REMOVAL AND INSTALLATION
WORKING EQUIPMENT
WORKING EQUIPMENT Removal
k Fully extend the arm and open the bucket completely. Lower the equipment until it rests on the ground.
2
1 -Remove the protection (1) and the relative sliding shoes. [*1] 2 -Stop the engine, release all the pressure in the cylinder and de-pressurize the hydraulic system by moving the PPC valve lever several times. 3 -Remove the pin (2).
1
[*2]
a Note down position of any shims and direction of assembly.
RKPB9410
4 -Lower the cylinder (3) until it rests on a stand “A”. 5 -Start the engine to retract the piston.
3
[*3]
6 -Stop the engine and release the residual hydraulic pressures. (For details, see "20 CONTROLS AND ADJUSTMENTS").
A
RKPB8971
7 -Disconnect two arm hoses (4) (A -C yellow) and two bucket hoses (5) (A-C green) from the control valve; plug the hoses and cylinder holes to prevent contamination.
4
6
5
RKPB9141
Only if equipped: Disconnect the optional equipment delivery hose (6) from the control valve and disconnect hose (8) from block (7).
8
a Plug the tubes and fittings to prevent entry of impurities. a Mark the hoses to avoid exchanging them during reinstallation.
7 PC14R-3 PC16R-3
RKPB9560
30-109