For operations planning

3.1 Information

The following section gives information on the topics of: –assembly, –identification, –transport dimensions and weights, –slinging points and –transport.

Assembly The lengths in each case are given as the distance between the centre of the locking pin (on the main boom head) and the front edge of the head sheave. For this reason, the lengths of the individual parts given in Transport dimensions and weights and their totals do not agree with the lengths stated here.

Identification

SRisk of accidents if not adjusted correctly

The lattice extension is designed for the truck crane with which it was delivered.

If a lattice extension is for use on several truck cranes, it must be matched to the truck crane and marked with the serial number. Adjustments to the lattice extension may only be carried out by CraneCARE. This prevents malfunctions and damage.

Transport dimensions and weights

Take note of the data on the weight and dimensions of the lattice extension in the respective sections. The dimensions listed here, and their totals, do not agree with the data listed in the Assembly section.

Slinging points

GRisk of accidents due to falling parts of the lattice extension!

When slinging, take note of the centre of distribution shown in the respective diagram. Use the slinging points provided. Always use lifting gear with a sufficient lifting capacity. In this way, you prevent the attached sections from slipping out, falling and causing injury during installation or removal.

Transport

SRisk of damaging the lattice extension

Always secure the lattice extension by tying it down with suitable belts when it is transported on a separate vehicle. This prevents the swing-away lattice extension from tipping and becoming damaged during transportation.

3.2 Swing-away lattice

3.2 Swing-away lattice

3.2.1 Assembly

Observe the instructions on Assembly and Identification; à p.3-1.

11 m (36 ft) swing-away lattice

Section1

18 m (59 ft) swing-away lattice

Section1

Section2

3.2.2 Identification

Observe the instructions regarding Identification; à p.3-1.

In order to identify the parts of the swing-away lattice, they are marked with the serial number (1) of the truck crane.

3.2.3 Transport dimensions and weights

The following values apply for the derricking and inclinable swing-away lattice.

3.2.4 Slinging points

Observe the instructions regarding Slinging points; à p.3-2.

All distances are given from the centre of the fork elements. They apply for derricking and inclinable swing-away lattices.

3.2.5 Transport

Observe the instructions regarding Transport and regarding Slinging points; à p.3-2.

• Check whether all the required connections for transport condition are established; à Transport condition with removed swingaway lattice, p.4-41.

• For transportation, place the lattice extension on the skid (1) at the front and onto the lower connecting points ( 2) at the rear.

• Always secure the lattice extension on the transport vehicle with belts to prevent slipping and overturning.

3.3 Boom extension

3.3.1 Assembly

Observe the instructions on Assembly and Identification; à p.3-1.

Only the specified boom extension sections are permissible for the specified crane types:

26 m (85 ft) boom extension

32 m (105ft) boom extension

38 boom extension

3.3.2 Identification

Observe the instructions regarding Identification; à p.3-1.

In order to identify the parts, they are marked with the serial number (1) of the truck crane.

3.3.3 Transport dimensions and weights

3.3.4 Slinging points

Observe the instructions regarding Slinging points; à p.3-2.

The sections have two slinging points (1).

3.3.5 Transportation

Observe the instructions regarding Transport; à p.3-2.

• Place the parts on wooden beams (1) in the front and rear for transport.

• Always secure the lattice extension on the transport vehicle with belts to prevent slipping and overturning.

3.4 Auxiliary single-sheave boom top

3.4 Auxiliary single-sheave boom top

Identification and slinging point

Observe the instructions regarding:

Identification; à p.3-1.

Slinging points; à p.3-2.

The serial number (1) is on a plate at the front on the auxiliary single-sheave boom top.

• Attach a sling strap. Be careful not to damage any additional units.

4Swing-away lattice

Swing-away lattice 4.1 Validity

This chapter applies for the derricking and inclinable swing-away lattice. The swing-away lattices are distinguished by their angle settings.

–The angle is adjusted on the derricking swing-away lattice with the hydraulic cylinder (1).

Rigging work that applies only to this swingaway lattice is indicated in the checklists with the symbol (1.1).

–The angle is adjusted on the inclinable swing-away lattice with the angle piece (2).

Rigging work that applies only to this swingaway lattice is indicated in the checklists with the symbol (2.1).

H

Term designation

The swing-away lattice is also a component of the boom extension. For this reason, the described circumstances also refer to the boom extension under certain conditions.

Then, instead of the expression Swing-away lattice, the collective term lattice extension is used.

The lifting capacity tables primarily contain the term Swing-away lattice extension. This term will only be used later in this chapter, when a length specification is necessary.

When no length data is necessary (e.g. for rigging work), the term Swingaway lattice is only used when the text needs to be as short as possible.

Blank page

4.2 Short description of the operating elements

4.2 Short description of the operating elements

4.2.1 In the crane cab

At the control console, right

This section is only valid for the derricking swing-away lattice.

Derricking gear of lattice extension on/off

There is a lamp in the button.

–Press once –Lamp bright – derricking gear on, power units with the same control lever configuration off –Lamp dim – derricking gear off à p.4-89

Right control lever

–To the left: Raise – lift swing-away lattice

–To the right: Lower – lower swing-away lattice à p.4-89

On the crane control display

This section is only valid for the derricking swing-away lattice.

Power unit display – in main menu

–Green: Derricking gear on

–Red: Derricking gear off

Limiting power unit speed – power unit speed submenu

If the symbol (1) in shown in black, a maximum speed can be set for the derricking gear of the lattice extension; à Operating instructions GMK5130-2/ 5110-1.

Display operating hours – operating hours submenu

The operating hours of the derricking gear of the lattice extension are displayed under the symbol (1); à Operating instructions GMK5130-2/5110-1.

Swing-away lattice

4.2 Short description of the operating elements

On the safe load indicator If a lattice extension is electrically connected, the following buttons and displays are active.

Length of lattice extension display and input

1Display: Lattice extension length in metres (m) or feet (ft) –For displayed SLI code

2Input: In input mode à p.4-99

Press button R once – next length

Angle of the lattice extension display and input

An SLI code for the inclinable lattice extension is displayed.

1Display: Angle between lattice extension and main boom in degrees (°) – for displayed SLI code

2Input: In input mode

Press T button once – next angle à p.4-99

Current lattice extension inclination display

An SLI code for the derricking lattice extension is displayed.

1Display: Angle between the lattice extension and main boom in degrees (°)

2Display: Additional function: Press T once – display of current angle between lattice extension and horizontal position, for two seconds à p.4-99

4.2 Short description of the operating elements

4.2.2 Operating elements on the swing-away lattice

This section is only valid for the derricking swing-away lattice.

1 Raise swing-away lattice

2 Lower swing-away lattice

The movement is carried out as long as the button is pushed or a switch-off point has been reached.

4.2 Short description of the operating elements

4.2.3 Operating elements on the hand-held control

This section is only valid for the derricking swing-away lattice.

The button (1) Derrick lattice extension is active if the derricking swing-away lattice is electrically connected.

Pre-select and then press the required combination of buttons.

–Pre-selection on: Press button once – lamp (1) lights up –pre-selection on until another pre-selection is made

–Pre-selection off: Press a non-allocated combination of buttons

–Pre-selected function on Press the required button combination.

–Pre-selected function off Release one or both the buttons

–Raise swing-away lattice: Press shown button combination

–Lower swing-away lattice: Press shown button combination

–Faster movement: Press button harder

–Slower movements: Press button less hard

4.3 Checklists for rigging work

4.3 Checklists for rigging work

4.3.1 Overview of the required rigging work

There are different initial states for rigging the swing-away lattice, depending on whether the swing-away lattice is: –folded at the side of the main boom or –dismantled for on-road driving.

The following table shows you which checklist describes the required rigging work for your initial state.

Starting position of the swing-away lattice

Corresponding checklist for ...

Before crane operation

After crane operation

–Folded at the side of the main boom:

Rig the 11 m (36 ft) swing-away lattice; à p.4-15, Rig the 18 m (59 ft) swing-away lattice; à p.4-21.

–Completely dismantledInstallation; à p.4-8.

–Must be folded at the side of the main boom:

Unrig the 11 m (36 ft) swingaway lattice; à p.4-27, Unrig the 18 m (59 ft) swingaway lattice; à p.4-33.

–Must be removed for onroad driving Removal1); à p.4-10.

1) Driving mode specifications à Operating instructions GMK5130-2/ 5110-1 – Driving modes

4.3.2 CHECKLIST: Installing the 11/18 m (36/59 ft) swing-away lattice

HThis checklist is not equivalent to the complete operating instructions. There are accompanying operating instructions which are referred to by cross-references.

Observe the warnings and safety instructions specified there.

Requirements:

–The truck crane is on outriggers or the main boom has been placed on the boom rest.

–An auxiliary crane is available.

1. For derricking swing-away lattice: –check to see if the locking device is released on the hose drum; à p.4-45.

2. Check whether the transport condition of the swing-away lattice has been established; à Transport condition with removed swing-away lattice, p.4-41.

3. Sling the swing-away lattice on the auxiliary crane and fasten a guide rope to the front of section1; à Slinging points, p.3-6.

4. Raise swing-away lattice and pin section 1 on to the main boom, on the right-hand side; à p.4-61.

GRisk of crushing due to swinging swing-away lattice

Always secure the swing-away lattice against swinging with the guide ropes before you establish the hydraulic or electrical connection. This will prevent the swing-away lattice from swinging inadvertently to the side of the main boom and possibly crushing you.

5. For derricking swing-away lattice, establish a hydraulic connection; à p.4-47.

6. Establish the electrical connection; à p.4-73.

7. For further folding of:

11 m (36 ft) swing-away lattice:

18 m (59 ft) swing-away lattice:

8. For further rigging of:

11 m (36 ft) swing-away lattice:

18 m (59 ft) swing-away lattice:

CHECKLIST: Unrigging 11 m (36 ft) swingaway lattice from point10. à p.4-28.

CHECKLIST: Unrigging 18 m (59 ft) swingaway lattice from point15. à p.4-35.

CHECKLIST: Rigging the 11 m (36 ft) swingaway lattice from point13. à p.4-17.

CHECKLIST: Rigging the 18 m (59 ft) swingaway lattice from point13. à p.4-23.

4.3 Checklists for rigging work

4.3.3 CHECKLIST: Removing the 11/18 m (36/59 ft) swing-away lattice

HThis checklist is not equivalent to the complete operating instructions. There are accompanying operating instructions which are referred to by cross-references.

Observe the warnings and safety instructions specified there.

Requirements:

–The truck crane is on outriggers or the main boom has been placed on the boom rest.

–An auxiliary crane is available.

For rigged swingaway lattice

This checklist only applies when the swing-away lattice is rigged. If the swing-away lattice is folded, à For folded swing-away lattice, p.4-12.

HIf the swing-away lattice should be transported in its folded state:

1. Unrig swing-away lattice à CHECKLIST: Unrigging 11 m (36 ft) swing-away lattice, p.4-27 or à CHECKLIST: Unrigging 18 m (59 ft) swing-away lattice, p.4-33.

2. Remove swing-away lattice à For folded swing-away lattice, p.4-12

1. All rigging work should be carried out according to the points in the specified checklist.

11 m (36 ft) swing-away lattice: CHECKLIST: Unrigging 11 m (36 ft) swingaway lattice up to and including point12. à p.4-29.

18 m (59 ft) swing-away lattice: CHECKLIST: Unrigging 18 m (59 ft) swingaway lattice up to and including point17. à p.4-35.

2. Disconnect the electrical connection; à p.4-74.

3. For derricking swing-away lattice, disconnect the hydraulic connection; à p.4-47.

4. Sling the swing-away lattice on the auxiliary crane and fasten a guide rope to the front of section1; à Slinging points, p.3-6.

5. Release the right and left connections; à Connections on the left and right of the main boom head, p.4-61.

6. If section2 is to be removed:

–Sling section2 on to the auxiliary crane; à Slinging points, p.3-6.

–Move the connection in the Middle area into the position Remove section 2/main boom ; à p.4-55.

–Release the connection in the Rear area; à p.4-57.

–Set down section2 on the separate vehicle.

7. Fold in the run-up rail; à p.4-48.

8. Check the transport condition of the swing-away lattice; à Transport condition with removed swing-away lattice, p.4-41.

Swing-away lattice

4.3 Checklists for rigging work

9. For derricking swing-away lattice: Position hydraulic hoses for working with the main boom; à p.4-46.

For folded swingaway lattice

This checklist only applies when the swing-away lattice is folded. If the swing-away lattice is rigged à For rigged swing-away lattice, p.4-10.

1. For derricking swing-away lattice, disconnect the hydraulic connection; à p.4-47.

2. Disconnecting the electrical connection; à p.4-74.

3. Sling the swing-away lattice on the auxiliary crane and fasten a guide rope to the front of section1; à Slinging points, p.3-6.

4. If the 11 m (36 ft) swing-away lattice is folded to the side:

–Disconnect the connection between Section1 and the main boom in the Rear area; à p.4-59.

–Release the connection in the Front area; à p.4-51.

–See point 7.

5. If the 18 m (59 ft) swing-away lattice is folded to the side:

–Check if the connection between section1 and section2 is established in the Rear area; à p.4-60.

–Check that the connection in the Middle area is in the position Section1/Section2; à p.4-54.

–See point 6.

6. If the 18 m (59 ft) swing-away lattice is folded to the side:

–Disconnect the connection between section 2 and the main boom in the Rear area; à p.4-57.

–Release the connection in the Front area; à p.4-51.

7. Set down swing-away lattice on the separate vehicle; à Transport, p.3-7.

8. Fold in the run-up rail; à p.4-48.

9. Check the transport condition of the swing-away lattice; à Transport condition with removed swing-away lattice, p.4-41.

10. For derricking swing-away lattice: Position hydraulic hoses for working with the main boom; à p.4-46.

Blank page

4.3.4 CHECKLIST: Rigging the 11 m (36 ft) swing-away lattice

HThis checklist is not a complete set of operating instructions. There are accompanying operating instructions which are referred to by crossreferences. Observe the warnings and safety instructions there.

1. Rigging the truck crane:

–Rig the truck crane according to CHECKLIST: Rigging; à Operating instructions GMK5130-2/5110-1.

–Before crane operation, check according to CHECKLIST: Checks before crane operation; à Operating instructions GMK5130-2/5110-1.

–Retract the main boom completely and lower it into the horizontal position.

–Roll the unused hoist rope on to drum.

2. Check the transport condition of the swing-away lattice; à Transport condition with folded swing-away lattice, p.4-42.

3. For derricking swing-away lattice:

–Check to see if the locking device is released on the hose drum; à p.4-45.

–Position hydraulic hoses for working with the lattice extension; à p.4-46.

4. For derricking swing-away lattice, establish a hydraulic connection; à p.4-47.

5. Establish the electrical connection; à p.4-73.

7.

8. If only Section1 is installed:

–Disconnect the connection between section1 and the main boom in the Rear area; à p.4-58.

–See point 10.

9. If Section1 and Section2 are installed:

–Move the connection in the Middle area into the position Section2/ Main boom; à p.4-55.

–Disconnect the connection between section2 and the main boom in the Rear area; à p.4-57.

–Disconnect the connection between section2 and section1 in the Rear area; à p.4-60.

12. Disconnect the connection in the Front area; à p.4-51.

13. Swing the swing-away lattice in front of the main boom head; à When rigging – section1, p.4-67.

14. Pin section1 to main boom head, on the left-hand side; if necessary release the bearing points or use the hydraulic rigging aid (additional equipment); à Left-hand connection, p.4-62, à Relieving the connecting points , p.4-63, à Hydraulic rigging aid (additional equipment), p.4-63.

15. In the Front area, move the connection into the position Unrigging; à p.4-53.

16. Fold out the deflection sheaves to the front and rear; à p.4-76.