Linkbelt 160 X2 EXCAVATOR SHOP MANUAL - PDF DOWNLOAD

Page 293

5-11 Upper Swing Body: Pump 4 Regulator Assembly and Disassembly Procedures 1-1 Tools The table below shows the tools required for the disassembly and assembly of KR76-9***-V.

Tool name and dimensions

Name Hexagon bar wrench

Closed wrench Socket wrench Double-head (single-head) wrench

Monkey wrench Screwdriver Hammer Pliers Steel rod Torque wrench Bolt for retrieving adjusting ring Q

B 2 2.5 3 4 5 6 8 10 14 17 19 21 22 19 22 24 27 30 36 41 50 55 -

Required tools are indicated with { Regulator model KR76-9***-V

Part name Hexagon socket head bolt

Buried plug (PT screw)

ROH plug VP plug (PF screw)

{ { { { { { {

M5 Rc 1/16 M6 Rc 1/8 M8 Rc 1/4 G 1/4 M10 Rc 3/8 G 3/8 M12 Rc 1/2 G 1/2 M16, M18 Rc 3/4 G 3/4 M20, M22 Rc 1 G1 M24, M27 M30 M12 G 1/4 G 3/8 M16 M18 G 1/2 M20 G 3/4 G1 G 11/4 G 11/2 Medium-sized × 1 Medium-sized flathead screwdriver × 2 Plastic hammer × 1 TSR-150 for stop ring TRR-150 for locking ring Diameter φ4 or less L = 100 With adjustable specified torque tightening

{

M4 coarse head bolt

{ { { {

289

Hexagon socket head stop screw M4 M5 M6 M8 M10 M12, M14 M16, M18 M20 -


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.