Rotary Track Drills 59HR Blast Hole Drill Operator’s Manual – PDF DOWNLOAD

Page 14

BI616959

Bucyrus International, Inc. 59HR ELECTRIC BLAST HOLE DRILL

FIRE PREVENTION CONSIDERATIONS Always have a “charged” fire extinguisher on hand and know how to use it. Inspect and service the extinguisher as indicated on its instruction plate. DO NOT smoke while handling flammables or when near batteries. Inspect all lines, tubes, and hoses carefully. Tighten all connections to their recommended torque specification. See Section 4 of this manual for the Scheduled Maintenance recommendations and the Walk Around Inspection procedure. Repair or replace loose or damaged lines, tubes, and hoses as soon as possible. Make certain that all clamps, guards, and shields are replaced correctly so as to prevent vibration and the chafing of parts during operation. DO NOT carry flammable fluids such as gasoline or solvents on board themachine. DO NOT over-bend or strike pressurized lines or hoses. DO NOT install bent or damaged lines, tubes, or hoses. Replace them immediately. DO NOT start the machine or move any of the controls if a warning tag is attached to the controls or the start panel. Keep all cleaning rags properly stored. DO NOT discard them into a pile on board. Keep all structural frame compartments, walkways, and work areas clean and free of lubricant residue. NEVER weld, burn, or perform service on the machine alone.

Manual No. 10425

10

August 2006


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

MACHINE SPECIFICATIONS

3min
pages 112-115

PIPE SIZE LIMITATIONS

1min
pages 109-111

TOOL RECOVERY

4min
pages 107-108

LONG TERM STORAGE

1min
page 105

SHORT TERM STORAGE

1min
page 104

PREPARING TO MOVE

3min
pages 101-102

PROGRAMMED DRILL CONTROL DRILLING

1min
page 100

ANGLE DRILLING

2min
page 99

WET OR STICKY FORMATIONS

2min
page 98

STARTING THE HOLE (COLLARING

1min
page 91

NORMAL DRILLING

4min
pages 92-93

UNCONSOLIDATED MATERIALS

6min
pages 96-97

ENDING THE HOLE

2min
page 94

DUST SUPPRESSION SYSTEM OPERATION

1min
page 89

VERTICAL DRILLING

1min
page 90

REMOVAL OF MULTIPLE SECTION DRILL PIPE

2min
page 87

DRILL TOOL STRING ASSEMBLY

8min
pages 77-82

AUXILIARY WINCH OPERATION

1min
page 70

BREAKOUT WRENCH OPERATION

2min
page 83

ADDING ADDITIONAL DRILL PIPE

2min
page 86

ANGLE DRILLING

1min
page 88

PIPE RACK OPERATION

3min
pages 71-74

DRILL TOOL STRING DISASSEMBLY

4min
pages 84-85

PULLDOWN MACHINERY OPERATION

1min
page 69

PROPEL PROCEDURE

4min
pages 56-60

MAST LOWERING

3min
pages 67-68

PRECAUTIONS BEFORE AND DURING MAINTENANCE WORK

2min
page 52

TOWING PROCEDURE

1min
page 61

LEVELING

2min
pages 63-64

MAINTENANCE DURING OPERATION

1min
page 51

CABLE REEL OPERATION

1min
page 62

MACHINE START-UP

1min
page 53

PRESTART LUBRICATION

1min
page 50

OPERATOR’S DISPLAY TERMINAL

1min
page 38

CONTROLS ON OR NEAR THE AIR COMPRESSOR

1min
page 42

OPERATOR’S CONTROL CONSOLE

1min
page 23

ONBOARD INSPECTION

2min
pages 48-49

LEVELING CONTROL PANEL

1min
page 35

MISCELLANEOUS CONTROLS

1min
pages 43-44

CONTROLS - LOCATION AND FUNCTION

1min
page 22

MACHINE OVERVIEW

1min
page 21

FIRE PREVENTION CONSIDERATIONS

1min
page 14

STANDARD CRANE HAND SIGNALS

2min
pages 15-17

OPERATION NEAR ELECTRICAL TRANSMISSION LINES

1min
page 20

SAFETY

1min
page 10

MACHINE PLACARDS

1min
pages 18-19

GENERAL INFORMATION

1min
page 9

SAFETY PRECAUTIONS

4min
pages 11-13
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Rotary Track Drills 59HR Blast Hole Drill Operator’s Manual – PDF DOWNLOAD by www.heydownloads.com - Issuu