Page 60 • August 29, 2021 • www.constructionequipmentguide.com • CONSTRUCTION EQUIPMENT GUIDE
‘TopDownWay’ Offers Safe, Innovative Urban Skyscraper Demolition Method Despe, best known in New York City for its hydraulic self- system. Which means 100 percent protection against rubble, climbing Kokoon that currently is providing structure around debris, dust, noise and vibrations. In fact, the system adheres the steel frame of the in-progress Two Manhattan West and perfectly to the structure to be demolished and ensures 100 before that 50 Hudson Yards, recently completed the floor- percent containment. by-floor demolition of the world headquarters of Danish • Improves visibility — The demolition of a skyscraper multinational brewer Carlsberg Group, which moved to a does not go unnoticed, but with this system the contractor new location a few hundred meters away. avoids total coverage of the structure because only the three A new skyscraper with housing will rise instead where the upper floors are enclosed within the system itself. This space, now demolished Carlsberg silo once stood. which is highly visible but not cumbersome, can be used for Contractor P. Olesen selected Despe for the job due to the advertising, both day and night due to the use of LED illuunique nature of the 288 ft. tall building’s position, with a minating systems. school, stores and houses adjacent to the building and city For more information on Despe, visit regulations which required minimal disturbances including http://www.despe.com/and http://selfclimbingkokoon.com/. dust and noise from the demolition. Yet, while rules between European and American cities differ, metropolitan cities globally all have the same needs: that of growing vertically by replacing energy-consuming, structurally obsolete buildings by erecting higher, eco-friendlier, anti-seismic and extraordinary skyscrapers. Because in Europe explosives are banned in most densely populated urban areas, Despe decided to create an innovative, safe, eco-friendly and swift solution for the controlled demolition of urban skyscrapers: TopDownWay, a modular self-descending machine that can be adapted to suit the requirements of all types of structures to be demolished. It is an intelligent containment system as it retains all the material generated by the demolition works within the structure (glass, rubble, debris, noise, vibrations, dust and sprayed water). TopDownWay allows operators to work simultaneously on the three floors it occupies, in which it is possible to carry out different operations at the same time, such as the dismantling of the façades, the demolition of the floor and the removal of debris. As the work progresses, the platform descends in a controlled manner until it reaches zero level, and the building has been completely demolished. Assembly and disassembly of the structure takes place in situations of total safety for the environment and very swiftly: the different parts of the TopDownWay are assembled on the ground, hoisted with a crane and then assembled directly on the top of the skyscraper. After completing the demolition work, the structure is dismantled and disassembled. There are many advantages when using the TopDownWay system: • Improves safety for those who live in the city, safety for the surrounding buildings and monuments, safety for the roads, safety for the employees working at great heights and safety for the environment.• • Improves speed — using the example of a building of 25 floors, Despe’s system can be assembled in 20 days and in three months has completed the demolition. Using traditional demolition proce- TopDownWay, a modular self-descending machine that can be dures with scaffolding, the assembly time increases adapted to suit the requirements of all types of structures to to 3 months and the demolition time to 6. Gaining be demolished, is an intelligent containment system as it time in the property market means generating sav- retains all the material generated by the demolition works ings in project finance and resources. within the structure (glass, rubble, debris, noise, vibrations, • TopDownWay is a zero environmental impact dust and sprayed water).
CISCO EQUIPMENT www.cisco-equipment.com 1706 South 1st Street, Artesia, NM 88210 575-748-1314 Odessa, TX • 432-550-9181 Lubbock, TX • 806-745-9595 San Angelo, TX • 325-653-2121
FOUR SEASONS EQUIPMENT, INC. www.fourseasons-equip.com 8111 Mills Rd., Houston, TX 77064 • 800-234-5007 Dallas TX • 866-270-1700
NUECES POWER EQUIPMENT www.nuecespower.com 7510 IH-37 Access Rd., Corpus Christi, TX 78409 361-289-0066 Laredo, TX • 956-725-0066 San Antonio, TX • 210-310-0066 San Benito, TX • 956-361-0066 Victoria, TX • 361-576-0066 El Paso, TX • 915-541-0066
PORTER GROUP USA www.portergroupusa.com 13013 Temescal Canyon Rd, Corona, CA 92883 951-674-9999 Pacoima, CA • 818-834-0102 Newark, CA • 510-713-7368
MECOM EQUIPMENT www.mecomequipment.com 4546 N Wilson Way, Stockton, CA 95205 209-466-5135
JET CITY EQUIPMENT www.jetcityequipment.com 33345 SR 20, Oak Harbor, WA • 360-675-4441 Marysville, WA • 360-651-9079 Wenatchee, WA • 509-888-8181
R & S INDUSTRIES, INC. www.rsindinc.com 951 CR G, Clovis, NM 88101 575-769-8659