Building Safety Team
Introduction.

The Building Safety Team provide our clients with specialist multi-disciplinary services for remediation projects. All members of the team are trained in the Building Safety Act and most of our senior team have been working on remediation projects since before the BSA was passed into law. The services offered include Building Regs Principal Designers, Project Managers, Cost Managers, CDM Principal Designers, Design Coordinators, Clerks of Work, and Resident Liaison Officers.
We work across all sectors, with experience in residential, PBSA and BtR developments, hospitals and commercial premises. Our approach is to provide an autonomous and therefore responsive team, that has relevant experience, and who are supported to provide an excellent standard of service. Clients can choose from the suite of services to select the project team they require or complement an existing team. We pride ourselves on integrating seamlessly into existing organisations and fostering a collaborative working environment.
Our team will bring the following benefits to you:
- Our team has proven experience of working on cladding replacement and structural remediation projects and are experts in building safety.
- We are receptive and proactive; continually reviewing and improving the performance.
- We think outside the traditional consultancy remit and recognise our clients’ objectives.
- We engage positively with stakeholders including funders, contractors and residents.
- We follow the Fulkers methodology: Plan, Prepare, Execute.
The client contact will be Leo Haywood. Leo’s contact details are as follows:
LEO HAYWOOD Managing Director
leo.haywood@fulkers.co.uk 07858 371 679
Table of Contents.
Section 1 Services, Strategy & Consultant Team 06-11
Section 2 Experience 14-19
Section 3 About Us 22-25

Section 1.
Services, Strategy and Consultant Team.
FBR’s Building Safety Team can provide a turnkey solution for remediation projects including:
- Arranging a survey: FRA, FRAEW, condition or fire doors survey
- Defining a scope of works for tendering.
- Arranging statutory approvals for the proposed design.
- Gateway 1, 2 & 3 applications to BSR.
- Procurement and pre-construction management.
- Project management/quantity surveying services throughout the works.
- Resident liaison.
- Regular site inspection by our building surveyors.
- Quality assurance throughout the build by our clerk of works.
- Provision of Quality Management software for client and contractors.
This service is tailored, on a project-by-project basis depending on the procurement strategy being deployed by the client and their needs.
Delivering the service.
Building Regulations
Principal Designer
We have a BR-PD capability overseen by experienced design professionals. We have the capability to undertake work ranging from small remedial projects to large new build developments. We can provide this service directly to the client, or as a subcontracted service to a designer or contractor.
Building Safety
The Fulkers Bailey Russell team have extensive the Client and Designer roles. We can advise their responsibilities, preparation of Client
Safety Act Advisor
Russell Compliance extensive knowledge of Designer duty holder advise duty holders of responsibilities, and assist in the BSR documentation.
Building Remediation Management
Our Multi-disciplinary team of Surveyors, Project managers, Cost Managers, Architects and Technical Managers are one of the UKs leading building remediation teams. We specialise in Higher Risk Buildings (HRBs) and we are currently working on £180 million of remediation works.
Organisation Structure.
ESCALATION
- Support Leo Haywood (Accountable person) in running this key account
- Key point of escalation for any key issues which can’t be resolved with Leo Haywood
- Attend the Monthly Client Review meetings with the senior leadership team
- Maintain and develop a strategic relationship with the senior leadership team
ACCOUNTABLE
- Build and maintain a strong, long-lasting partnering relationship with the senior leadership team and key delivery stakeholders
- Serve as the lead point of contact and be the day to day escalation point
- Ensure the timely and successful delivery of the Fulkers service
- Ensure the delivery team provide regular reporting across the portfolio, this being issuing reports, attending key stakeholder meetings, managing fees, resource and KPI’s
- Support on any strategic aspects of the projects being implemented
- Set up any training and identification of CPD required for the Fulkers and clients team
RESPONSIBLE
- Day to day point of contact for resolving any issues or opportunities arising
- Running the delivery teams day to day and ensuring projects are being managed proactively
- Set up each project, obtain briefs and ensure clear lines of communication are in place
- Hold regular Fulkers internal meetings with the delivery teams to ensure projects are being delivered to the required standard, ensure knowledge sharing and to highlight any key decisions pending or information required
- Facilitate continuous improvement and the transferral of best practice amongst ours and the wider team




ROB FARRANT Commercial Lead




DELIVERY TEAM
LEO HAYWOOD Managing Director
VASILI ELEFTHERIOU Director
JAMES MARKHAM Associate Director
RICHARD RUSSELL CEO
ABBAS MAHMOOD Senior Quantity Surveyor
ANDREW FIELD Director
CHRIS COLEMAN Associate Director

Experience. 2 2 Section 2.
Building Safety Projects.
Fulkers has been appointed on various remediation projects for developers. These include internal firestopping and façade remediation projects. We provide a turnkey solution for remediation projects including:
- Arranging FRA & FRAEW and defining a scope of works for tendering;
- Arranging statutory approvals for the proposed design;
- Procurement and pre-construction management;
- Resident liaison and, if required, relocation management;
- Condition surveys and fire doors surveys;
- Project management/quantity surveying services throughout the works;
- Regular site inspection by our building surveyors;
- Quality assurance throughout the build by our clerk of works.
This service is tailored, on a project-by-project basis depending on the procurement strategy being deployed by the client and includes taking the role of construction manager for CM projects.



Project A
2 residential blocks, 10 and 15 stories high, with Network Rail interface. Remediation of rendered EPS cladding to be replaced with non-combustible EWI system. Construction programme of 15 months and contract value £10mil.
Project B
Project B development is located in Woolwich, London and consists of 8 buildings. The project will need a full EWS replacement. The total works are estimated at £14 million and will take 2.5 years to complete.
Project C
Remediation of rendered EPS system with noncombustible EWI façade, installation of fire barriers and remediation of PIR adhered spandrel glass panels. Consisting of 4 blocks ranging from 5-14 stories in height. Programme 17 months and contract value £12mil.
Project D
Fulkers has been appointed on various HRB structural remediation projects from permanent steels, carbon fibre, through bolting, MEP and Fire. The team is experienced working with occupied buildings. They work across the UK, in line with the latest guidance and standards.


Fire Safety Improvements and Cladding Replacements.
Following the Grenfell disaster, iQ Student Accommodation required a project manager to deliver investigative works and cladding replacement works to their large buildings, all within a tight deadline. This meant extremely tight milestones and driving multiple teams across multiple projects across the UK to ensure that the projects are delivered on time whilst meeting the new legislative criteria for external cladding systems. Key projects have included:
Fire Door and Fire Compartment Upgrading and Repairs
Full fire door and compartmentation surveys of various buildings nationwide and production of full schedule of works.
Marlborough House, Bristol
High pressure laminate cladding replacement. Fulkers witnessed surveys with the designers and concluded that the cladding consisted of fire rated high-pressure laminate and was installed above 18m which did not comply with building regulations at the time of construction.
High pressure laminate cladding replacement.
iQ Costume is a very large building ranging from 13 to 18 stories. The cladding comprises of none fire rated HPL and cavity walls that contain phenolic insulation and missing fire cavity barriers which creates a serious fire risk to the building’s tenants
Will Wyatt
High Pressure laminate cladding replacement. This project is a large building with a central courtyard. The buildings cladding consisted of none fire rated HPL cladding and was over 18m.
Tufnell
High pressure laminate cladding replacement This project is over 18m in height and has multiple heights and blocks. The buildings cladding consists of HPL cladding, spandrel panels containing phenolic insulation and terra cotta tiles with phenolic insulation behind.
Fiveways
ACM cladding replacement. A six-story building taller than 18m, but not falling into the under 18m category due to the last floor slab of the building being under. However, this guidance is continuously changing and surveys flagged that the cladding was defectively installed and contained a rotten timber support system.
Costume


Greystar is a large multi nation rental residential property company and in the UK they have the brand ‘Chapter’ which provides Student accommodation to the private market. The Chapter brand provides an exclusive student living experience with unparalleled amenities.
Fire Safety Project
A specialist project team has been created to ensure Greystar’s portfolio of student accommodation is statutory compliant and adheres to changing fire regulations. Fulkers has provided a Project/ Programme Lead, Project Managers, including the role of Contract Administrator, and a Clerk of Works to develop and deliver the following works across seven Chapters within Greystar’s portfolio: fire compartmentalization; fire stopping; apartment door replacement; installation of sprinklers; and re-cladding.
Additionally, the Project Lead assists Greystar in making claims against the original build contractors for instances of non-compliant design/delivery and poor workmanship.





Our Services.
Multi-Disciplinary
Through partnership with our approved suppliers, we are able to provide a holistic multi-disciplinary service which includes, but is not limited to:
Acoustic Engineering, Architectural Design, BIM, Civil and Structural Engineering, Digital Surveying, Energy Design, Fire Management, Laser Scanning and Point Cloud, Lift Engineering, Mechanical and Electrical Engineering, Workplace Consultancy
Project Management
Change Management, Clerk of Works, Construction Project Management, Contract Administration, Design Management, Employer’s Agent, Energy Projects, Facilities Planning, Masterplanning, MEP Projects, Migration Management, Procurement, Programming and Scheduling, Project Governance and Control, Supply Chain Management
We are responsible for delivering a range of construction projects, all our services are geared to reduce risk, give greater certainty and to provide the best value for clients. This is why we develop our business around people.
Our people take time to understand your business and share their knowledge with the aim of generating fresh ideas. By blending our people, systems and construction market knowledge with our company, we customise our services to meet your requirements.
Cost Management
Bank Monitoring, Budget Advice, Budget Benchmarking, Building Cost Reinstatement Valuation, Cash Flow Analysis, Commercial Governance, Construction Cost Control, Contract Documentation, Design Cost Control, Development Appraisal, Due Diligence and Feasibility, Masterplanning, MEP Cost Control, Procurement Strategy, Project Monitoring, Tender Documentation, Value Management, Whole Life Cost Modelling
Building Surveying
Access Consultancy, Acquisition Surveys, Clerk of Works, Condition Surveys, Contract Administration, Defect Analysis, Design, Extension and Refurbishment, Dilapidations, Due Diligence Surveys, Employer’s Agent, Energy Efficiency, Feasibility Studies, Fire Door and Compartment Surveys, Fire Risk Assessments, Historic Building Conservation, Lead Consultant, Licence to Alter Party Walls, Planned Maintenance Surveys, Risk Management, Sustainable Construction, Whole Life Cycle Costings


Designer / H&S Architecture
CDM Advisor,
Safety Advice, Safety Auditing, Safety Monitoring
Principal
Contractor Advisor, Designer BIM, Building Design, Contract Administration, Design, Extension and Refurbishment, Energy Efficiency, Feasibility Studies, Interior Design, Lead Consultant Services, New Build, Sustainable Construction
Project, Programme and Portfolio Management Decarbonisation
Baseline Management, Commercial Management, Data Analyst, Governance, Process Improvement and Management, Resource Management, Risk Management, Schedule Management, Strategic and Data Driven Reporting
Asset and Utilisation Reviews, Carbon Cost Tool, Carbon vs Cost, Fabric Condition, Funding Opportunities, Programme Strategy, Whole Life Cycle

Building Safety
Building Regs
Principal Designer, Condition Reports, Design Management, Fire Door Inspections and Maintenance Programming, Fire Door Upgrades and Replacements, Golden Thread, Preparing Building Safety Case, Quality Control Management, Reviewing FRAEW’s, Structural/ Cladding/Fire Remediation
About Us.
Since the company was founded we have grown into a multidisciplinary consultancy with over 170 employees. Fully owned by three equity partners, we are not restricted by corporate red tape, we are able to take an agile and flexible approach to react to our clients needs quickly.


Strong, visible leadership from our senior teams ensures a personable approach and outstanding service delivery. We are big enough to cut it and small enough to care.
ESG.
Fulkers are a Certified B Corporation, verified by B Lab to meet high standards of social and environmental performance, transparency, and accountability. Becoming a B Corp was a huge achievement for our company and is validation of our long-standing commitment to sustainability and social responsibility.

We have also been awarded the Prestigious Silver Rating from EcoVadis, an internationally recognised sustainability platform that evaluates companies across a range of criteria, including environment, human rights, ethics, and sustainable procurement practises. The Silver Medal places Fulkers in the top 25% of all assessed companies and recognises our commitment to sustainable business practices.
“While B Corp focuses on our holistic corporate responsibility, EcoVadis offers a detailed analysis of our operating practices and supply chain, aiding targeted improvements. Together, they enhance our credibility and demonstrate a commitment to ethical and sustainable practices, fostering trust with our clients, stakeholders and partners. Having both accreditations reinforces our dedication to comprehensive sustainability practices across both internal operations and external collaborations. We are one of very few companies to hold both accreditations.”
Sam Bailey, Partner
Our Commitment.

To create awareness.
Share knowledge and resource.
Use of more sustainable materials and practices.
Development of our focus on sustainable procurement process/ policy.
Develop our corporate social responsibility procurement process / policy.
Invest in people and suppliers.
Ensure sustainability is at the forefront of all client conversations.
To lead by example. Staff training.
Develop our KPI’s to reflect the above.