Case CB62 Hydraulic Breaker Operator's Manual - PDF DOWNLOAD

Page 59

V. Servicing

e) Through bolt set assembly Put bottom nuts into the holes on the front head. Put washers on the holes on the back head. Insert through bolts into the holes of back head. Put top nuts on the through bolts. Then tighten the nuts with specified torque by power torque wrench. See section Torque value on page 53. NOTE! Apply torque step by step. Initial torque, intermediate torque, then final torque according to the instruction of Torque Value on page 53. NOTE! Initial setting shall be made by 15 or 20 kg.m

NOTE! Apply each step torque in “A  B  C  D” order as shown above.

NOTE! When setting through bolt and top nut before you apply initial torque, ensure through bolt top surface and top nut surface are aligned as show below.

CB62

58


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.