Rotary Track Drills 59HR Blast Hole Drill Operator’s Manual – PDF DOWNLOAD

Page 15

BI616959

Bucyrus International, Inc. 59HR ELECTRIC BLAST HOLE DRILL

STANDARD CRANE HAND SIGNALS These signals are derived from ANSI-B30.5-1868 and are intended to provide standardization to the signalling used in communication between maintenance personnel and crane operators during the maintenance cycle. hscran_1

HOIST Extend forearm upward, keeping forefinger extended and pointing up, make small circular movements with hand.

LOWER Extended arm downward, keeping forefinger extended and pointed down, make small circular movements with hand.

MAIN HOIST Tap fist on head until signal received by operator, then use standard signals.

USE WHIP LINE (Auxiliary Hoist) Tap elbow with open hand until signal received by operator, then use standard signals. (Hand signals continued on following page.)

August 2006

11

Manual No. 10425


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

MACHINE SPECIFICATIONS

3min
pages 112-115

PIPE SIZE LIMITATIONS

1min
pages 109-111

TOOL RECOVERY

4min
pages 107-108

LONG TERM STORAGE

1min
page 105

SHORT TERM STORAGE

1min
page 104

PREPARING TO MOVE

3min
pages 101-102

PROGRAMMED DRILL CONTROL DRILLING

1min
page 100

ANGLE DRILLING

2min
page 99

WET OR STICKY FORMATIONS

2min
page 98

STARTING THE HOLE (COLLARING

1min
page 91

NORMAL DRILLING

4min
pages 92-93

UNCONSOLIDATED MATERIALS

6min
pages 96-97

ENDING THE HOLE

2min
page 94

DUST SUPPRESSION SYSTEM OPERATION

1min
page 89

VERTICAL DRILLING

1min
page 90

REMOVAL OF MULTIPLE SECTION DRILL PIPE

2min
page 87

DRILL TOOL STRING ASSEMBLY

8min
pages 77-82

AUXILIARY WINCH OPERATION

1min
page 70

BREAKOUT WRENCH OPERATION

2min
page 83

ADDING ADDITIONAL DRILL PIPE

2min
page 86

ANGLE DRILLING

1min
page 88

PIPE RACK OPERATION

3min
pages 71-74

DRILL TOOL STRING DISASSEMBLY

4min
pages 84-85

PULLDOWN MACHINERY OPERATION

1min
page 69

PROPEL PROCEDURE

4min
pages 56-60

MAST LOWERING

3min
pages 67-68

PRECAUTIONS BEFORE AND DURING MAINTENANCE WORK

2min
page 52

TOWING PROCEDURE

1min
page 61

LEVELING

2min
pages 63-64

MAINTENANCE DURING OPERATION

1min
page 51

CABLE REEL OPERATION

1min
page 62

MACHINE START-UP

1min
page 53

PRESTART LUBRICATION

1min
page 50

OPERATOR’S DISPLAY TERMINAL

1min
page 38

CONTROLS ON OR NEAR THE AIR COMPRESSOR

1min
page 42

OPERATOR’S CONTROL CONSOLE

1min
page 23

ONBOARD INSPECTION

2min
pages 48-49

LEVELING CONTROL PANEL

1min
page 35

MISCELLANEOUS CONTROLS

1min
pages 43-44

CONTROLS - LOCATION AND FUNCTION

1min
page 22

MACHINE OVERVIEW

1min
page 21

FIRE PREVENTION CONSIDERATIONS

1min
page 14

STANDARD CRANE HAND SIGNALS

2min
pages 15-17

OPERATION NEAR ELECTRICAL TRANSMISSION LINES

1min
page 20

SAFETY

1min
page 10

MACHINE PLACARDS

1min
pages 18-19

GENERAL INFORMATION

1min
page 9

SAFETY PRECAUTIONS

4min
pages 11-13
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Rotary Track Drills 59HR Blast Hole Drill Operator’s Manual – PDF DOWNLOAD by www.heydownloads.com - Issuu