEVICES ARE PROPERLY INSTALLED BEFORE OPERATING THIS EQUIPMENT AFTER PERFORMING MAINTENANCE OR REPAIRS. FAILURE TO HEED, COULD RESULT IN SERIOUS INJURY OR DEATH. A REPAIR OR MAINTENANCE TASK IS NOT COMPLETE UNTIL ALL GUARDS, COVERS OR OTHER SAFETY DEVICES REMOVED TO PERFORM THE TASK HAVE BEEN PROPERLY REINSTALLED.

47

Manual No. 10425


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

MACHINE SPECIFICATIONS

3min
pages 112-115

PIPE SIZE LIMITATIONS

1min
pages 109-111

TOOL RECOVERY

4min
pages 107-108

LONG TERM STORAGE

1min
page 105

SHORT TERM STORAGE

1min
page 104

PREPARING TO MOVE

3min
pages 101-102

PROGRAMMED DRILL CONTROL DRILLING

1min
page 100

ANGLE DRILLING

2min
page 99

WET OR STICKY FORMATIONS

2min
page 98

STARTING THE HOLE (COLLARING

1min
page 91

NORMAL DRILLING

4min
pages 92-93

UNCONSOLIDATED MATERIALS

6min
pages 96-97

ENDING THE HOLE

2min
page 94

DUST SUPPRESSION SYSTEM OPERATION

1min
page 89

VERTICAL DRILLING

1min
page 90

REMOVAL OF MULTIPLE SECTION DRILL PIPE

2min
page 87

DRILL TOOL STRING ASSEMBLY

8min
pages 77-82

AUXILIARY WINCH OPERATION

1min
page 70

BREAKOUT WRENCH OPERATION

2min
page 83

ADDING ADDITIONAL DRILL PIPE

2min
page 86

ANGLE DRILLING

1min
page 88

PIPE RACK OPERATION

3min
pages 71-74

DRILL TOOL STRING DISASSEMBLY

4min
pages 84-85

PULLDOWN MACHINERY OPERATION

1min
page 69

PROPEL PROCEDURE

4min
pages 56-60

MAST LOWERING

3min
pages 67-68

PRECAUTIONS BEFORE AND DURING MAINTENANCE WORK

2min
page 52

TOWING PROCEDURE

1min
page 61

LEVELING

2min
pages 63-64

MAINTENANCE DURING OPERATION

1min
page 51

CABLE REEL OPERATION

1min
page 62

MACHINE START-UP

1min
page 53

PRESTART LUBRICATION

1min
page 50

OPERATOR’S DISPLAY TERMINAL

1min
page 38

CONTROLS ON OR NEAR THE AIR COMPRESSOR

1min
page 42

OPERATOR’S CONTROL CONSOLE

1min
page 23

ONBOARD INSPECTION

2min
pages 48-49

LEVELING CONTROL PANEL

1min
page 35

MISCELLANEOUS CONTROLS

1min
pages 43-44

CONTROLS - LOCATION AND FUNCTION

1min
page 22

MACHINE OVERVIEW

1min
page 21

FIRE PREVENTION CONSIDERATIONS

1min
page 14

STANDARD CRANE HAND SIGNALS

2min
pages 15-17

OPERATION NEAR ELECTRICAL TRANSMISSION LINES

1min
page 20

SAFETY

1min
page 10

MACHINE PLACARDS

1min
pages 18-19

GENERAL INFORMATION

1min
page 9

SAFETY PRECAUTIONS

4min
pages 11-13
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Rotary Track Drills 59HR Blast Hole Drill Operator’s Manual – PDF DOWNLOAD by www.heydownloads.com - Issuu