Skip to main content

FulkersBaileyRussell_CapStat_Commercial

Page 1

Commercial Capability Statement

www.fulkers.co.uk


Introduction. Established in 1998, Fulkers Bailey Russell (Fulkers) is a construction consultancy firm offering tailored solutions to clients investing in construction and property within the public and private sectors.

Our business is split into three key sectors: Private, Public, and Residential & Compliance, allowing us to tailor our approach to each client’s unique needs, especially as they become larger and more complex, often requiring multidisciplinary services. We strive to assist our clients in delivering successful and valuable developments.

Fulkers provides a no-nonsense, flexible, result-orientated service: A modern, forward thinking and professional practice, we value each of our clients. It is our objective to maintain a business which offers value for money and allows director attention on all projects.

2

Capability Statement: Commercial


What we do. At Fulkers, our fundamental responsibility is to improve our clients’ business by helping them achieve their goals and effecting changes to their estate as smoothly as possible. As a B Corp our commitment to working with purpose will remain at the heart of everything we do.

Our People. At Fulkers, we are driven by passion and dedication, offering independent and innovative solutions tailored to our clients’ needs. We thrive in a collaborative team environment that fosters success and consistently exceeds client expectations. Our ISO 9001 certification attests to the high quality of our services, systems, and standards.


Our Services. We offer a solutions-focused multidisciplinary approach.

Multi-Disciplinary

Project Management

Cost Management

Building Surveying

Compliance

Through partnership with our approved suppliers, we are able to provide a holistic multi-disciplinary service.

Client-side Project Management, Design Management, Contract Administration, Employer’s Agent, Construction Management, Resident Liaison.

Tender Documentation, Procurement, Contract Management, Bank/Project Monitoring, Cost Control.

Lead Consultant, Employer’s Agent, Design Management, Contract Administration,

Building Regs Principal Designer, Building Safety Advisor, Safety Case Reports, Gateway 1, 2 & 3 Applications, BSA Change Control Documentation & Management.

Acoustic Engineering, Architectural Design, Civil and Structural Engineering, Digital Surveying, Energy Design, Fire Management, Laser Scanning and Point Cloud, Lift Engineering, Mechanical and Electrical Engineering, Workplace Consultancy, BREEAM/LEED/WELL Assessors, Ecologists/Biodiversity Consultants, Passivhaus Designers and Certifiers, Carbon Accounting Consultant.

Programming & Scheduling, Supply Chain Management, Governance & Control.

Residential, Commercial, Public Buildings & Amenities, Energy Projects, MEP Projects, Data centres.

At Fulkers, our core mission goes beyond just improving our clients’ business. We’re a business that cares – about our clients, and our people. We strive to create a positive impact for all stakeholders, ensuring a smooth and successful journey for our clients whilst fostering a supportive and rewarding environment for our employees.

4

Capability Statement: Commercial

Due Diligence and Feasibility, Budget Advice & Benchmarking, Cash Flow Analysis, Commercial Governance, Whole-Life Cost Modelling.

Residential, Commercial, Public Buildings & Amenities, Energy Projects, MEP Projects, Data centres.

Feasibility Studies, Acquisition Surveys, Due Diligence Surveys, Access Surveys, Fire Door and Compartment Surveys, Fire Risk Assessments, Planned Maintenance Surveys, Condition Surveys, Dilapidation Surveys, Defect Analysis, Party Walls, Whole-Life Cost Modelling.

Extensions and Refurbishments, Public Buildings & Amenities.

CDM Principal Designer, Pre-Construction Information, Project Monitoring & Inspections.

Health & Safety Auditing, Health & Safety Monitoring, RAMS, Toolbox Talks, Documentation & Advice.


Architecture

Architectural Design (RIBA Stages 0–7), Feasibility Studies, Lead Consultant & Design, Team Coordination

Refurbishment and New Build Design, Heritage & Listed Building Works, Planning & Listed Building Applications, Space Planning & Workplace Strategy, Sustainable Construction, Energy Efficiency & Low Carbon Design, Building Regulations Compliance.

BIM (Building Information Modelling), 3D Visualisation.

Programme & Portfolio Management

Decarbonisation & Sustainability

Strategic Planning, Process Development/ Implementation/ Management, Change Management, Resource Management, Risk Management.

Building Audits & Performance Reviews, Client Sustainability Strategy Support, Funding Guidance & Application Management, Programme & Portfolio Sustainability Management, Regulatory Compliance Advisory.

Governance, Data Analysis & Reporting, Document Control.

The role is supported by our Project Management, Cost Management, Building Surveying and Building Safety Teams.

Feasibility Studies, Project Brief Development, Whole Life Cycle Assessment, Sustainability Policy Development, Sustainable Procurement Strategy.

Public Sector Decarbonisation Scheme (Salix PSDS Projects), Public Sector Estate Decarbonisation Programmes.

Building Safety

Clerk of Works

Our specialist Project Managers & Cost Managers are experienced in the execution of structural, cladding and fire remediation projects.

Site Inspections, QA Inspections, Progress Monitoring, QA Management or Monitoring.

Preparing Scopes from FRAEW’s, Implementing and Hosting the Golden Thread, Managing Condition/Fire Surveys and Resulting Remediation Works, Implementing and Monitoring Quality Control Systems.

Fieldview QA System, Hosting for Clients/ Contractors/Consultants, Management & Training, Asset Labelling Using QR Codes.

Fire Door Inspection, Compartment/ Passive Fire Protection Inspection, Fire Damper Inspections.

In collaboration with our Building Regs PD’s we are experts in remediating Higher Risk Buildings and non-HRB’s.

Big enough to cut it, small enough to care. 5


About Us.

Since the company was founded we have grown into a multidisciplinary consultancy with over 170 employees. Fully owned by three equity partners, we are not restricted by corporate red tape, we are able to take an agile and flexible approach to react to our clients needs quickly.

Richard Russell and Sam Bailey bring Richard Fulker Project and Cost establishes Building Management to Surveyors in Gravesend Fulkers in London

Fulkers establishes nationwide coverage with seven locations

Rebrand creates Fulkers Bailey Russell, with multiple UK offices and overseas affiliations

1998

2018

2019

2014

6

Capability Statement: Commercial

Strong, visible leadership from our senior teams ensures a personable approach and outstanding service delivery. We are big enough to cut it and small enough to care.

Ranked 88th in Building’s Top 100 Consultancy Firms in the UK

National finalist in the Building Awards Construction Consultant/Surveyor of the Year (fewer than 100 staff) category

Fulkers becomes an affiliated member of Northcroft, strengthening the Northcroft Global Network, particularly in the UK and Europe

Ranked 65th Building’s To Consultancy in the UK

2019

2020

2021

2021


h in op 100 y Firms

Glasgow

Manchester

Cardiff

Bristol

London Basingstoke

Kings Hill Brighton

National finalist in the Building Awards Construction Consultant/Surveyor of the Year (100+ staff) category for two consecutive years

Fulkers commits to driving positive change and officially becomes a Certified B Corporation, while growing to over 170 people and achieving turnover exceeding £17m

Named in Building’s Top 150 UK Consultants and ranked among the Top 50 Project Managers and Top 50 Surveyors for two consecutive years

2022

2023

2024

Finalist in the Construction Excellence Awards People and Culture category

Named in Building’s Top 150 UK Consultants, climbing four places in the Top 50 Project Managers table

National finalist in the Building Awards Construction Consultant/Surveyor of the Year (100+ staff) category for three consecutive years

Named in Building’s Top 150 UK Consultants, ranked among the Top 50 Project Managers and re-entering the Top 50 Surveyors table

2024

2025

2026

2026

7


Our ESG Commitment. To create awareness. Share knowledge and resource. Use of more sustainable materials and practices. Development of our focus on sustainable procurement process / policy. Develop our corporate social responsibility procurement process / policy. Invest in people and suppliers. Staff training. Ensure sustainability is at the forefront of all client conversations. To lead by example. Develop our KPI’s to reflect the above. 8

Capability Statement: Commercial


Commercial. At Fulkers Bailey Russell, we’ve been a trusted partner for businesses in the commercial sector since 1998. We empower you to achieve your goals by providing multi-disciplinary services for new builds, refurbishments, and inspiring workplace upgrades. We understand every business is unique. Our team collaborates closely with you to transform your vision into a reality. We believe in fostering a collaborative and flexible approach. Our team seamlessly integrates with yours, becoming an extension of your in-house resources. We are committed to clear communication throughout every stage of the project, keeping you informed with our proven project delivery playbook. This ensures transparency and accountability, allowing you to focus on your core business.

Through our experience, we review partnering and supply chain management to optimise both delivery and cost. We leverage economies of scale to provide you with the best market value. Additionally, we encourage collaborative problem-solving and continuous improvement through measurable targets. Our team consistently provides added value to our clients and we have a proven track record of delivering exceptional results for numerous organisations in the commercial sector.

With extensive experience in the commercial sector, our teams across the UK and internationally provide strategic advice, support and professional services at all stages in the life cycle of a project from site evaluation and initial feasibility studies to final completion.

9


Our Clients. We have worked with numerous clients in the commercial sector including: AIG Lincoln Developments AON Barclays The City of London The Foreign and Commonwealth Office HSBC KOP Properties St. George St. George South London Sky UK Limited State Oil Find of Azerbaijan Subsea 7 Surrey Research Park Whiteoaks Capital Wilmington Trust

10

Capability Statement: Commercial


Our Experience.

11


CASE STUDY:

Sky Media London. Fulkers operate as a client side consultancy embedded within the Property Services Group. As part of our role we align with Sky Project delivery toolkit, attend weekly project updates that are run through a flash report and tracker system, as well as support on internal project strategy meetings on master plan and business function projects. We pride ourselves on building very strong relationships within Sky, with the Project team, the Health and Safety team and the Services team, as well as with individual business units such as Sky IT and Security. We have embedded the principles of how the Property Service group operates in Sky with a strong focus around communication and collaboration, which is reflective of our own core values. As part of our successful relationship we are involved in supporting Sky at all levels, including at strategic level on feasibilities and Master plans. Sky operates in a fast and evolving environment, and with the strong relationship and understanding of the Sky process, we have developed to react and adapt to the project needs.

Our Experience with Sky in London includes: - Multi Storey Car Park and logistic centre with Bus terminal, £20m - Project Management toolkit and cost model tool - Nova South: CAT B fit-out of high end office space and media rooms including decommissioning of existing premises, £1.5m - Refurbishment of a Central London degraded building for a Sky affinity media company, £500k - Sky Central Cinema and Pop-up contact centre, £150k - Campus external improvements, £500k - Sky 4 Chamber RF test lab, £100k - Lisbon: CAT B fit-out of two floors for office space, £2.4m - Minerva: Refurbishment and reconfiguration of existing office spaces in different building on the Sky campus to relocate Sky colleagues, £1.5m - TMSQ: CAT B Fit out of office and breakout space, £2.8m - Scotland NEW BMS infrastructure and upgrade, £1.1m - UK-wide catering (cafés and restaurants) upgrade and refurbishment, £2.6m - UK-wide energy monitoring and metering rollout, £1.5m

12

Capability Statement: Commercial


VARIOUS PROJECTS

Location: London Value: >£35m

13


14

Capability Statement: Commercial


15


CASE STUDY:

Phase 1: Level 2 Fit-Out for Ecosurety. Fulkers provided full project and cost management services for Phase 1 of The Picture House redevelopment in Bristol: the CAT B office fit-out of Ecosurety’s new 7,000 ft² headquarters on Level 2. Delivered in just 14 weeks, the project achieved SKA Gold certification, demonstrating the highest standards of sustainability across material selection, waste, energy use, and occupant wellbeing. The space was designed to reflect Ecosurety’s B Corp values and commitment to environmental and social responsibility. Sustainability was central to every design and delivery decision. A major success was the reuse of 99% of Ecosurety’s existing office furniture, which was repurposed, reupholstered, and refreshed to integrate into the new environment. Where new furniture was required, all products were carefully selected to ensure low or zero VOC emissions, supporting indoor air quality and contributing to the project’s SKA Gold rating. The design is centred around three immersive, nature-inspired “biomes”: Rainforest, Marine, and Savanna - each offering a distinct working

16

Capability Statement: Commercial

environment that supports different modes of activity. The Rainforest zone encourages collaboration with lush planting and informal seating; the Marine zone introduces calming textures and recycled materials, including textiles made from reclaimed fishing nets; and the Savanna zone offers a quieter, focus-oriented environment with warm, earthy finishes and natural cork acoustic panels. The office integrates a smart workplace app, enabling control over lighting, heating and meeting room bookings, helping to enhance comfort and support energy-efficient operation. Phase 1 of The Picture House refurbishment has not only delivered a distinctive, high-performance workspace for Ecosurety but also embodies the company’s mission to accelerate positive environmental change. The completed space sets a benchmark for future phases of the development, offering a living example of circular, sustainable office design delivered at pace and to the highest standards.


ECOSURETY

Location: Bristol Value: £Confidential

Photography courtesy of Interaction. 17


CASE STUDY:

Ashton Gate Sporting Quarter.

BRISTOL SPORT

Location: Bristol Value: Undisclosed

The Sports & Convention Centre (the central focus of the scheme) is intended to serve as the Bristol Flyers Basketball Team’s new home and the premier events venue in the South West, building on the commercial success of the Ashton Gate Redevelopment. The 4,000-capacity venue is anticipated to become a ‘Sporting Quarter’ as well as a place for entertainment and conferences. It will stand adjacent to Ashton Gate and is hoped to host world-class exhibitions, conferences, and live events apart from sports events. The proposed Ashton Gate expansion will also include the development of a hotel, office spaces, additional housing, and a multi-storey car park. The scheme also includes the delivery of hundreds of new homes on nearby land adjacent the newly opened Metrobus M2 route near Ashton Gate Stadium.

18

Capability Statement: Commercial


CASE STUDY:

Industria.

BEFIRST REGENERATION

Location: London Value: £30m

The revolutionary business space called “Industria” elevates the industrial landscapes in Barking. This cutting-edge development provides top-tier, flexible workspaces in a striking building designed to enhance the local environment whilst setting new sustainability standards. Fulkers were appointed during the early months of the Covid 19 pandemic in 2020, providing both Project Management and Cost Management services. Using new and collaborative ways of working with the client and design team, we delivered this innovative and ambitious approach to modern industrial design. Throughout the construction period, we developed robust processes to tackle challenges around long lead times, inflationary pressures, and subcontractor insolvency to deliver the project on time and within budget.

Industria won ‘Commercial Project of the Year’ at the London Construction Awards 2024 with the judges commenting “the project is an innovative and elegant design solution and a very exciting use of industrial land, inherently sustainable with a powerful visual impact.” Following Industria’s success in the London Construction Awards, it also won the Workplace Category in the New London Awards (NLA) 2024 for its bold commitment to blending industrial uses with workplace and community spaces.

19


CASE STUDY:

41 Corn Street. 41 Corn St was built in 1964 as the new head office for the Bristol & West building society. The building’s elevation to Corn Street is characterised by its symmetry and order true to Brutalist buildings of its time, with large areas of glazing, pre-cast concrete fins and textured spandrel panels. The building was stripped back and repositioned to provide brutalist original features married to modern finishes.

IV REAL ESTATE

Location: Bristol Value: £2.5m

20

Capability Statement: Commercial

The floors offer exceptional light from the new windows that coupled with the excellent floor to ceiling height give a feeling of volume throughout the 3,000 to 19,000 sq ft of accommodation. All occupiers benefit from the shower, changing and drying facilities along with basement bike storage through a dedicated entrance. The second and fifth floors in addition offer private roof terraces for occupiers to use.


CASE STUDY:

Gilbert House. 37-39 Corn Street is an art deco building comprising 17,000 sq ft and was designed by world-renowned architect Sir Giles Gilbert Scott, famous for some of the UK’s most prominent landmarks including Battersea Power Station, Liverpool Cathedral, and the iconic red telephone box. It is now owned and managed by IV Real Estate. The Grade II listed Gilbert House has undergone a £1.5m sympathetic restoration to provide contemporary air-conditioned office floor plates from 2,000 sq ft to 9,500 sq ft.

This has included new windows, fully restored wooden floors with accessible perimeter trucking and period style WCs.

Gilbert House benefits from a communal roof terrace with far reaching views over the city and beyond. In addition, there are secure bike lockers and a fully accessible shower and changing room for tenants to use.

IV REAL ESTATE

Location: Bristol Value: £1.5m

21


CASE STUDY:

Aon Projects & Headquarters. The Fulkers team carried out Client Side roles in this project. We have completed a range of projects within £150k - £4.5M. Our role included coordinating a team of project managers to deliver multiple projects of various disciplines. High level reporting with the client. Programme and Project Management. Procurement authorisation and monitoring. At Aon we initially inherited a number of projects that had budget and programme challenges. Our role was to re-strategise to reduce impact which we did successfully by undertaking a full assessment of the brief against what was being delivered and finding opportunities through procurement, VE and readdressing priorities, as well as providing a robust delivery process focused around communication with the stakeholders. On completion of these projects we were tasked to assist in evaluating their key offices across the UK with feasibilities. We built a strong relationship with the building managers to develop the brief and inform budgets. We successfully recommended progressing into projects for each of these sites that we managed through to completion successfully based on previous project structure.

Cradley Heath, £1.4m Improvements to Heating and cooling throughout the building and refurbishment of the office for 200 staff, as well as external works providing new hard and soft landscaping and improvements to car park and drainage. Aon Leicester, £1.9m Refurbishment of entire building, office space, welfare facilities and enhanced catering offering in an occupied building. Aon Sheffield, £800k Refurbishment of welfare facilities, improvements to heating and cooling and enhanced catering offering. Aon Devonshire Square, London, £4.5m HQ office refurbishment of 10 and 11 Devonshire Square. Aon New HQ, The Leadenhall Building, £20m The project involved fitting out 200,000ft2 from shell and core a complete CAT A and CAT B fit out works to 11 floors of the building, including: - Basement 1, 2, 3 - creation of storage and back of house staff areas - Level 1 - dedicated AON reception - Level 4 - restaurant, kitchen, stores and meeting rooms - Level 5 - stores, offices, meeting rooms, and tele presence rooms - Levels 6-12 - open plan office space, collaboration space, meeting rooms, cellular offices and breakout area - Level 13 - executive suite with offices, open plan areas, collaboration space and meeting rooms

22

Capability Statement: Commercial


VARIOUS PROJECTS

Location: Various Value: £28.6m

23


CASE STUDY:

Goldman Sachs. Projects by the Fulkers team, under previous employment, include: London Cat A fit out of multiple trading floors and offices in occupied space. Works included full M&E delivery, Audio Visual (AV) implementation, IT, high security access and Uninterrupted Power Supply (UPS) for trading floors. Doha New Office fit-out in the QFC (Qatar Financial Centre). Included M&E, IT, and all access security installations Dubai New Office fit-out from Cat A on top floor of new developed building in the Dubai International Finance Centre. Works Included full M&E, AV, IT, trading floor facilities and high level Security installations.

VARIOUS PROJECTS

Location: Various Value: Undisclosed

24

Capability Statement: Commercial

Dublin New Office fit-out of existing building. Works included full M&E, AV, IT, trading floor facilities and all associated infrastructure upgrades and high level Security installations. Madrid New Office fit out from shell and core. Including full M&E, AV, IT. Trading floor facilities and high level security installations. Moscow New Office fit out from shell and core of top floor of newly constructed tower Ducat II. Works included full M&E, AV, IT, trading floor facilities and high level Security installations. Tel Aviv New office fit out from Shell and Core including full M&E, AV, IT and Security installations.


CASE STUDY:

AIG Lincoln Developments.

LAKESIDE DEVELOPMENT

Location: Romania Value: €47m

Lakeside Development Bucharest, Romania is a high profile Class A office building of 275,000ft² gross built above ground and 204,000ft² gross built underground developed on a site area of 54,000ft². The building is composed of three different height segments: GF+14+technical floors, GF+8 floors and GF+7+technical floors with four basement levels for parking and storage, as well as external landscaping around the building. The building comprised of Cat A office floors, entrance lobby and reception were three banks of internal lifts serving the building, a restaurant with 150 seats capacity on the ground floor, there were UPS rooms, generators rooms and technical rooms in the basement area, the mechanical equipment and technical rooms were located on the top floor. The client employed specialist contractors to complete the project and our roles were to provide Project/Construction Management based on site to manage the various contractors.

Targeted with responsibility to meet the key completion dates for the civil authority occupation approval, tenant’s occupation and move in dates. The roles included managing and co-ordinating the various contractors, agreeing and maintaining a realistic programme, ensuring the quality of the works, implementing a robust change control process. Our strengths on this project included: - Fast track completion programme - Quality delivery - Site Management - Coordination of all packages of work - Commercially focused.

25


CASE STUDY:

Origin Workspace.

ORIGIN WORKSPACE

Location: Bristol Value: £7m

Insider South West Property Awards 2019 - Winner (Commercial Workplace of the Year) Bristol Property Awards 2019 - Shortlisted (Transformation Category)

26

Capability Statement: Commercial


Origin Workspace has been designed to meet the needs and aspirations of the modern worker, promoting wellbeing and facilitating teamwork. The project offers 42,000ft2. of coworking space, including hot-desks, dedicated desks, cellular office space, meeting rooms, event space, and a members’ lounge. A roof terrace allows workers to enjoy the open air and sunlight, as well as stunning views of Bristol. In the members’ lounge, a kitchen and dining area allows for work breaks, networking and socialising. With its range of spaces, Origin Workspace offers a comfortable and dynamic base and networking hub for local entrepreneurs and start-ups, filling a need in the community and providing a valuable resource for growing businesses. The project has worked to a fast-paced program. The project team are delivering a strip-out, third floor and roof terrace extension and new curtain walling, finished to full fit-out in a 12-month period right through from project kick-off to occupation. The project has posed many challenges; on-going engagement with local residents and businesses, engaging with local planning authority and developing a design that will set a precedent for future projects.

As part of the planning agreement, there was a brief by Bristol City Council to reduce carbon footprint by 20%. By installing solar panels on the roof, Origin Workspace has offset in excess of 25% of its carbon footprint. Originally the building would have been fully air conditioned with heat exchanges down in the basement, which although would have been effective, would have been inefficient. The decision was taken to switch natural ventilation, with minimal air conditioning in only some areas. Phase 1 opened at 80% capacity, creating a new community made up of individuals and businesses that have selected either lounge membership, coworking or private office space. Phase 2 finishes in December, and when complete, Origin Workspace will have over 400 desks. The aim of Origin Workspace was to create something of a legacy with real attention to detail, from the top specification of furniture and fittings throughout, to the breath-taking views from the roof terrace facility. The strength and success of the space has been recognised by the Insider Media Awards (Winner of Commercial Workplace of the Year) and Bristol Property Awards (shortlisted for the Building Transformation category).

27


CASE STUDY:

British Petroleum. Our role at BP involved supporting the Capital Projects team directly, reporting into the project management office as well as reporting directly into the BP building sponsor.

Projects include:

As part of our role we also supported the operations team providing feasibilities for infrastructure and MEP upgrades and then overseeing in a Programme Manager role for project delivery.

- Stockley Park: new Restaurant and kitchen, £1.2m

- Stockley Park: shower and toilet refurbishments, £800k - Sunbury: external works enhancement, £600k

- Compass Point: entrance lobby and café, £850k - Stockley Park: MEP and controls upgrade, £1.2m - BP Chairman’s office and board room - Stockley Park: two level car park and civil works, £3.5m - Compass Point: energy and controls project, £2.3m - Sunbury office fit out, £1.1m - BP, Baku, Azerbaijan: Project Management of the testing of all utilities to the residential properties owned by BP in Azerbaijan and required remedial works, $5m per annum.

VARIOUS PROJECTS

Location: Various Value: £15m

28

Capability Statement: Commercial


CASE STUDY:

Barclays Bank.

VARIOUS PROJECTS

Location: Various Value: £16.6m

The Fulkers team have provided client side consultancy services, reporting into the PMO within the Barclays Capital project team. As part of the role managing the delivery of projects we had to provide weekly snapshots reporting upstream on programme and costs with bi-weekly formal meetings with the PMO and Commercial Head, to run through in detail the status of our projects. We supported in the development of Barclays Capital project delivery process in particular around reporting formats and developing a robust change control process. As part of our role we also undertook independent CA services across Barclays’ subsidiaries and tenants construction projects. Our role also involved overseeing a number of oversees projects, acting as the Barclay’s client representative with local teams reporting directly in to us. We built a strong relationships with the PMO and Commercial Head to fully understand and report accurately against the robust delivery model, to feed into the fortnightly and monthly internal project board reviews.

As part of managing the process correctly and to a high standard we were given the responsibility of acting as client representative managing oversees projects as well as being given the responsibility to act as independent CA for Barclays tenants and partners. Our project with Barclays have included: - 10SC: fit-out of two floors, £1.5m - Nicosia: CAT A and B fit-out, £1.6m - Limassol: CAT A and B fit-out, £1.8m - Barclays, Canary Wharf: CAT A (Barclays) and CAT B (tenant) of Level 5, 10 South Colonnade, £5.5m - Barclays, Canary Wharf: refurbishment of 3 rooms of a client dining area and the upgrade of the reception to a high specification, £1.7m - Barclays Capital, London: refurbishment and extension of male and female toilets over four floors, £1.9m - Barclays Capital, London: refurbishment of a traditional office floor to a modern open plan style and alternative working solution, £2.6m

29


CASE STUDY:

State Oil Fund of Azerbaijan HQ. A new 24-storey high commercial office tower in central Baku, the Project consists of construction of the new headquarters for the State Oil Fund of Azerbaijan (SOFAZ). The Project comprises of an intelligent office building with two underground parking floors, three floors above ground “podium” including common areas (restaurants, cafeteria, library, conference hall, board meeting facilities, a museum of the national leader of the country, a conference hall for 200 seats etc.), eighteen open space office floors including Executive Director’s floor and three technical floors, landscaping the site boundary. The external envelope comprised of glass active façade with stone feature bands at lower levels. The building was one of the first to received BREEAM certification in Azerbaijan. The internal finishes were of an extremely high standard with specialist marble from one quarry in Italy, bespoke panelling and finishes to many areas including the VIP areas, conference hall. The entrance reception area included and specialist waterfall approximately 43ft high x 21ft wide with pool, there were meeting/ function areas on the ground floor and fourth floor.

30

Capability Statement: Commercial

The security installation was of a high specification including bomb blast doors to certain areas. We were responsible for the Project Management on the project and our roles which included managing the main contractor, the design submittal process, monitoring and reviewing the programme to ensure that the agreed dates were achieved, valuing the works and ensuring the change control process was strong, checking on quality of the works and ensuring the high standard was achieved throughout the project with agreed samples and mock ups. Our strengths on this project included: - Strong commercial acumen - Value engineering - Quality control on the construction and finishes - Robust control of the contractor’s submittals and change requests - Design management co-ordination - Cost management and budget controls.


NEW HEADQUARTERS

Location: Baku Value: €107m

31


CASE STUDY:

St. George. The London Dock Residential Area is being developed by St George. St George creates vibrant new residential and mixed-use developments across the capital.

‘The Tower, One St George Wharf’ was developed by St George South London. St George creates vibrant new residential and mixed-use developments across the capital.

Development of 1,800 homes in the London Dock area. Proposals for the 15 acre site include affordable homes as well as a site for a new sixth form entry secondary school, commercial space and pedestrian routes.

London’s tallest residential-only tower sits on the banks of the River Thames in London’s Vauxhall district. The tower stands at just over 180m, making it one of Europe’s tallest wholly residential buildings.

LONDON DOCK RESIDENTIAL AREA

Location: London Value: Undisclosed

32

Capability Statement: Commercial


CASE STUDY:

HSBC Hong Kong.

HSBC

Location: Hong Kong Value: Undisclosed

Founded in 1865 to finance trade between Asia and the West, today HSBC is one of the world’s largest banking and financial services organisations serving some 52 million customers. The project involved the largest management contract project ever carried out in Hong Kong, with innovative structural design and architectural fit-out.

33


CASE STUDY:

Leonardo.

VARIOUS PROJECTS

Location: UK Value: £50m

34

Capability Statement: Commercial


Fulkers Bailey Russell provide Multidisciplinary services to Leonardo across their UK estate. As part of our partnering approach we have undertaken an extensive review of their Project delivery model, creating a more agile approach that is industry aligned yet still bespoke to Leonardo’s culture and structure. This promotes best practice and implements a governance process for projects to be delivered against. For Leonardo, we support and manage the estate strategy and new ways of working that incorporate more flexible multifunctional environments to meet their vision on new energy and sustainability targets, as well as providing business continuity and developing whole life cycle costing for business cases.

Our Project and Cost Managers work very closely together and with the estates team providing input on the strategic planning with the common goal to enhance the environments, find opportunities to reduce real estate footprints and to drive sustainability and modern methods of construction. As part of the above we are leading the masterplan estate team looking at the opportunities to enhance the Yeovil campus by redeveloping the campus by re-purposing existing buildings, provide new builds that are more efficient from space and energy and to enhance the current infrastructure. The plan is to implement this over the next several years and looking at funding opportunities to achieve this.

We are also delivering a diverse range of projects ranging from M&E upgrades, security, fire, new custom working for collaborative environments, data centre upgrades, feasibility planning and schedule, labs and clean rooms and supporting the management of the incumbent FM providers on maintenance projects.

35


CASE STUDY:

KOP Properties. KOP Properties is a developer with a diverse range of businesses from residential and commercial properties, hotels and resorts to yachts. 10 Trinity Square is a grade II* listed building in the City of London, built in the 1910s. The development proposes to convert the building into a 120 key luxury hotel with 41 high spec residential apartments.

10 TRINITY SQUARE

Location: London Value: Undisclosed

36

Capability Statement: Commercial


CASE STUDY:

Central Bank of Azerbaijan.

NEW HEADQUARTERS

Location: Baku Value: $400m

Members of the Fulkers Bailey Russell team have worked for the Central Bank of Azerbaijan as Project Managers for the design and development of the new iconic skyscraper in Baku. The team have led the co-ordination of the design development and the tender process to RIBA Stage 4. The building is a 37-storey twin tower construction connected by a full height glass atrium and includes a twisted glass façade. Located on the Haydar Aliyev Avenue the building creates an imposing image across the Baku City Skyline. The construction of the enabling works was managed also including the excavation of the basement levels through solid bedrock in preparation for the construction.

The building also included staff restaurants and extensive security measures and automated banking systems. The façade system was designed to be a closed cavity façade system. The project was successfully tendered within budget and subsequent interviews and negotiations were held including a value Engineering workshop to reduce costs by £60m at the client’s instruction.

The design was developed following the clients brief to create an iconic building of circa 969,000ft2 to relocate and consolidate the existing staff.

- Value engineering

Our Strengths on this project include: - Design management co-ordination - Strong commercial acumen - Tender preparation and Analysis

- Cost management and budget controls.

37


CASE STUDY:

Wilmington Trust London. Fulkers worked with Wilmington Trust to expand their office space onto an additional floor plate of 18,000 sq.ft. Wilmington Trust required the floor to be fitted out and handed over within a short programme so they could accommodate additional staff. The project was let using a JCT Design and Build contract. In addition, to improve the programme further, the contractor was appointed under an enabling works package so they could commence the strip-out and enabling works. While these works were being undertaken the design was finalised and the contract sum agreed. The works involved new M&E equipment to suit the new layout, installation of a kitchenette, SER room, meeting rooms, open plan offices and a new reception area.

OFFICE EXPANSION

Location: London Value: Undisclosed

38

Capability Statement: Commercial

During the negotiation process the client requested that their existing floor was also refurbished which put pressure on the programme as swing space was required to ensure staff had access to a desk at all times. To keep to the programme, weekend working was required which the cost was agreed in advance to avoid disputes later. This project was a challenge as it was in an multi-tenanted building with limited access in the middle of the city.


CASE STUDY:

Aldermanbury Square London.

CITY OF LONDON

Location: London Value: Undisclosed

Fulkers has delivered a variety of projects for the City of London (CoL) and was asked to provide professional services to explore a variety of refurbishment, extension, redevelopment and value engineering options of the site & buildings, with the chosen option to be fully developed and carried through to construction. Part of the brief was to look at how the different options would impact CoL’s use of each building and the revenue generating potential of each proposal. 20 - 21 Aldermanbury was acquired by CoL to form part of their adjoining and surrounding Guildhall complex in central London. Building 20 (29,200 sq. ft.) is a Grade II listed building with original features externally and internally, which requires sensitive restoration works to be kept for the City’s own use and event space. This involves a full replacement of the M&E fit out and transformation of existing rooms into event spaces. A separate option appraisal exercise was undertaken to establish the viability & impact of adding an 2nd lift to the building from both a heritage and end user perspective. Building No. 21 (11,440 sq. ft.) is a 5 storey stacked office block, which is to be fully refurbished for 3rd party letting purposes including a café at ground floor. The proposal also includes a ground floor extension, new M&E, window replacement with additional façade upgrades and a new structural staircase and lift shaft.

39


Big enough to cut it small enough to care.

www.fulkers.co.uk

40

LondonCommercial l Basingstoke I Brighton I Bristol | Kings Hill l Manchester Capability Statement:


Turn static files into dynamic content formats.

Create a flipbook