Case SV211 Vibratory Rollers Operator's Manual 87487731 - PDF DOWNLOAD

Page 84

3.6.

Lubrication & Maintenance Operations

Maintenance manual

Carry out lubrication & maintenance on regular basis and repeatedly in intervals according to daily reading on the hoursof-operation counter.

This Manual includes essential information concerning the engine only; refer to Engine Operation & Maintenance Manual for other information which is part of documentation supplied along with the Machine.

Refer to the Table in Section 3.6.37. for torque figures when tightening dismantled or loose bolts, plugs, hydraulics’ threaded joints and others, unless another figure is specified for a given operation. Conduct lubrication & maintenance in regularly repeating intervals per daily data reading on the hours-of-operation counter. This Manual includes essential information concerning the engine only; refer to Engine Operation & Maintenance Manual for other information which is part of documentation supplied along with the Machine.

! CAUTION! Follow the instructions given in the Engine Operation & Maintenance Manual! Before you start doing maintenance, please dead park the roller to be leveled, and on solid flat surface!· Carry out inspection with the roller braked, engine shut off and battery disconnector switched off (unless otherwise required)!

Following initial 100 hours of operation of the new machine (after major overhaul), please perform in line with:

3.6.24. First oil replacement in gearboxes of uncoupled axle and axle

SV 211

81


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Case SV211 Vibratory Rollers Operator's Manual 87487731 - PDF DOWNLOAD by www.heydownloads.com - Issuu