Ceren Şatırlar Balcı, Barkom Group Drilling Rigs and Equipment, Turkey, outlines the importance of the feasibility stage and field investigations of the drilling sector to mining geoscience.
D
rilling has become a technique that requires constant improvements, following the increase of raw material needed as a result of the industrial revolution. Deep and shallow drilling has been implemented in petroleum, groundwater exploration, geotechnical investigations and the mining industry, in particular, since the second half of the 19th century. Every drill rig manufacturer should play its role in a drilling industry that is actually a primary supplier to every single industry in the whole world. In this article, feasibility stage and field investigations of the drilling sector are discussed as one of the most important segments of engineering and mining geoscience.
Preliminary stage of field examinations and feasibility investigations are often fulfilled with heuristic engineering approaches. There are several parameters and variables that affect the performance and the efficiency of drilling operations. These include: The experience of the driller. The technical specifications and durability of the drill rig. The quality of the drilling equipment used, and its suitability to the ground conditions. The use of the right drilling additives with the right mixtures.
global mining review // September 2021
69