Skip to main content

FulkersBaileyRussell_CapStat_HigherEducation

Page 1

Higher Education Capability Statement

www.fulkers.co.uk


Introduction. Established in 1998, Fulkers Bailey Russell (Fulkers) is a construction consultancy firm offering tailored solutions to clients investing in construction and property within the public and private sectors.

Our business is split into three key sectors: Private, Public, and Residential & Compliance, allowing us to tailor our approach to each client’s unique needs, especially as they become larger and more complex, often requiring multidisciplinary services. We strive to assist our clients in delivering successful and valuable developments.

Fulkers provides a no-nonsense, flexible, result-orientated service: A modern, forward thinking and professional practice, we value each of our clients. It is our objective to maintain a business which offers value for money and allows director attention on all projects.

2

Capability Statement: Higher Education


What we do. At Fulkers, our fundamental responsibility is to improve our clients’ business by helping them achieve their goals and effecting changes to their estate as smoothly as possible. As a B Corp our commitment to working with purpose will remain at the heart of everything we do.

Our People. At Fulkers, we are driven by passion and dedication, offering independent and innovative solutions tailored to our clients’ needs. We thrive in a collaborative team environment that fosters success and consistently exceeds client expectations. Our ISO 9001 certification attests to the high quality of our services, systems, and standards.


Our Services. We offer a solutions-focused multidisciplinary approach.

Multi-Disciplinary

Project Management

Cost Management

Building Surveying

Compliance

Through partnership with our approved suppliers, we are able to provide a holistic multi-disciplinary service.

Client-side Project Management, Design Management, Contract Administration, Employer’s Agent, Construction Management, Resident Liaison.

Tender Documentation, Procurement, Contract Management, Bank/Project Monitoring, Cost Control.

Lead Consultant, Employer’s Agent, Design Management, Contract Administration,

Building Regs Principal Designer, Building Safety Advisor, Safety Case Reports, Gateway 1, 2 & 3 Applications, BSA Change Control Documentation & Management.

Acoustic Engineering, Architectural Design, Civil and Structural Engineering, Digital Surveying, Energy Design, Fire Management, Laser Scanning and Point Cloud, Lift Engineering, Mechanical and Electrical Engineering, Workplace Consultancy, BREEAM/LEED/WELL Assessors, Ecologists/Biodiversity Consultants, Passivhaus Designers and Certifiers, Carbon Accounting Consultant.

Programming & Scheduling, Supply Chain Management, Governance & Control.

Residential, Commercial, Public Buildings & Amenities, Energy Projects, MEP Projects, Data centres.

At Fulkers, our core mission goes beyond just improving our clients’ business. We’re a business that cares – about our clients, and our people. We strive to create a positive impact for all stakeholders, ensuring a smooth and successful journey for our clients whilst fostering a supportive and rewarding environment for our employees.

4

Capability Statement: Higher Education

Due Diligence and Feasibility, Budget Advice & Benchmarking, Cash Flow Analysis, Commercial Governance, Whole-Life Cost Modelling.

Residential, Commercial, Public Buildings & Amenities, Energy Projects, MEP Projects, Data centres.

Feasibility Studies, Acquisition Surveys, Due Diligence Surveys, Access Surveys, Fire Door and Compartment Surveys, Fire Risk Assessments, Planned Maintenance Surveys, Condition Surveys, Dilapidation Surveys, Defect Analysis, Party Walls, Whole-Life Cost Modelling.

Extensions and Refurbishments, Public Buildings & Amenities.

CDM Principal Designer, Pre-Construction Information, Project Monitoring & Inspections.

Health & Safety Auditing, Health & Safety Monitoring, RAMS, Toolbox Talks, Documentation & Advice.


Architecture

Architectural Design (RIBA Stages 0–7), Feasibility Studies, Lead Consultant & Design, Team Coordination

Refurbishment and New Build Design, Heritage & Listed Building Works, Planning & Listed Building Applications, Space Planning & Workplace Strategy, Sustainable Construction, Energy Efficiency & Low Carbon Design, Building Regulations Compliance.

BIM (Building Information Modelling), 3D Visualisation.

Programme & Portfolio Management

Decarbonisation & Sustainability

Strategic Planning, Process Development/ Implementation/ Management, Change Management, Resource Management, Risk Management.

Building Audits & Performance Reviews, Client Sustainability Strategy Support, Funding Guidance & Application Management, Programme & Portfolio Sustainability Management, Regulatory Compliance Advisory.

Governance, Data Analysis & Reporting, Document Control.

The role is supported by our Project Management, Cost Management, Building Surveying and Building Safety Teams.

Feasibility Studies, Project Brief Development, Whole Life Cycle Assessment, Sustainability Policy Development, Sustainable Procurement Strategy.

Public Sector Decarbonisation Scheme (Salix PSDS Projects), Public Sector Estate Decarbonisation Programmes.

Building Safety

Clerk of Works

Our specialist Project Managers & Cost Managers are experienced in the execution of structural, cladding and fire remediation projects.

Site Inspections, QA Inspections, Progress Monitoring, QA Management or Monitoring.

Preparing Scopes from FRAEW’s, Implementing and Hosting the Golden Thread, Managing Condition/Fire Surveys and Resulting Remediation Works, Implementing and Monitoring Quality Control Systems.

Fieldview QA System, Hosting for Clients/ Contractors/Consultants, Management & Training, Asset Labelling Using QR Codes.

Fire Door Inspection, Compartment/ Passive Fire Protection Inspection, Fire Damper Inspections.

In collaboration with our Building Regs PD’s we are experts in remediating Higher Risk Buildings and non-HRB’s.

Big enough to cut it, small enough to care. 5


About Us.

Since the company was founded we have grown into a multidisciplinary consultancy with over 170 employees. Fully owned by three equity partners, we are not restricted by corporate red tape, we are able to take an agile and flexible approach to react to our clients needs quickly.

Richard Russell and Sam Bailey bring Richard Fulker Project and Cost establishes Building Management to Surveyors in Gravesend Fulkers in London

Fulkers establishes nationwide coverage with seven locations

Rebrand creates Fulkers Bailey Russell, with multiple UK offices and overseas affiliations

1998

2018

2019

2014

6

Capability Statement: Higher Education

Strong, visible leadership from our senior teams ensures a personable approach and outstanding service delivery. We are big enough to cut it and small enough to care.

Ranked 88th in Building’s Top 100 Consultancy Firms in the UK

National finalist in the Building Awards Construction Consultant/Surveyor of the Year (fewer than 100 staff) category

Fulkers becomes an affiliated member of Northcroft, strengthening the Northcroft Global Network, particularly in the UK and Europe

Ranked 65th Building’s To Consultancy in the UK

2019

2020

2021

2021


h in op 100 y Firms

Glasgow

Manchester

Cardiff

Bristol

London Basingstoke

Kings Hill Brighton

National finalist in the Building Awards Construction Consultant/Surveyor of the Year (100+ staff) category for two consecutive years

Fulkers commits to driving positive change and officially becomes a Certified B Corporation, while growing to over 170 people and achieving turnover exceeding £17m

Named in Building’s Top 150 UK Consultants and ranked among the Top 50 Project Managers and Top 50 Surveyors for two consecutive years

2022

2023

2024

Finalist in the Construction Excellence Awards People and Culture category

Named in Building’s Top 150 UK Consultants, climbing four places in the Top 50 Project Managers table

National finalist in the Building Awards Construction Consultant/Surveyor of the Year (100+ staff) category for three consecutive years

Named in Building’s Top 150 UK Consultants, ranked among the Top 50 Project Managers and re-entering the Top 50 Surveyors table

2024

2025

2026

2026

7


Our ESG Commitment. To create awareness. Share knowledge and resource. Use of more sustainable materials and practices. Development of our focus on sustainable procurement process / policy. Develop our corporate social responsibility procurement process / policy. Invest in people and suppliers. Staff training. Ensure sustainability is at the forefront of all client conversations. To lead by example. Develop our KPI’s to reflect the above. 8

Capability Statement: Higher Education


Higher Education. Fulkers has been working on projects in the higher education sector for almost twenty five years. During this time we have gained an enviable reputation for delivering projects for a number of the major universities and, as such, have an excellent understanding of this sector. We realise that in order to attract students, it is imperative for contemporary universities to provide first class facilities for students to live, learn and socialise in. It is incumbent upon us to deliver projects fit for the 21st Century. We understand the specific challenges that face the higher education sector including delivery of construction projects outside of term time; business continuity; complex funding processes; meeting sustainability targets; student and stakeholder engagement.

In the higher education sector, our experience includes the provision of all types of teaching and seminar rooms; lecture theatres; libraries; medical and research laboratories up to containment level 3 standard; MRI Suites; engineering workshops; student social and leisure facilities; student accommodation; and all office and ancillary support services. We have also been consulted on all types of repair and maintenance of our clients’ estates.

At Fulkers, we strive to deliver environments which improve the quality of students’ lives; spaces which enrich the quality of learning and teaching, focus on developing learning and creativity and improve the well-being of students within the higher education sector and beyond.

We allocate a dedicated team of experienced staff, led by a director, onto each of our projects. We encourage clear ownership of tasks and transparent lines of communication within the team, as well as with our client. Our aim is to foster close working relationships and mutual understanding, and to offer continuity. As such, and where possible, the same director always works with the same client, building their knowledge of each particular university and maintaining working relationships.

Our management team has a successful track record of acting as project lead for a number of our framework and non-framework commissions within the education sector. They provide a strategic lead, adopting a client-centric approach. Our clients have full access to our directors at all times in order to discuss any issues that may arise.

9


Our Clients.

10

Capability Statement: Higher Education


Our Frameworks. Fulkers are currently appointed to the following frameworks under which individual contracts can be made. To appoint us via one of the below frameworks, please click on the logo for more details.

*

*Fulkers are appointed to the Government Commercial Agency framework in joint venture with Ward Williams, operating under the name Fulward.

11


Our Experience.

13


CASE STUDY:

University of Brighton. Fulkers have maintained a long standing working relationship with the University of Brighton for many years, having supported on a diverse portfolio of projects in a multi-disciplinary capacity. Brighton University’s “Big Build” Masterplan Fulkers have successfully contributed to the delivery of Brighton University’s “Big Build” Masterplan from 2017 to 2024. The redeveloped campus in the suburb of Moulsecoomb transformed what was a former car park into a vibrant new centre for living and learning. Projects included: - Advanced Engineering Centre, £14m - Parking Facility, £11m - uLiving, Mithras Halls of Residence, £125m - Elm House, Brighton Business School, £32m - Pedestrian Bridge, £3.8m - Fired Engine Test Cell PaREGEn project, £280k - Moulsecoomb Campus Refurbishment, £1.1m

Brighton Estates Strategy 2025 Fulkers are currently appointed to manage the delivery of the University’s “Brighton Estates Strategy 2025” focussing on the Falmer Campus which is set in the South Downs, 4 miles away from Brighton city centre. With the overall goal being for the University to better integrate with its surroundings, the project includes a number of refurbishments and relocations including the following: - Mithras House Refurbishment – Co-location of the School of Humanities and Social Science, £7.9m - Sport and Health Hub, £4.2m - Sports Science Building, £4.2m - Watson House refurbishment – School of Health, £4.35m - Westlain and Checkland Staff Spaces, £500k - School of Sports Science and Health Relocation, £250k To support the new buildings and areas being created as part of the Brighton Estates Strategy 2025, Fulkers have been retained to scope, procure and manage the largest relocation operation in its history. Combining multiple sites and various specialist equipment, over 200 staff and via a phased programme to seamlessly transition an entire campus from Eastbourne to the new spaces in Falmer.

Project: Advanced Engineering Centre

14

Capability Statement: Higher Education


Project: Mithras Halls of Residence

Location:

Brighton

Project: Elm House

Total Value:

£210m

15


CASE STUDY:

University of Sussex. The University of Sussex is situated on a large and open greenfield site in the South Downs in East Sussex, on the edge of the city of Brighton and Hove.

The campus, designed by Sir Basil Spence, is much lauded

-

in the architectural community, with many of the buildings on the university’s campus winning awards. In 1993, the buildings which made up the core of Spence’s designs were given listed building status, with Falmer House being

Annual General Teaching Space and Lecture Theatre Refurbishments, £1m

-

Data Centre and Office Refurbishment, £1.5m

-

Falmer Sports Complex Roof Project, £700k

one of only two buildings to be given a Grade I status of “exceptional interest”. Fulkers has been assisting the

Under previous employment, members of our

Estates and Facilities team, working at the University of

team have delivered the following projects:

Sussex and latterly with Sussex Estates and Facilities (SEF)

-

Swanborough New Build Residence, £12m

-

Fulton New Build Teaching Building, £11m

-

Library Refurbishment, £6m

-

District Heating and Combined Heating

since 2004. The different types of projects and approximate values are listed below: -

Masterplan Enabling Works and Infrastructure Upgrade, £5m

-

Power M&E Installation, £5.5m -

Catering Outlets Refurbishments, £11m

Annual Academic and Residential Long-Term Maintenance/Compliance Refurbishments, £2m

-

Annual Minor Works Refurbishments and Fitouts, £1m

Location:

Brighton

16

Capability Statement: Higher Education

Total Value:

£56.7m


17


CASE STUDY:

Imperial College London. Fulkers first began working with Imperial College London in September 2020 and in the years since we have developed a strong working relationship resulting in multiple repeat commissions across the university’s portfolio across both their campuses in West London.

Commonwealth Building, £3m This project for Imperial College London included the refurbishment of two floors of an existing building to create new laboratory and office spaces. Our first commission as consultant Project Managers for the university involved four separate projects across 2 floors of the Commonwealth Building at the Hammersmith Campus. The projects on Level 4 and Level 7 were undertaken during 2020 and 2021, with the last project completed in March 2022.

Location:

London

18

Capability Statement: Higher Education

Total Value:

£34.5m


South Kensington Laboratory, £1.5m We are delivering new laboratory accommodation, which is being relocated from the university’s St Mary’s Building to their Sir Alexander Fleming Building on the South Kensington Campus. The project will deliver purpose-built laboratories and requires a high level of stakeholder engagement with existing users and adjacent projects.

Clinical Research Building, £40m We are refurbishing 5,800sqm in a clinical research building to accommodate research laboratories for 140 staff and 45 PhD students. The works consist of a combination of containment level 3 laboratories (CL3), containment level 2 laboratories (CL2), ancillary laboratory rooms, office spaces and a canteen. The project team are appointed under an NEC4 contract, with the main contractor procured using a two-stage Design & Build Contract. The project has many constraints and risks, including a logistically challenging site within a hospital campus and land locked on all three sides. The ground, first and second floors also house very sensitive biological research which cannot be disrupted during the works. The scope also consists of a major overhaul of the existing M&E plant, equipment and new incoming power supply which needs to be managed very carefully. The project is targeting sustainability measures such as BREEAM and Net Zero Carbon (NZC), with possible Salix funding.

19


CASE STUDY:

London South Bank University. Fulkers are working to deliver multiple projects for London South Bank University (LSBU) across all their campus’. LSBU have developed a masterplan referred to as the St George’s Quarter for their Southwark Campus, which includes the London Road Building and the Chapel. Additionally there is the Electric House refurbishment in Croydon; and the new Lambeth College STEAM Building at Vauxhall. London Road Building (LRB), £48m The first phase of the Southwark Campus redevelopment was the extensive refurbishment of the existing LRB to provide: significantly improved teaching facilities, lecture theatres and seminar spaces. In addition, The Hub as it is now referred, has a new Academy of Sport called LSBU Active and a refectory on the lower ground floor and a Grab and Go and Exhibition space on the ground floor. A new library occupies the upper floors providing group learning spaces with access to an external courtyard and quiet spaces for students. A blue roof was constructed, including lightwells, and a brand-new façade to allow more light into the building and views out, connecting the occupiers of the building to the world outside. The project achieved a BREAAM ‘Excellent’ rating and was delivered using BIM Level 2.

St George’s Quarter, £120m The second phase, St George’s Quarter, is a new build seven-storey learning centre and a five-storey creative design centre with a concourse between the two new buildings, which also links in with the existing LRB (Phase 1) and that will act as a community and student “front door” to the Southwark Campus, allowing 24/7 access and improved connectivity. The building will provide and accommodate a learning resource centre, new lecture theatres and student support services. The project aims to achieve a BREAAM ‘Excellent’ rating and is being delivered using BIM Level 2.

20

Capability Statement: Higher Education


Electric House, £700k Fulkers were appointed to provide project management and employer’s agent professional services for this project and to manage the overall build as well as coordinating the fit-out and refurbishment of Electric House in a live campus environment. The site is Grade II listed and was originally constructed as electricity showrooms and offices in 1939. Electric House is a mix of open plan and enclosed spaces, providing new and improved teaching spaces and communal areas. The works included significant internal alterations in connection with the future use of the building, making good of various existing features, external alterations, and installation of new plant. Fulkers were also appointed to coordinate and manage the direct installations, IT, AV, and FF&E.

Electric House, Courtyard, £640k

The Chapel, £20m

After the Electric House project completed, Fulkers’

The Chapel is a Grade II listed building on the north side

appointment was extended courtyard works. We are

of the St George’s Quarter masterplan and the works

providing project management, contract administration

involved demolishing the entire building, which was

and quantity surveying services on this project which

derelict, whilst retaining and maintaining the existing

is currently in progress, and consists of a complete

façade. The initial plan was to construct a Creative Design

refurbishment and upgrade of the external paved area

Centre comprising a performance theatre and dance

and repairing and upgrading all below ground services.

studios, as well as new teaching spaces.

Lambeth College STEAM Building, £27.5m

London Road, Section 278 Works, £106k

Fulkers have also been appointed to support LSBU in the

As part of the St George’s Quarter masterplan, Fulkers

consolidation of Lambeth College’s existing campus in

were appointed as Project Management, Employer’s

Clapham to a new campus in Vauxhall. The development

agent, and Quantity Surveyors to re-align the roadworks

comprises a 108,000sqft STEAM centre and 161,000sqft of

around and into the new London Road Hub. The scope

further education space. Both faculties offering courses in

included hard landscaping involving new pavement

construction, engineering, electrics, plumbing, brickwork,

and kerb lines, bin store and loading bay, relocation of

science, dental, ICT, computing, Maths and English.

streetlights, and underground services, and a new bin store. The works are due to be completed end of 2023.

Location:

London

Total Value:

£217m

21


CASE STUDY:

University of Bristol. The Fulkers team have provided, and continue to provide, a range of construction consultancy services to the University of Bristol (UoB) on a variety of projects across their portfolio. In addition, we are acting as ‘Development Managers’ to support and bolster capacity within the newly formed Campus Planning team, providing specific property expertise to assess the viability of proposals. National Composites Centre, £27m The National Composites Centre (NCC) is a wholly owned subsidiary of the UoB and a notfor-profit organisation with a mission to be an open-access national centre that delivers world class innovation in design and rapid manufacture of composites, whilst facilitating the university’s widespread industrial exploration. This means the project had to incorporate facilities developed for diverse stakeholders with large assembly areas and research facilities. After successful expansion of activities in the Phase 1 building of the NCC, the university were looking to build an extension to over double the existing facility to circa 86,000sqft, as the existing facilities approached capacity. Phase 2 includes laboratory specification cleanrooms, freezer stores, training, conference, office and ancillary spaces. The extension houses three gantry cranes and one of the largest hydraulic presses of its kind in Europe - for high volume composite manufacturing.

The Brinsea Building, £2.5m The Brinsea Building was designed to replace existing facilities on the university campus, including an anatomy study centre providing a nationally renowned teaching programme for veterinary students. The building adapted and extended a previous commercial unit on the site to create the new facilities.

22

Capability Statement: Higher Education

The design was developed in conjunction with technical staff to ensure that potential contaminants could be controlled through passive zoning of the building, and active systems were established to manage airflow, drainage and cleaning.


Temple Quarter Enterprise Campus Phase 2 £Confidential This project is to provide outline planning consent for the second phase of the university’s new campus across 30,000sqm of land and for c1,000,000sqft of education and commercial space. Fulkers provided project management services from inception to receipt of outline planning consent. The project sits within the middle of an area prime for regeneration with this project the catalyst. Extensive engagement with neighbouring plot owners has been undertaken with a coordinated masterplan for flood, transport, and design progressed. The site includes listed buildings and is sat within a conservation area. Engagement with the local planning authority has been extensive. The Sheds, £Confidential The Sheds project included an extensive enabling works package procured under a JCT traditional form of contract. The roof coverings were replaced whilst retaining the heritage metal roof trusses and stone walls. Structural adjustments were made to the existing mezzanine and the slab replaced. The hi-tech fit-out was procured under a JCT Design and Build contract. Campus Planning Work, £Confidential Fulkers have also been engaged with UoB for the last two years as Development Managers in their new Campus Planning team. Leading the programme of RIBA Stage 0 and 1 projects from referral to handover to Delivery Partners in Capital Projects or Campus Operations. Part of our work has been determining the Campus Planning plans and processes and integrating these with existing governance, capital projects software and processes, including the handover process between teams to ensure continuity for stakeholders.

Location:

Bristol

We have also led the stakeholder management and integration within the campus division to assist the development of the university’s framework plan, and maintained a forward look for capital project and sustainability colleagues to ensure sufficient resource is allocated to support the campus planning team.

Total Value:

£29.5m+

23


CASE STUDY:

Kingston University. Fulkers were first appointed on Kingston University London’s framework for professional services in early 2015 and we were subsequently reappointed onto the Estates Consultancy Framework, which was testament to our excellent working relationship with the University. Over the past 8 years Fulkers have successfully managed a number of projects for the University, including: Town House

Kingston Hill & Penrhyn Road

Situated at the heart of the Penrhyn Road Campus, the

Fulkers worked on the masterplanning for the

new six-storey landmark building houses the

redevelopment of two interrelated campuses housing

University’s largest learning resources centre, spanning

the Faculty of Music, Science and Technology, the

five floors, along with dedicated specialist space

School of Education and administration facilities. This

for performing arts related courses and a significant

involved new build and refurbishment projects totalling

auditorium space that is used for special events. Flexible

64,000sqm planned over 10 years. The planned projects

technology is utilised throughout to support innovative

needed to be carefully integrated into the existing dense

studying and collaborative group work. The development

accommodation and the site had several challenges as it

also provides a large covered courtyard and cafés. The

is in an area of archaeological and ecology significance.

building is rated BREEAM ‘Excellent’ and took home the

Fulkers worked closely with the design team and the

RIBA Stirling Prize in 2021.

university to explore various options within the constraints.

Seething Wells Accommodation

Fire Improvement Works

Kingston University’s Seething Wells campus includes

The Fulkers team have been responsible for managing

four Grade II listed buildings which required extensive

a campus wide fire compartmentalisation improvement

refurbishment and as well as converting storage spaces

project spread across various phases. The brief was to use

into enterprise space for small local businesses. Fulkers

the university’s existing plans for each building and survey

assisted the university with the application of grants

all fire compartmentalisation and fire doors, producing

from various bodies. This project also involved exploring

a schedule of works required for each building to ensure

options to add additional student accommodation onto an

fire compliance.

already congested site.

Chancellors Hall Accommodation Feasibility studies were undertaken for the refurbishment

The site has several constraints including sloping of

of the Chancellors Hall student accommodation which

land, blanket tree preservation orders, badgers and bats.

included building extensions to provide new kitchen and

Fulkers worked with the university to maximise

breakout spaces for the flats.

the potential for the site and provided various studies including life cycle costing, payback studies and reviewing the local accommodation market.

24

Capability Statement: Higher Education


STEM Teaching Laboratories Refurbishment and Associated Works

67 Penrhyn Road

This project involved the refurbishment of an existing

refurbishment to a 2 bedroom Victorian residential

space to create a science, technology, engineering,

dwelling adjacent the Penrhyn Road Campus. Works

and mathematics (STEM) outreach centre, teaching

included Fabric and M&E upgrades throughout the

space and to install 552sqm of new laboratories in the

property to provide good quality student accommodation.

Fulkers are currently working on the internal and external

existing office space of an occupied building; the works were undertaken in 2 phases. Fulkers provided project management and contract administration professional services, holding extensive and regular meetings with stakeholders and end users throughout the project lifecycle to ensure that the designs were truly coordinated and fit for purpose.

Location:

London

Total Value:

Confidential

25


CASE STUDY:

King’s College London. Kings College London (King’s) are one of Fulkers’ longest standing clients. Fulkers have been members of the university’s framework for over 20 years and have provided a range of services for numerous projects across the university’s sites. Fulkers have also been appointed as single suppliers for projects, providing consistency of scope and service to King’s. This is testament to the value that the university place on Fulkers’ services. Student Accommodation Masterplanning, £135m A large-scale study to assess the university’s current and future student accommodation strategy looking at phased refurbishment works and new build projects to increase the university’s 1,200 beds to 1,500 beds over a five year period. Hunt’s House, £4m The internal alteration and repair of the Grade II listed Hunt’s House building situated on The Strand, which includes a library covering all aspects of biomedical science.

26

Capability Statement: Higher Education

New Medical School Laboratories, £2.2m The refurbishment of five medical research laboratories in the New Medical School.

Maudsley Hospital MRI Suite, £1.5m Fulkers were appointed as single suppliers to support King’s in the delivery of a new MRI Suite at The Maudsley Hospital’s Centre for Neuroimaging Sciences.


London Institute for Healthcare Engineering (LIHE), £34m This new four-storey building at King’s College London’s St Thomas’ campus provides a state-ofthe-art home for the London Institute for Healthcare Engineering (LIHE). Fulkers were appointed as Project Manager, Contract Administrator and Programme Manager for the £34m scheme, which has since won a prestigious 2026 UK RIBA London Award. Embedded within the St Thomas’ Hospital campus, LIHE brings together world-class research and development expertise from academia, the NHS and MedTech companies, driving innovation in medical technology and improving patient outcomes. We are proud to have supported King’s in delivering this award-winning facility.

Location:

London

Decarbonisation Work, £Confidential Fulkers have been commissioned to support driving the King’s decarbonisation strategy forward. Focusing upfront on the heat decarbonisation element across the university’s estate. Fulkers are responsible for the definition and implementation of a strategy to achieve adjustments to energy consumption to meet the University’s carbon reduction targets for 2030 and to achieve Carbon Net Zero by 2050. KIS (Kings Integrated Sciences), £Confidential Fulkers are providing project management services for this project currently in RIBA Stage 3, the project aims to provide fresh new teaching and laboratories collaboration and office spaces for the Physics, Chemistry and FolSM faculties.

Total Value:

£177m+

27


CASE STUDY:

University College London. Fulkers have been working with University College London (UCL) for many years, providing a range of construction consultancy services both under individual appointment and through our membership of the University’s framework agreement. The University’s portfolio includes various listed buildings within the Bloomsbury conservation area. Main Quad Refurbishment, £15m

Goldsmid House, £725k

The Main Quad is a large green space surrounded by

Constructed in 2008 in the Victoria area of London,

Grade I listed buildings and acts as the main entrance

the front elevation of Goldsmid House was clad with

to the Bloomsbury Campus. The quad has been through

a bespoke copper rainscreen comprising several

several iterations of uses and at one point was being

products, as opposed to a purpose-built system from

used as a car park in the 1970s; improvements are long

one manufacturer. The design of the cladding involved a

overdue. Fulkers carried out the feasibility study for this

bespoke timber framed support system, with additional

project to refurbish the entire area to improve the setting

timber board linings. Fulkers supported the design of a

and reflect its’ status as the main entrance to the campus,

new bespoke cladding system, which could be applied

including improving the circulation routes, installing

externally with new copper cladding to match exactly

raised beds, renewing the hard landscaping finishes,

with the existing.

installing additional cycle parking, and the refurbishment of the adjacent façades and roofs. The works are to be

Academic Buildings Access Projects, £1m

phased over several years, with the project due to be

Installation of campus wide access control to buildings,

completed one year ahead of the Bicentenary.

including asbestos removal and works to listed buildings.

Biological Services Units, £20m

The Slade School of Arts Refurbishment, £3m

Fulkers are acting as lead designer and principal

Fulkers were involved in plans for an external refurbishment

designer for the deliver of new Biological Services Units

of The Slade School of Arts as well as overseeing the

(BSU) across 18 locations to Home Office Compliance

internal refurbishment works as part of a wider team. As

standards. Due to the complexity of the BSUs, the phased

part of the brief UCL advised that they wish to be carbon

programme of works requires flexibility and a high level of

neutral by 2035 and as a result, our building surveyors were

stakeholder engagement. Workshops are held frequently

tasked with plans for improving the thermal performance

for the UCL facilities teams and end users to ensure the

of the building, whilst at the same time obtaining Listed

BSU’s meet current regulatory construction standards.

Building Consent. The project is on hold at RIBA Stage 1.

Long Term Maintenance Programme, £750k

The Slade School of Arts Sprinkler System, £800k

An internal and external redecoration and repair programme

Fulkers acted as project managers and quantity surveyors

of the university’s buildings, including Grade I listed

for the design and installation of a sprinkler system to

buildings. Our team also surveyed the roofs of multiple

the Grade I listed building which involved connections to

Grade II listed buildings. Our building surveyors also

existing water supplies and storage facilities. Extensive

provided a costed PPM on the quad buildings which are

stakeholder liaison and engagement was required to

Grade I, Grade II and unlisted but of architectural interest.

enable the works to be undertaken in a phased manner to prevent disruption during exam and exhibition periods.

28

Capability Statement: Higher Education


Project Bulge, £Confidential

External Decorations Programme, £400k

UCL identified a need for additional teaching, office,

A scheme to refresh and redecorate several properties

specialist laboratory and study spaces as a result

across the university’s portfolio, including the Medawar

of an increase in student numbers. Fulkers were

Building, the Institute of Neurology, 16-26 Gordon Street

appointed to support the University in developing

Houses and the Fry and Wilson Buildings. Works also

the additional accommodation, which includes

included the reroofing and new EWI provision to the

working with a dedicated team within UCL to identify

university’s observatory. All works were carried out whilst

an appropriate development site either within or

premises were in occupation.

near the university’s Bloomsbury Campus.

Location:

London

Total Value:

£41.7m+

29


CASE STUDY:

University of the Arts London. Fulkers delivered a two phased substantial project for the University of the Arts London (UAL) delivering the refurbishment and fit-out of the UAL Camberwell Campus in London.

Fulkers provided project management and employers

On the ground floor a commercial kitchen and canteen

agent services for UAL for a substantially new and

has been provided along with a 3D Workshop. A learning

enlarged campus at its Peckham Road location in

resource centre, teaching rooms and a special collections

South East London. The campus includes a new hall

enclosure are located on the first floor, with the top floor

of residence, an academic extension, remodelled and

containing further studios and a student exhibition space.

accessible main entrance/reception and an integral courtyard for events.

The refurbishment section of the project includes layout reconfiguration of the lower ground floor for

The building provides an opportunity for the local

a new reception, exhibition galleries and ceramics

community and public at large to enjoy these new

workshops. A student centre and faith room has

facilities through creating a gallery for exhibiting art

also been created on the first floor.

from national museums and galleries. The project was delivered in two phases: -

Phase 1 The new academic building fit out

- Phase 2 The 1960’s and Victorian buildings

All kitchenettes and circulation spaces have been refurbished. Externally, steps and an accessibility slope have been introduced to provide access to the new entrance and reception.

remodelling and refurbishment. The project included a 250 seat lecture theatre and projection room at basement level with associated AV and IT.

Location:

London

30

Capability Statement: Higher Education

Total Value:

£15m


31


CASE STUDY:

London School of Economics and Political Science. The Fulkers team have worked on a number of projects as part of the London School of Economics and Political Science’s (LSE) frameworks, including the design, refurbishment and repair of a wide variety of buildings across their sites in central London. The Old Building, £15m

Parish Hall Refurbishment, £1.5m

The Old Building accommodates academic offices,

The Parish Hall building had been unused for a number

student and teaching facilities, the Old Theatre, catering

of years, the aim of this project was to convert the space

facilities, the library and student services. The main

into three open plan, interactive teaching rooms. This

objective was to accommodate three new departments,

required extensive mechanical and electrical upgrades

the installation of new lifts to improve accessibility,

and DDA works to ensure the building met current

refurbishment of areas including the restacking of the

regulations, which included the installation of a 3-stop lift.

building to improve efficiency and to de-carbonise the building in line with LSE’s net carbon zero target.

Cowdray House Refurbishment, £1.1m Cowdray House was built in 1903 and is Grade II listed.

Myddleton Halls of Residence Refurbishment, £8.5m

The project was a light touch refurbishment of the main

LSE have established a 10-year strategic plan to improve

circulation area, offices, and the upgrade of all WCs. The

their accommodation. This project consists of refurbishing

works also included adaptations to the heating system,

all the bedrooms, communal spaces and upgrading back

new LED lighting and decorations throughout. The works

of house areas. The university is also looking to reduce

had to be undertaken in phases so the day-to-day use of

its carbon footprint by removing all gas fired boiler plants

the building could continue during the renovation works.

and replacing them with electric heat pumps to reduce energy usage, as well as upgrading the fabric of the

1 Kingsway Office Fit-Out, £900k

building.

The refurbishment of 1 Kingsway required decanting of a number of departments and the opportunity was taken

Butler’s Wharf Halls of Residence Refurbishment, £24m

to rationalise the space allocation such that departments

The scope of works for the Butler’s Wharf Halls of

are consolidated rather than the previous arrangement

Residence are very similar to those for the Myddleton

of being housed across a number of buildings. The

Halls of Residence refurbishment. The student bedrooms

departments can now operate much more effectively.

are being refurbished and various options are being considered for MEP and fabric upgrades.

Rosebery Hall, £700k Fulkers were commissioned to provide building surveying

Public Realm Works, £500k

and CDM services for the external upgrading of Rosebery

This project entailed the phased conversion of existing

Hall, residential accommodation for LSE students

highways into pedestrianised zones across the university

located in central London. The scope of works included

campus, working closely with Westminster City Council

replacement of the original aluminium single glazed

and their guidelines to ensure the project was completed

windows to modern high performance metal casements;

on budget. The proposed works is to landscape

replacement of the roof coverings and the introduction of

approximately 0.14Ha to improve the quality of the public

solar heating to the building. We also provided cavity fill

realm within Westminster.

insulation and replaced the front entrance to the building.

32

Capability Statement: Higher Education


Saw Swee Hock Student Centre, £40m Under previous employment member of the Fulkers team

the whole of the Student Union under one roof. The site

were appointed to deliver a new landmark expansion

became a student hub at the heart of LSE’s campus and

project for LSE. The objective was to expand the current

added significant value to the student experience at LSE.

space allocation for all existing facilities and consolidate

The building is also used for public events and concerts.

Location:

London

Total Value:

£92.2m

33


CASE STUDY:

University of Surrey. Fulkers Bailey Russell have delivered a variety of projects for the University of Surrey for over 15 years ranging from cyclical maintenance/compliance projects, external works, general refurbishments, new builds and masterplanning support. Some examples of projects are detailed below. Post-Graduate Medical School (Kate Granger Building), £7.2m This project comprised the extensive refurbishment of office and academic buildings located, for occupation by the Faculty of Health and Medical Sciences, originally located on the university’s main campus at Stag Hill. The extensive refurbishment of the 1987 built building included: exterior repairs, complete strip out of FF&E and MEP, lift replacements, alterations to the building’s cores to install additional WCs, fit-out of the multi-use office space, external infrastructure (including new connections to the university’s IT fibre network, security and CCTV installations) and refurbishment of external spaces and work in connection with external landscaping, all delivered in a live campus environment.

Surrey Research Park – Phase 1 The first of multiple phases, the works to the university’s research facility comprised window and door replacements, alongside minor elevation and roofing fabric maintenance repair items to take advantage of the access scaffold. Members of the Fulkers team also delivered: Surrey Sports Park, £27m Sports centre procured under a two-stage design and construct contract. The project comprised extensive indoor facilities including a 50m swimming pool, fitness centre, climbing wall, multiuse games areas, studios and a café/bar. Outdoor facilities included two all-weather sports pitches, tennis courts and associated landscaping.

34

Capability Statement: Higher Education


Faraday Court Phase 11A Veterinary Clinic for Fitzpatrick Referrals Limited, £4m Design and construction of a new building designed to accommodate a new veterinary clinic, specialising in the treatment of small animals. Procured through a single-stage design and build contract. School of Veterinary Medicine, £45m New build and fit-out of 6,600sqm of academic and teaching space across three new buildings, with associated utilities and roads infrastructure. The building has a central atrium with café and reception area leading to student and administrative staff facilities.

20 Priestley Road Offices, £600k Refurbishment of an office building for use as a NHS Bowel Cancer Screening Centre. The project comprised the upgrading of the services core, installation of lift and the fitting-out of reception area, laboratories, offices, conference facilities, staff facilities and call centre.

Other Capital Projects have included:

60 Priestley Road Offices, £900k The project comprised the upgrading of the services core, creation of new entrance areas, and the refurbishment of reception areas and open-plan offices. Externally, work included the installation of a new glazed entrance canopy, carpark upgrading, new chiller enclosure and landscaping works.

- Lakeside Kitchen - £600k

New Technical Facility, £7.6m Construction of a new technical facility for the research, development and assembly of satellites. The project consisted of extensive clean rooms, laboratories, meeting rooms, comms room, satellite mission control room and storage spaces.

- Campus Wide Toilets - £300k

Location:

Guildford

- Surrey Sports Park – External Sports Pitches Phase 3 - £1m - Faculty of Health & Medical Sciences (30 Priestley Road) - £7.5m - FASS/FEPS - £1.2m

- Senate House ground floor and Old EFM office £300k Other Long Term Maintenance Projects have included: - AB Building Perimeter Heating - £850k

- Medium Temperature Hot Water (MTHW) £300k - High Voltage - £360k - CHP Engine - £1m

Total Value:

£100m+

35


CASE STUDY:

Bath Spa University. Bath Spa University purchased the Nicholas Grimshaw designed, former Herman Miller factory on Locksbrook Road in 2016, restoring the space to create a RIBA award winning, state of the art, School of Arts & Design. The grade II-listed factory in Bath is designed to reflect

while maintaining the university’s need to allow for

the manufacturer’s philosophy of open, inclusive and

flexibility in use as well as future proofing systems.

democratic working spaces that can be adapted to suit

One of the major key design features of the project

their purpose. The building is in a central location and

included the raising of the existing roof height to

close to student accommodation. As a former factory used

allow for the creation of a mezzanine floor and provide

by Herman Miller, it is part of Bath’s industrial history.

crucial additional space. Given the nature of the existing deep plan building, new north lights

The building structure uses a simple primary

and clearstory glazing was incorporated into the

and secondary beam system with columns on

new roof design to provide natural light into the

a 10 x 20m grid to create a 6,000sqm space

high quality internal environment that the university

with only two rows of nine columns.

was seeking. A new rooftop pavilion was also included to provide a high value, multi-use space.

To achieve the university’s aspirations for the building while continuing to function as a “place of making”, careful

Another notable feature of the design is the completely

consideration was given to developing the mechanical

demountable cladding system of fibreglass, louvres

and electrical design so that the space was still able

and glazing, which allows staff to rearrange the

to promote collaboration, flexibility and community.

position of window and façade building panels to accommodate necessary changes in use.

Low life-cycle cost components were developed alongside the use of passive elements of the building

The new Locksbrook Road campus accommodates

to limit internal temperatures and minimise energy

university facilities that were previously spread

use. The majority of MEP services were exposed, so

over several sites in and around Bath into a singular

careful coordination was required with the building and

location achieving the university’s vision of an

structural elements to meet aesthetic requirements

academic incubator for the creative industries.

Location:

Bath

36

Capability Statement: Higher Education

Total Value:

£32m


Bath Spa University Winner of RIBA South West Award 2021 and RIBA National Award 2021 37


CASE STUDY:

University of Bath. The Fulkers team have provided, and continue to provide, quantity surveying services to the University of Bath on a variety of projects across their portfolio.

School of Management, £65m

Institute for Advanced Automotive Propulsion

Fulkers delivered the new 150,000sqft School of

Systems, £70m

Management building for the University of Bath at its

The cutting-edge, £70 million Institute for Advanced

Claverton Down campus on the outskirts of the historic city

Automotive Propulsion Systems (IAAPS) centre has

of Bath. The landmark seven-storey building accommodates

been designed to carry out a wide variety of complex

students and staff in state-of-the-art facilities; supporting

projects for which specialist knowledge and facilities are

the university to attract increased numbers of post-

required. The new purpose-built facility has the capability

graduate students. A range of lecture theatres are housed

to run both virtual hardware-in-the-loop testing of real

on the first floor including a Harvard style theatre and

components and physical steady state, transient and

ICT lecture room. Levels 2-4 house 142 offices, which are

highly dynamic propulsion testbeds, complete powertrain

located on the periphery of the building to benefit from

cells and chassis dynamometers under a wide range

natural light and ventilation. The main reception can be

of operating conditions using real driving scenarios,

accessed via the public realm area and the foyer leads

customer usage and unique test methodologies.

through to the expansive glazed atrium to the south. The new centre is an international collaborative hub in The project was delivered in a live campus environment

the field of propulsion research, working in pursuit of

during the Covid-19 pandemic which posed significant risks

cleaner, sustainable and affordable powertrains. The

in terms of potential site closures, cost implications and time

centre provides a platform to forge networks across

delays, meaning the team had to be agile in its approach to

industry, academia and businesses of all sizes to facilitate

mitigating these risks. The build was delivered in the spirit of

the knowledge transfer required to accelerate the pace of

BREEAM sustainability targets and using BIM Level 3.

innovation in the mobility sector.

Location:

Bath

38

Capability Statement: Higher Education

Total Value:

£143m


Milner Centre for Evolution, £8m The Milner Centre for Evolution is a cross-faculty research

Fulkers’ cost reports focussed on the key issues by

centre bridging biology, health and education. This

capturing all relevant information such as approved

new two storey evolution research facility incorporates

change, anticipated change and potential change,

laboratories, offices and seminar spaces including

together with forecast out-turn cost, contingency

associated external works and landscaping. The

status, commitment, expenditure, remaining risk profile,

Milner Centre building was designed to create a highly

cash flow and cost certainty/final account progress.

collaborative, research and social space.

Throughout the contract we produced “live” reports that were issued regularly with formal reports issued in a

Conscious that the needs of the building may change

format agreed with the project manager.

over the years, the building committee made the space as general-purpose as possible to allow the centre to adapt as the needs of the group change. For example, offices for academics and grad students are the same size, so if the ratio of students to faculty changes, they can easily be re-purposed without knocking walls down.

39


CASE STUDY:

University of Westminster. The University of Westminster is undergoing a large transformation; a programme of extensive improvements to their buildings to create a world-class teaching and learning environment for students and staff. Fulkers has been working for the university since 2014 and regularly provide multi-disciplinary services for works including refurbishments of offices, teaching spaces and student accommodation as well as repairs and maintenance. Harrow Halls of Residence, £19m

London Campus Refurbishment, £5m

Refurbishment of student resident blocks comprising 470 bedrooms on the Harrow Campus. This is a five-year project of 91,500sqft phased for summer works. The scope includes the renovation of bedrooms, WCs, hallways and kitchens.

Fulkers were appointed to deliver multi-disciplinary services for the Cat A and Cat B office fit-out reallocating 400 staff members of the University of Westminster into four different buildings located in central London. The office fit-out entailed new office spaces, conference rooms, kitchens, restrooms and lounge areas in all four buildings, as well as the refurbishment of the façade of one of these buildings. New building systems were installed as part of this refurbishment as well as new interior finishes, furniture and light fixtures. The project entailed planning approval as well as heritage approval and had an extremely tight deadline.

Regent Street Roof and Façade Repairs, £5m

The purpose of this project was to undertake a programme of improvement works to the roof, façade and entrance area at the Regent Street Campus. A 1910 Grade II listed building, it is the flagship building for the university. The works include the replacement of all roof coverings including providing adequate insulation to 39 roofs, cleaning the façade, upgrade to the façade windows and new up-lighters to the façade.

Location:

London

40

Capability Statement: Higher Education

Total Value:

£37.2m


Broadcasting Space, £320k The conversion of a 130sqm office on the Harrow Campus into a broadcasting studio for students and staff. The works included a high specification of acoustic treatment and close coordination with the AV specialist. Regent Street, Boardroom, £1.5m Refurbishment of the university’s historic boardroom in their Regent St building. This project entailed the replacement of the boardroom’s roof, as well as new building systems, new finishes, new lighting and new furniture. This project being a listed building has been carefully designed to meet heritage preservation requirements.

Soho Polytheatre, £1.3m Refurbishment of the historic Soho Polytheatre located in one of the university buildings in Fitzrovia. This was a National Heritage Lottery Fund project that entailed façade work, a new lift as well as new WCs, building systems, lighting, finishes and furniture. The new theatre offers a multi-use space for exhibits, events, studying and art making. 101 Decant, £4.7m Full multi-disciplinary services for the refurbishment works at four of the University of Westminster’s existing buildings in Central London. The project was commissioned by the university so that staff located at a rented office location could decant to existing university owned buildings. The scope of works included: the full strip-out to all areas; the creation of meeting rooms, breakout spaces, WC’s, reception areas, open plan office spaces, showers and a changing area. The project also included the installation of new kitchen areas; and M&E works such as cold and hot water installations, new variable refrigerant flow systems, heat recovery units, a new air handling unit, electrical power, new distribution boards, luminaires and fire alarm alterations.

120 New Cavendish Street, £400k The university purchased 120 New Cavendish Street to consolidate their extensive New Cavendish Campus where they have been since the 1970’s complementing their sites in Regent Street, Marylebone Road and Harrow. The building required a Cat 2 office fit out including removal of partitions, M&E enhancements and replacement finishes to create an open plan office and associated WCs.

41


CASE STUDY:

University of Kent. The University of Kent’s School of Economics building was designed with the aim of creating a vibrant new campus destination with world class accommodation, giving departments the opportunity to grow whilst improving the student, staff and visitor experience and contributing to the regeneration of the university’s estate.

Situated between the existing Kent Research and Development Centre Building and Jennison Building on the axial access route to the central hub, the BREEAM ‘Excellent’ rated School of Economics reinforces and improves the circulation routes and vistas to enhance the concept of a coherent campus destination. The new School of Economics also improves the character and quality of the strategic hub developed for the Kent Business School and School of Mathematics, Statistics and Actuarial building. The design is adaptable for future use, and creates a backdrop for the existing woodland setting. The building is naturally ventilated and creates animated façades all around, whilst complementing the existing buildings adjacent to the site. The 28,500sqft building comprises academic offices, administration, ancillary areas, teaching and learning spaces and ancillary spaces.

Location:

Canterbury

42

Capability Statement: Higher Education

Total Value:

£120m


43


CASE STUDY:

Buckinghamshire New University. Buckinghamshire New University (BNU) have invested in a range of state-of-the-art facilities across their campuses to support student’s learning, the latest addition is the East Wing Building.

The East Wing Building project provides 7 new areas;

with various additional work packages included such as

identified as key to student interaction and BNU desire

refurbishing the various roofs of the adjacent buildings.

to keep students on site – an atrium (for events and graduations), refectory, winter garden, reception, roof

A particular problem during the enabling phase was that the

garden, kitchen & mezzanine seating, the creation of a

primary area of the project was in the middle of an existing

new portal into the building at the new reception, as well

building surrounded by teaching spaces and workshops.

as teaching and general use spaces. Existing workshops

Fulkers worked with the academic and timetabling teams

and teaching spaces were relocated elsewhere on campus

to free up some areas so that construction access could be

to make way for some of the areas above and the under-

granted through the area that most suited construction but

utilised “Rose Garden” was closed and became the

caused the least disruption to teaching.

new Atrium. The Rose Garden had no sunlight and was overlooked by all 4 buildings that surrounded it.

Multiple smaller projects became evident along the way, many of which were managed by the existing team. This

From the outset, BNU had student experience as its focus

led to a cohesive and stream-lined approach to these

and so the original 3-year construction programme was

projects and their integration into the primary project. The

condensed into 18 months. Construction took place in a live

team worked with stakeholders and departments to create

environment with the involvement of multiple stakeholders.

and manage a number of workflow processes. This led to integrated working practices; some of which have been

Design was underway via a PCSA contract when Fulkers

adopted by BNU on other projects.

joined the team. We managed all the stakeholder engagement, design process, contract, programme, decant

Construction was carried out under an amended JCT

and construction of the relocated teaching spaces, as well

Design & Build 2016 contract, with 3 parties; the contractor,

as the primary projects which totalled in value at c£22m

the framework provider and BNU.

Location:

High Wycombe Total Value:

£22m 44

Capability Statement: Higher Education

The Buckinghamshire New University - High Wycombe Campus project was shortlisted in the ‘Inspiring Learning Spaces’ at the Education Estate Awards 2024.


45


CASE STUDY:

University of Reading In recent years Fulkers have been assisting Reading’s Estates Department in creating an affordable, flexible, appropriately scaled and fit for purpose estate.

Harborne Building, £Confidential Fulkers project managers assisted the Estates and Property Services Department in overseeing the letting of this building to the Royal Berkshire Hospital NHS Trust (RBH). The duties included full liaisons with the RBH team in connection with their proposals for the building, the splitting of mechanical and electrical plant and equipment and overseeing the RBH tenants fit out works to confirm it was in accordance with the university’s requirements and legal agreements. The building was converted into clinical laboratory space.

Clinical Suites, £1.5m Fulkers provided project management and contract administration for the fit out of an area within an occupied building for use by the university and the local hospital trust as a joint learning space. The project involved extensive stakeholder management throughout all RIBA Stages. Asbestos removal and radiation testing were undertaken ahead of works starting on site. At the beginning of the construction works, the contractor was required to work around exam periods. Strict working hours were implemented and liaison with building users and the client team took place to ensure the exams were not disrupted whilst maintaining the construction programme.

46

Capability Statement: Higher Education

Internal Refurbishment of Polly Vacher Building, £450k Our building surveyors delivered the refurbishment of various internal areas/rooms within the Polly Vacher Building, which had been identified as a new location for the Cole and Herbarium Collections and storage for the Zoological department. The new areas were to allow for the “dry” specimens (skeletons, fossils, insects etc.) and “wet” specimens (items stored in liquids, spirit solutions etc.) to be suitably stored and accessed.


Arts Faculty, £4.5m Fulkers provided project management and contract administration services for the relocation of the Reading School of Art which forms part of the university. The project was to refurbish an existing redundant central kitchen building and add a 2-storey extension to facilitate the full scope of the arts programme including a purpose-built gallery space to allow artwork to be displayed, as well as workshops for activities such as ceramics, screen printing, and wood and metal work. There will also be new studios and a visitor space. The building will meet BREEAM Very Good standard and has been connected to an existing energy centre. The project completed for the commencement of the 2023/24 academic year.

Knight Building, c£5m Fulkers project managers assisted the Estates and Property Services Department in overseeing the letting of this building and car park to Reading Scientific Services Ltd (RSSL). RSSL undertake food testing for the Mondelez group of companies including Cadbury, Ritz, Tuc, Daim & Oreo. The duties included full liaisons with the RSSL team in connection with their proposals for the building, the splitting of mechanical and electrical plant and equipment and overseeing the RSSL tenants fit out works to confirm it was in accordance with the university’s requirements and legal agreements. Our project manager’s also oversaw contribution spending by the university to the scheme.

Thames Valley Science Park/Shinfield Studios, £5m Fulkers project managers provided support to the university’s Property Services team and managed the interface of works between the Thames Valley Science Park (TVSP) and Shinfield Studios. The studios is a new film, TV and recording hub facility with 18 stages. There were significant works between the two sites including an extensive retaining wall and reduced level dig. We liaised with the project managers and construction management team for the studios to manage the interfaces and temporary facilities. The critical request from the university was to ensure that the existing TVSP tenants were not disrupted any way as they undertook their daily business routines.

Location:

Reading

Total Value:

£16.45m+

47


CASE STUDY:

University of West England. The University of the West of England (UWE) is a public research university, located in and around Bristol, England, UK. With more than 36,000 students and 4,200 staff, it is the largest provider of higher education in the South West of England.

School of Health and Social Wellbeing

Buildings A-N Refurbishment

Fulkers provided cost management services for the

The aim of this project is to redevelop and reconfigure the

relocation and refurbishment of the School of Health

existing building blocks A-N to create a new ‘home’ space

and Social Wellbeing (SHSW) at UWE, from the Glenside

at the centre.

Campus to the Frenchay Campus, transforming the way new health and social care professionals are trained.

Wayfinding and connectivity across campus from each arrival point forms an essential part of the design and key

UWE’s vision for the future, is for students and staff to

deliverables include: over cladding of all blocks (excluding

have access to larger, more flexible spaces to learn, teach

F Block), re-roofing, new main entrance, creation of the

and advance their studies.

‘home’ space, entertainment spaces, catering and retail spaces, bus depot, seven satellite school offices and

Limitations with the mainly Grade II listed buildings

external landscaping, as well as general redevelopment

at Glenside inhibit the ability for the SHSW to grow

and refurbishment of academic and teaching facilities.

effectively. As part of the wider campus life project, moving to the Frenchay Campus will also improve the

This large redevelopment project is being broken down

connections between the school and the rest of the

into smaller projects and phases which can be delivered in

university.

consideration of the live and active campus environment.

Community and business engagement will be the heart of the new site, as it provides a new Integrated Care Academy (ICA), the first of its kind in the South West. The ICA, a joint venture between the NHS, commercial, charity and independent sector partners, will prioritise an updated health and social care system.

Location:

Bristol 48

Capability Statement: Higher Education

Total Value:

Confidential


49


Big enough to cut it small enough to care.

www.fulkers.co.uk London | Basingstoke | Brighton | Bristol | Cardiff | Kings Hill | Manchester 50

Capability Statement: Higher Education


Turn static files into dynamic content formats.

Create a flipbook