Grove Crane GMK 5110-1 Electrics Schematics Manual - PDF DOWNLOAD

Page 58

Swing-away lattice 4.3 Checklists for rigging work

6. Folding out the run-up rail;

à p. 4 - 48.

7. Securing the swing-away lattice with guide rope;

à p. 4 - 39.

8. Check, – that the connection in the Middle area is in the position Section 1/ p. 4 - 54. Section 2; – that the connection between section 1 and section 2 is established in the Rear area; p. 4 - 60.

à

à

9. Disconnect the connection between section 2 and the main boom in the Rear area; p. 4 - 57.

à

à p. 4 - 66.

21.08.2008

10. Swinging the lattice extension on to the main boom head;

4 - 22

3 112 518 en

Operating instructions lattice extension GMK 5130-2/5110-1


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.