Komatsu PC1250-7 PC1250SP-7 Hydraulic Excavator Operation & Maintenance Manual – PDF DOWNLOAD

Page 96

.

OPERATION

DETAILED CONTROLS AND GAUGES

Vent Selector Switch Switch (4) is used to select the vents. When switch (4) is pressed, the display on monitor display (7) switches and air blows out from the vents displayed. During automatic operation, the vents are automatically selected.

(A): Rear vents (4 places) (B): Face vent (1 place) (C): Foot vent (1 place) (D1): Front window vent (1 place) (D2): Front window vent (1 place) Front window vent (D2) can be opened or closed by hand.

3 - 43


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Komatsu PC1250-7 PC1250SP-7 Hydraulic Excavator Operation & Maintenance Manual – PDF DOWNLOAD by www.heydownloads.com - Issuu