Swing-away lattice 4.3 Checklists for rigging work
6. Folding out the run-up rail;
à p. 4 - 48.
7. Securing the swing-away lattice with guide rope;
à p. 4 - 39.
8. Check, – that the connection in the Middle area is in the position Section 1/ p. 4 - 54. Section 2; – that the connection between section 1 and section 2 is established in the Rear area; p. 4 - 60.
à
à
9. Disconnect the connection between section 2 and the main boom in the Rear area; p. 4 - 57.
à
à p. 4 - 66.
21.08.2008
10. Swinging the lattice extension on to the main boom head;
4 - 22
3 112 518 en
Operating instructions lattice extension GMK 5130-2/5110-1