Flinders Port Holdings - Masterplan 2022

Page 11

At Port Lincoln, interaction between recreational use and port-related use presents additional complication, however the

infrastructure remains in a strong position to support further growth. This is displayed in the figure below.

Figure 3 – Showing Existing Landside Conflicts at Port Lincoln

Port Lincoln is also surrounded by development on all sides, and limited space for expansion means that the Masterplan has had to identify and consider mechanisms to mitigate this risk.

5.4 Limited Waterfront It has been calculated that, without changes such as those outlined in the Masterplan, berth capacity at Port Adelaide for the customers will potentially run out by 2070 if not before, leaving the port with a finite life.

Complex undertakings are required to ensure that the port remains operationally viable into the long-term future for the State.

Flinders Port Holdings Masterplan 11 Capability Framework


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.