Submarine Cable Almanac Issue 27

Page 185

LION

Landing Points • Terre Rouge (Mauritius) • Toamasina (Madagascar)

LOWER INDIAN OCEAN NETWORK • Sainte Marie (Reunion Island)

RFS Year EOS Year System Cost (USD) Length (km) Initial Capacity (Tbps) Design Capacity (Tbps) Fiber Pairs Wavelengths per Fiber Pair Capacity per Wavelength (Gbps) Owners System Installer Region

2009 2034 $30,000,000 1,091 0.02 1.28 2 64 10 France Telecom, Orange Madagascar FCR, Orange Marine Indian Ocean Pan-East Asian

Page 185 of 297 pages


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Submarine Cable Almanac Issue 27 by Submarine Telelecoms Forum - Issuu