Week Six Task 01
Lofts
1.1
1.2
1.3
1.4 {0,150,150}
{0,0,150}
{150,0,150}
{0,75,150} {150,150,150}
{150,0,150}
{150,50,150}
{150,90,150} {150,150,150}
{150,75,150}
{30,0,0}
{150,0,75}
{0,0,0}
{150,0,0}
{150,120,0}
{150,100,0}
Paneling Grid & Attractor Point
{Index Selection}
{Index Selection}
2.1
2.2
{-150,-3,80}
{Index Selection}
{Index Selection}
2.3
2.4
{-141,196,0}
{167,-19,71} {107,-10,29}
{131,50,0} {39,181,0}
Paneling
{Attractor Point Location}
{Attractor Point Location}
{Attractor Point Location}
{Index Selection}
3.1
3.2
3.3
3.4
+
+
+
+
Design Matrix 1:5
Key {0,0,0}
Attractor / Control Points (X,Y,Z) Attractor / Control Curves Grid Points
Task 01 Matrix I chose surface 1.1 as they are not too close or too far, they don’t touch each other and look good, they just fit nicely and generate a wide opening. For panelling grids, they are all applied with point attraction. 2.1 is selected for later developing. 3.1 was chosen as it has three dimensional surfaces on both sides, both start basically with the pyramid shape. Surface on the left is relatively flat compared with the other one.
8