Swing-away lattice 4.3 Checklists for rigging work
29. Check the horizontal alignment of the truck crane and correct, if necessary.
30. Enter the current rigging mode with the rigged swing-away lattice; Setting the SLI, p. 4 - 99.
à
31. Enter current reeving;
à Setting the SLI, p. 4 - 99.
Further steps with swing-away lattice:
à
p. 4 - 101. – Raise main boom; p. 4 - 102. – Telescope main boom;
21.08.2008
à
4 - 26
3 112 518 en
Operating instructions lattice extension GMK 5130-2/5110-1