J A Y I T A S H E T T Y
Licensed Architect with Council of Architecture, India
M.arch II - Graduate Student, Georgia Tech - 2023| Atlanta
SUMMARY
An educational background in architecture with spatial understanding and practical experience has helped me in enhancing my interest towards designing, space analysis, planning methods and design resolution.
The main focus of my work currently includes architecture, urbanism and facilityoriented public programs.
CONTACT
www.linkedin.com/in/jayita-shetty jayitashetty@gmail.com +1(206)-495-2460
June 2023
ARCHITECTURAL INTERN
Corcoran Ota Inc., Sandy Springs, Georgia
SELECTED WORKS 2013- 2023
Ongoing
Key Responsibilities
Design Development and Construction Drawings
ARCHITECTURAL INTERN
May 2022
TAP Design Group, Atlanta, Georgia
Masters in Architecture (MArch II)
2021- 2023
Georgia Tech School of Architecture
Bachelors in Architecture
2013-2018
Aditya College of Architecture, India
SKILLS
EDUCATION COMPETITIONS
Earth School Competition, Kafoutine, South Africa | 2022
Design for self cleaning toilet for R-Ward, Mumbai, India| 2015
NMIMS Crossfire Debate - Qualified for quarter finals | 2015 -2016
SPA Bhopal, India - Participation | 2013
CAPABILITIES / SKILLS
Team Work
Creative Spirit
Fast Learner
Efficient
Research Oriented
Photography
Hand Sketching
May 2023
TAP Design is a multi- disciplinary design firm that combines technical proficiency, with creative energy to provide the clients with a service that fits their needs
Key Responsibilities
Design resolution, planning and presentation, Detail work, Illustration, technical and permit drawings
Projects
Brumby Lofts | 2022
Cindy Ensor Designs | Atlanta | 2022
Portadale Lofts | 2022
Apricot | 2022
Dec 2018
JUNIOR ARCHITECT
P.K.Das and Associates, Mumbai, India
May 2021
PK Das & Associates is a multi faceted practice that engages with design in a variety of scales, from architectural interiors and building design to neighborhood based urban design and planning.
Key Responsibilities
Conceptualising and design resolution, planning and presentation, Illustration,3D visualisation, technical and tender drawings and site co-ordination.
Projects
Urban Design | Motilal Nagar Goregaon, Mumbai | February 2019 -2021
Koraput Sports Complex | Odisha | October 2019- 2020
Open Baramati Township| December 2020 - March 2020
Office Interiors and tendering | November 2020 - May 2021
Nov 2016
ARCHITECTURAL INTERN
Salil Ranadive Architects Mumbai, India
April 2017
Key Responsibilities
Conceptualising and design resolution, 3D visualisation and construction drawings.
JAYITA SHETTY JAYITA SHETTY Page Number 2 ACADEMICS~MASTERS
GEORGIA INSTITUTE OF TECHNOLOGY
Advanced Intermediate Intermediate Intermediate Intermediate Intermediate Intermediate Beginner Beginner Advanced Auto Cad Adobe Creative Suite Rhino Revit Sketch up Grasshopper Enscape Lumion ArcGIS Microsoft Office
designing new carbon neutral township with shared social spaces for Nihonbashi, Tokyo Japan
redesigning main pedestrian bridge in the city Baramati, India
Hutchinson Island, Savannah
sports complex, Odisha, India
raising community: adaptation in the Yazoo Mississippi Delta Region - Community Center and Housing
a learning Oasis- Secondary School in Kafountine, Senegal
a learning Oasis- Secondary School in Kafountine, Senegal
summer internship and part time -design development and permit set Atlanta, GA
whitworth gallery Manchester, England
structural concept, design and detailing Highline 23, New York and Portland Office Building
mixed use co-working space
Mumbai, India
design intervention using rhino and grasshopper plug in
architectural intervention to design an interface between design schools and industries
Ahmedabad, India
Page Number 2 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 1 ACADEMICS~MASTERS The focus was to find the methodology
05 11 03 09 06 12 07 13 04 10
C O N T E NT S
02 01 08 ACADEMICS~UNDERGRADPROFESSIONAL ACADEMICS ~ GEORGIA INSTITUTE OF TECHNOLOGY ~MASTERS GEORGIA INSTITUTE OF TECHNOLOGY GEORGIA INSTITUTE OF TECHNOLOGY WT-1 ELEVATION CUT SHOWN AT SUSPENDED SOFFIT FEATURE EXISTING STOREFRONT ENTRY DECAL BY OWNER BAR PT-2 INTERIOR STOREFRONT ELEVATION INTERIOR ELEVATION WT-1 B-2 WD-2 BUILT- BOOTH B-1 B-3 PAINT TRIM, MOULDING, TYP. PIN MOUNTED LOGO SIGN BY SIGN VENDOR. COORDINATE W/ OWNER MTL-2 CS-2 6292022
NIHONBASHI, TOKYO,JAPAN RESEARCH STUDIO II- SPRING 2023
Team: Jayita Shetty, Annie Yining Chen, Xie Yan
The objective of the project is to design a township for Nihonbashi district. The changes in Nihonbashi district considering the flying car port near Sumidha river makes it an example of what Tokyo would look like in 2050. This encouraged the project to be the futuristic global city.
The project has programs on different level with commercial spaces and retention park at the ground level. The green spaces continue to the office levels with green slopes. The residential floors are at the top of the buildings with view to canal and Sumidha river.
SITE AND DESIGN DEVELOPMENT
Page Number 4 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 3 ACADEMICS~MASTERS
Merging plots and segregating vehicular and pedestrian streets
Redesigning the existing AmenitiesCommercial zones connected with the green area on ground level
Offices spaces connected with common podium
Residential floors connected with green corridors
Retention park at the center of the development
TRANSPORT NETWORK
Page Number 6 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 5 ACADEMICS~MASTERS SITEPLAN NEW PROPOSED BUS STOPS VERTICAL PARKING PORTS BUS ROUTES CONNECTING FLYING CAR SITE AND THE CITY PEDESTRIAN NETWORK
considering the topography of the site from highest point for buildings and lowest point with retention pond of the park
Page Number 8 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 7 ACADEMICS~MASTERS
SECTION
WATER RETENTION PARK
EXISTING TOPOGRAPHY RETAINED FOR WATER RETENTION
WATER RETENTION POND TO HOLD AND DISTRIBUTE WATER
Max Capacity - 33,14,865
gal. (approx)
CULTURAL CENTER APPROACHED FROM THE PARK
PARK CIRCULATION
Page Number 10 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 9 ACADEMICS~MASTERS
GREEN SLOPES CONNECTING THE PARK AND THE BUILDINGS
Page Number 12 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 11 ACADEMICS~MASTERS
CO2 EMMISION
ENERGY DEMAND
ENERGY DEMAND AFTER INSTALLATION OF SOLAR PANEL
CO2 EMISSION after GREEN ROOFS
ENERGY ANALYSIS
HUTCHINSON ISLAND, SAVANNAH | DESIGN AND RESEARCH STUDIO I - FALL 2022
Team: Jayita Shetty, Shruthi Hariharan, Riya Shah
“In a union, indeed, the things between which there is this relation are called parts, and taken together with the union, a whole. This occurs as often as we suppose a plurality of things at the same time to be One. One, instead, means something that we think of in a single intellectual act, that is, at the same time.”
G W Leibniz, Dissertation on Combinatorial Art, 1666
LOCATION AND TOPOGRAPHY:
The site is located on the hutchinson island right across the the Historic district of Savannah. The land is predominantly flat but is one of the highest points on the Hutchinson island.
TRANSPORTATION:
The island is connected by roads and ferry to the Historic District. You can reach the site by road via the Tamaldge Memorial Bridge or by the Ferries that run to the convention centre from City Hall, Trade center.
Page Number 14 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 13 ACADEMICS~MASTERS
Page Number 16 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 15 ACADEMICS~MASTERS MASTER PLAN vision for a smart city
VIEWS OF THE CITY
Green spaces come in various structures, sizes and functions. Some are functional in nature. Most are recreational and a few are residual.Whichever form they take up, they improve the imageability of the fabric making spaces more habitable and vibrant, opening up opportunities for improved engagement, economy and health.
Page Number 18 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 17 ACADEMICS~MASTERS
A unique site with stories of undefinable boundaries, A rememberance and history.The intangible but visible aspects of the site are not different from the built environment Resilience is not just to overcome the unexpected but it is to embrace and make it inclusive.
This particular phase is to integrate the intangible into spaces for community interaction.Establishing a relationship by balancing the nature of each natural forces.
Page Number 20 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 19 ACADEMICS~MASTERS
Raising resilient community: Community Center and Housing
YAZOO MISSISSIPPI DELTA REGION | DESIGN AND RESEARCH STUDIO II - SPRING 2022
Page Number 22 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 21 ACADEMICS~MASTERS
The new programs branching into the existing town - Community Center along the river with walkways connecting to housing cluster
MASTER PLAN
EARTH SCHOOL COMPETITION
SECONDARY SCHOOL IN KAFOUTINE, SENEGAL SPRING 2022
Team: Shruthi Hariharan, Jayita Shetty
Spaces weaved with the green spine - the heart of the design. The concept is to have an interactive relationship with the spaces as well as the open spaces that hold all the structures together.
Construction system
Multipurpose hall, office and toilets and the plinths for the classrooms are built in this phase. The plinths can host communal phase. The plinths can host communal gatherings and activites
4 sets of Classrooms and toilet at the south end of the site are built. The green spine and north side plinth provide a balanced enviroment to play and interact for the teenagers.
Phase 3: Additional classrooms with insertion of open spaces to connect the rest of the site with the green spine by breaking the arrangement of classroom structures
Roof structure of the closed courtyard to bind the green spine and the structures together, acting as a shaded and interactive platform for outdoor activities
The site presents itself with dense vegetation at its core. The design process is centred around embracing its rich flora and making it the main focus spine
All the structures in the school open out to this green spine and conciously create a protected enviroment for the children.
Services for building incorporated in the landscape area
Page Number 24 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 23 ACADEMICS~MASTERS
Phase 1:
Phase 2:
Phase 4:
4 4 4 4 4 4 4 4 2 1 3 6 7 4 4
1. Multipurpose Hall
2. Director’s Cabin
3. Teachers’ Room
4. Classroom
5. Open Courtyard
6. Closed Courtyard
7. Toilets
Education plays a significant role in shaping an individual’s future and help uplift the community they are associated with. Senegal is striving to achieve equity and quality of education; this requires infrastructure that ensures accessibility to the learning oasis in Senegal. Jangukaay envisioned to provide spaces that celebrate and enrich the process of learning.
Green weaved spaces at the center of the design encourage engagement and activities. This open spaces works as common spaces for assembly and play.
Page Number 26 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 25 ACADEMICS~MASTERS
The roof here aims to protect as well as integrate with nature. The language of the roof is that it opens the interior out to exterior.
Page Number 28 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 27 ACADEMICS~MASTERS
VIEW IN THE CENTER COURTYARD SHARED SPACES ON THE RAISED PLATFORM
MANCHESTER,ENGLAND| REPRESENTATION AND RENOVATION SPRING 2022
Team: Hasrat Kaushal, Jayita Shetty
The objective of this project was to represent amalgamation of a number of separate stages of development that have been undertaken over the past 126 years.
The collages and models are explaining the facade design to open up to the Witworth garden.
Page Number 30 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 29 ACADEMICS~MASTERS
Page Number 32 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 31 ACADEMICS~MASTERS
collage representing the changes that took place in the neighbourhood materials on the extended structures reflect the trees around the building. This gives an illusion of spaces floating and belnding with the outside.
Page Number 34 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 33 ACADEMICS~MASTERS
INTEGRATED BUILDING SYSTEM
HIGHLINE 23, NEW YORK UNDERSTANDING STRUCTURAL SYSTEMS AND DETAILS SPRING 2022
Team: Patricia Rangel, Aparna Reghukumar, Jayita Shetty, Kevin Miller
The Highline 23 project nudges itself center court onto the converted rail line park known as the High Line. Finished in 2011, HL23 marked Denari’s first go at a freestanding building. The design has a cantilevered portion that extends the HL23 on the upper floors. The structure is supported by diagnol bracing of steel columns at the perimeter of the building and tied back to a moment frame running along a partiwall. Lateral forces of the building are resisted using a steel plate sheer wall.
Page Number 36 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 35 ACADEMICS~MASTERS 03
I section column Glazing 1” Joint Solid
CMU wall with Grout fill Grout Solid Water
on the wall Fire
to
NORTH WEST PEEL AWAY TYPICAL CORNER DETAIL WITH EXTERIOR LAYER
Steel Mullion
proofing
proofing Refer
Detail 03A| A6
Sealant
Metal angles holding metal cladding sealed with back up panels Metal Cladding with fully sealed back up panels
backup rod Solid Steel Mullion
03A
Metal angles holding metal cladding sealed with back up panels
Metal cladding Water proofing
WEST FACADE - CONNECTION OF RIGID INSULATION AND WATER PROOFING TO SUBSTUCTURE
Glazing
Stainless Steel Bead Blasted Covers
The south elevation facing West 23rd Street is a spandrel free curtain wall. The superstructure’s steel zebroid - bracing runs the height of fourteen floors and visible through the curtain wall. The building enclosure has two structural layers. The primary structure has circular columns and I-section beams. The secondary structure is installed to support the double-glazed curtain wall to each floor slab.
2” High Density Polystyrene
Waterproofing
Liquid Bituthene
Refer to Detail 05| A11
Depressed slab for bathroom
Edge Plate
Firestop
Spreader beam
Structural Beam
Page Number 38 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 37 ACADEMICS~MASTERS
Refer to Detail 04|A-8
04A NORTH FACADE - LOBBY STOREFRFONT CURB - GLASS DETAIL AND EXTERIOR CLADDING
Page Number 40 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 39 ACADEMICS~MASTERS 05A NORTH FACADE - TYPICAL OPERABLE WINDOW DETAIL TYPICAL OPERABLE WINDOW- HEAD DETAIL TYPICAL OPERABLE WINDOW- SILL DETAIL IGU GL-1 Operable Window Frame Operable Window Frame Fixed Frame fastened to steel mullion Fixed Frame fastened to steel mullion Sealant & Backer Rod IGU GL-1 Shim to level glass
Fireproofing
Page Number 42 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 41 ACADEMICS~MASTERS
Support Angle on Embeds
Custom shape shade box
Fire stop
Smoke Seal Metal Coping Cover
INTEGRATED BUILDING SYSTEM
PORTLAND SHIMMEY
UNDERSTANDING STRUCTURAL SYSTEMS AND DETAILS
FALL 2021
Team:Jayita Shetty, Colin Finnigan, Kevin Miller, Jimenez Chavez, Tyler Pirovic
Page Number 44 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY Page Number 43 ACADEMICS~MASTERS
SAW TOOTH ROOF to let indirect, Northern light in VERITCAL FINS to direct light into the space PHOTOVOLTAIC PANELS on Eastern Facade to offset energy footprint Sketch No: Scale: Reference: Date: 50% DD Issued For: Date: Oct. 14, 2022 6" 1'-0" PASSIVE STRATEGIES M003 PORTLAND SHIMMEY 11/14/22 6" = 1'-0" 1 SUNLIGHT STRATEGIES 6" = 1'-0" 2 ATRIUM VENTILATION 6" = 1'-0" 3 SUMMER STRATEGY (HVAC + ATRIUM) 6" = 1'-0" 4 WINTER STRATEGY (HVAC + ATRIUM) 4 1.8 H G F E D C B A 5270 SF EVENT 158 SF DATA 319 SF WMNS 343 SF MENS 247 SF RECEPTION 498 SF CONFERENCE 274 SF CONFERENCE 4 1.8 3 H G F E D C B A 158 SF DATA 314 SF WMNS 345 SF MENS 166 SF ELEC 374 SF LOUNGE 87 SF STO 204 SF STAIR 293 SF STAIR 305 SF CONF 305 SF CONF 113 SF PANTRY ATRIUM 1 1.8 5 2 441 SF CONFERENCE 147 SF OFFICE 150 SF OFFICE 293 SF STAIR 129 SF OFFICE 129 SF OFFICE 126 SF OFFICE 129 SF OFFICE 127 SF OFFICE 168 SF DATA 443 SF CONFERENCE 111 SF OFFICE 115 SF OFFICE 36 SF ELEV Redundant Room MECH 166 SF ELEC 4325 SF OPEN OFFICE ATRIUM Sketch No: Scale: Reference: Date: 50% DD Issued For: Date: Oct. 14, 2022 1" = 20'-0" HVAC FLOOR PLAN M101 PORTLAND SHIMMEY 11/13/22 1" = 20'-0" 1 Level 1 -HVAC ZONE 1" = 20'-0" 2 Level 2 -HVAC ZONE 1" = 20'-0" 3 Level 3 -HVAC ZONE 1 4 1.8 H G F E D C B A 2 RD EXISTING ROOF BELOW EXISTING ROOF BELOW STEEL GRATING MECHANICAL PLATFORM. SKYLIGHT AIR SOURCEHEAT PUMP SKYLIGHT SKYLIGHT SKYLIGHT ROOF OVERFLOW DRAIN ROOF DRAIN PLUMBING CHASE 42" MIN PARAPET STEEL GRATING MECHANICAL PLATFORM. ROOF WALKING PAD ROOF EXHAUST DEDICATED OUTDOOR AIR SOURCE RD RD RD RD SCUPPER SKYLIGHT 1' 6" 0' 0" SLOPE 11' 0" 10' 6" SLOPE M700 2 M700 1 EQUIPMENT MANUFACTURER SHALL PROVIDE ONE IF THE FOLLOWING: 1. NOA CERTIFICATION 2. STATE OF FLORIDA PRODUCT CODE APPROVAL 3. THIRD PARTY ANALYSIS BY REGISTERED ENGINEER IN FLORIDA PROVIDING COMPLIANCE WITH 9B-72 UNDER 9B-72.070 PROVING THE EQUIPMENT MEETS 150 MPH WIND LOADING. IF NECESSARY TO ACHIEVE 36" MIN ABOVE ROOF, REMOVE AND RELOCATE FACTORY O.A. INTAKE HOOD ASSEMBLY MIN. 36" AFR WITH WEATHER-PROOF GALV. DUCT ELBOW AND EXTENSION. DUCT SHALL BE FULL SIZE OF HOOD CONNECTION TO MIXING SECTION. BIRDSCREEN 36" MIN. MVD RIGID FILTER SECTION, PREAND FINAL FILTERS MEDIUM ACCESS SECTION MIXING BOX FLEX CONNECTION, (TYP.) ROUTE CONDENSATE LINE TO NEAREST ROOF DRAIN, FULL SIZE RETURN DUCT SUPPLY DUCT ROOF VIBRATION ISOLATION PAD ALL AROUND TOP OF CURB UNDER BTU FAN SECTION MEDIUM ACCESS SECTION WITH UV LIGHTS COOLING COIL Sketch No: Scale: Reference: Date: 50% DD Issued For: Date: Oct. 14, 2022 As indicated HVAC ROOF PLAN M104 PORTLAND SHIMMEY 11/13/22 1" = 20'-0" 1 ROOF HVAC 1/16" = 1'-0" 2 HVAC ROOF TOP UNIT 1 4 1.8 3 H G F E D C B A 5 1.8 H G F E D C 5 1. REFER TO E-001 FOR ELECTRICAL SYMBOLS LEGEND AND ABBREVIATIONS. LIGHTING GRAPHIC LEGEND RL-1 RL-SD4-Q LP-SRADIANT HEATING PANEL Sketch No: Scale: Reference: Date: 50% DD Issued For: Date: Oct. 14, 2022 As indicated ELECTRICAL LIGHTING PLAN E201 PORTLAND SHIMMEY 11/13/22 LIGHTING FIXTURE SCHEDULE LV0&1 Type MarkDescriptionManufacturer Assembly Description LUMENS COLOR TEMP VOLTAGEWATTSNOTES Count <varies> 8 D4-QRecessed Can Lighting Incandescent 176 LP-S-1 Decorative PendantJoana Bover 4 RL-1 Recessed LinearAmerlux 252 1" = 20'-0" 2 Level 1 LIGHTING 1" = 20'-0" 1 Basement LIGHTING ELECTRICAL PLAN GENERAL NOTES
STAGE 2
Team: Jayita Shetty, Mason Burrow, Matthew Mcdonald, Harshika Seth
The inspiration for the public pavillion was a spiral enclosure with paltforms on different levels. The idea of having a park landscape form that provides spatial function to the park. First is what we call free space: benches, skate park, play space, etc. Secondly, the interior hollowing of the form creates a market space. And lastly, the theatre is connected to a screen on the desk.
MEDIA AND MODELLING
FALL 2021- STAGE 1
Patterns of overlapping: Experimenting creating patterns through grashopper script.
Formal Operations
Page Number 46 ACADEMICS~MASTERS JAYITA SHETTY JAYITA SHETTY
V3
Free Space Market eatre FREE SPACEMARKETTHEATRE
This project was a design proposal to reconstruct an existing dilapated bridge in the city of Baramati, Maharashtra. The bridge was of historical importance to the town and it was essential to construct a new one to connect to the town center.
PROFESSIONAL Page Number 48 PROFESSIONAL JAYITA SHETTY JAYITA SHETTY Page Number 47
BARAMATI, MAHARASHTRA, INDIA
SPORTS COMPLEX, ODISHA, INDIA
Team: Jayita Shetty, Shreshtha Malhotra, Vishal
The intend of the building is to extend the program. Displaying art from static to performing stage. Thus the extension of program was achieved to be a catalyst for inside –out relation and revive the lost essence of the arcade corridor.
The design is governed by the geometry of the space in which the central stage plays an important role in engaging the public spaces with the private or the outside to of central stage with seating through the entire circumference of the circular stage.
The public corridors are the highlight of the design. The open spaces in the center of the project in connectes to the buildign corridrors od the building.
The different sections in the building would connect to the courtyard and stadium on the other side with a large double height lobby overseeing the other spaces of the building. The building also has stay rooms and indoor courts. The stadium level connects to the cafe opening for public engagement.
PROFESSIONAL JAYITA SHETTY JAYITA SHETTY Page Number 49
PLAN * 3D view credits Shreshtha
PROFESSIONAL PROFESSIONAL JAYITA SHETTY JAYITA SHETTY Page Number 51
opening and responding to the stadium
Interior project for commercial building in Ahmedabad. The different levels with different functionalities. The deisgn inspiration was to have an open office system with intersecting meeting spaces in intervals on the floor plan on every level
PROFESSIONAL Page Number 54 PROFESSIONAL JAYITA SHETTY JAYITA SHETTY Page Number 53
Ground Floor Fourth Floor WAITING AREA 7.3M 8.1M RECREATION AREA 6.0M 8.7M MEDICAL ROOM 3.2M 5.1M 3.3M 5.1M 2.35M 2.65M 2.35M 2.65M 2.35M 2.65M 2.35M 2.65M 5.00M 3.4 36 3.2M 5.1M 3.2M 5.1M 3.35M 5.1M CONFERENCE ROOM 3.9M 5.1M FACILITY MANAGEMENT/ FIRE SAFETY D2 D2 D2 D2 D2 D6 D5 GROCERY STORE P3 P5 D3 D3 D3 D3 CONCIERGE 1.9M 2.10M D1 11.7M 8.5M ENTRANCE 5.5M 2.95M 11.7M 2.55M D5 D10 D9 D9 D9 GROUND FLOOR LVL. FFL+ 61.466M. FOURTH FLOOR LVL.FFL+ 75.866M. FIRST FLOOR SECOND FLOOR THIRD FLOOR LVL.FFL+ 65.066M. LVL.FFL+ 68.666M. LVL.FFL+ 72.266M. TERRACE FLOOR LVL.SSL+ 80.291M. NERVE CENTER GROUND LEVEL LVL. FFL+ 61.166M. TERRACE LVL. SSL+ 61.391M. LVL.SSL+ 64.991M. LVL.SSL+ 68.591M. LVL.SSL+ 72.191M. LVL.SSL+ 75.791M. FIRE SAFETY TRAINING ROOM MEETING ROOM DIRECTORS CABIN TOTAL adani GAS D2 WAITING AREA ID CELL SECURITY CONFERENCE ROOMS D2 D2 D2 D2 D2 VP CABINS COLLABORATION AREA OPEN OFFICES COLLABORATION AREA OPEN OFFICES CUBICLES MEDICAL ROOM OPEN OFFICES VP CABINS COLLABORATION AREA OPEN OFFICES CUBICLES LIFT LOBBY CUBICLES SECRETARY WORK STATIONS 4mm Veneer cladding 12mm with 8mm grooves C10 C12 Luster paint finish 12mm toughened glass Curved partition wall aluminium framework 12mm thk toughened glass with 12mm toughened glass with 12mm toughened glass 12mm toughened glass with 12mm toughened glass feature partition wall aluminium framework finished protective protective film protective Luster paint finish partitions per selection gypsum board, armour paint finish partitions per selection gypsum board, armour paint finish Luster paint finish per selection internal partitions, separated feature partition wall aluminium framework finished 12mm toughened glass 12mm gypsum false ceiling 12mm gypsum false ceiling internal partitions, separated F12 per selection per selection T8 T8 T18 T18 T19 SECRETARY D11 D2 ADMIN STORE MEETING ROOM 3.0M X 3.1M 3.85M 4.4M CEO CABIN 5.15M 8.1M CUBICLES OPEN OFFICE -17+1 CUBICLE CUBICLE CUBICLE CUBICLE LOUNGE AREA 4.7M 4.5M EXECUTIVE DINING 5.2M 4.4M CUBICLE D2 D2 D2 D2 P9 P10 P11 P12 DIRECTOR'S CABIN 5.5M 3.65M REPROGRAPHY AREA ELECTRICAL ROOM 2.60M 1.75M HUB ROOM 2.60M X1.75M UPS ROOM 2.5M 1.85M BATTERY ROOM 2.5M 1.85M BOARD ROOM 7.2M 5.9M D2 D4 D6 D5 D2 TERRACE 14.4M 8.35M LIFT LOBBY 6.8M 2.55M RECEPTION 4.97M 3.2M REPROGRAPHY AREA 7.2M 2.85M D5 D5 D8 D9 D10 D9 D9 D9 D11
Team: Gaurav Manjrekar, Jayita Shetty, Vandita Kedia
ENTRANCE LOBBY SPACES AND CORRIDORS
The lobby area leads to the central circular space with digital screen on it, this space acts as a buffer between the common spaces and other programs in the office. The spaces at level 1 are mostly common kitchen and cafeteria for the staff members.
PROFESSIONAL Page Number 56 PROFESSIONAL JAYITA SHETTY JAYITA SHETTY Page Number 55
OFFICE AND COMMON SPACES
The 4th floor, last level of the building has offices for executive and chief of staff of the company. The entrance at this floor has a featured bamboo garden. It also has a landscape area outside at he terrace level for social events and gstherings.
PROFESSIONAL Page Number 58 PROFESSIONAL JAYITA SHETTY JAYITA SHETTY Page Number 57
PORTERDALE LOFTS
Team: Max Boston, Jayita Shetty
The scope of work the existing property is an apartment complex. The proposed scope of work consisted of the interior remodel of units at the first floor of the existing two-story building. The remodel included the demolition of interior partition walls, doors and the installation of
new non-load bearing interior partition walls and doors as scheduled.
New interior millwork and floor, ceiling, and wall finishes was provided & installed as scheduled.
PROFESSIONAL Page Number 60 PROFESSIONAL JAYITA SHETTY JAYITA SHETTY Page Number 59
S SUITE 2114 SUITE 2110 EXISTING WALL LIGHTS TO REMAIN, TYP. EXISTING MIN. 8"X8" GRIDER BEAMS AND 4" MIN. THICK CONCRETE FLOOR/CEILING ASSEMBLY TO REMAIN, TYP. VERIFY EXISTING ASSEMBLY PROVIDES MIN. 1-HR RATING IN COMPLIANCE WITH IBC TABLE 722.2.2.1. G.C. TO MAINTAIN EXISTING RATING, TYP. EXISTING HVAC DUCTWORK TO REMAIN TO THE GREATEST EXTENT POSSIBLE.REWORK EXISTING /PROVIDE NEW PORTIONS OF DUCT IF/AS NEEDED. MATCH EXISTING METAL SPIRAL DUCTWORK, TYP. IN AREAS WHERE CEILINGS ARE OPEN TO ABOVE EXISTING EXHAUST DIFFUSERS TO REMAIN INSTALL NEW FIXTURE AS SCHEDULED EXISTING SPRINKLERS REMAIN, TYP.VERFIY LOCATION AND RELOCATE IF/AS REQUIRED. EXISTING LIGHTING LAYOUT TO REMAIN TO THE GREATEST EXTENT POSSIBLE. PROVIDE COST/BID FOR COST TO REPLACE EXISTING FIXTURES WITH NEW AS SCHEDULED. PROVIDE & INSTALL NEW PENDANT LIGHT FIXTURES TO MATCH EXTG AS SCHEDULED, TYP. INSTALL NEW RECESSED DOWNLIGHT FIXTURE AS SCHEDULED BEDROOM BATH BATH W.I.C. LIVING/DINING LIVING/DINING BEDROOM CL-1 PT-2 CL-1 PT-2 CL-1 PT-2 GYP PT-1 GYP PT-1 CL-1 PT-2 CL-1 PT-2 CL-2 PT-1 CL-1 PT-2 CL-1 PT-2 CL-1 PT-2 L-1 L-1 L-1 L-1L-1 L-1 L-1 L-1L-1 L-1 L-1 L-1 L-1 L-1L-1 L-1 L-1 L-1 L-1 L-1 L-1 L-2 L-2 L-3 L-1 L-3 L-3 L-4 L-4 L-5 L-5 L-6 L-6 L-6 L-6 L-6 L-6 L-6 L-6 L-6 L-6 L-6 10' 7.75" A.F.F. B.O. SPRINKLER VERIFY LOCATION) 11' 10" A.F.F. EXISTING VERIFY 11' 10" A.F.F. EXISTING VERIFY 11" A.F.F. EXISTING VERIFY KITCHEN KITCHEN 11' 7" A.F.F. 2" A.F.F. 10' 4" A.F.F. EXISTING VERIFY 8' 9" A.F.F. B.O. DUCTWORK EXISTING VERIFY 10' 9" A.F.F. B.O. BEAM 2 2 3 4 GYP PT-1 2 11' 7" A.F.F. EXISTING VERIFY 10' 4" A.F.F. EXISTING VERIFY L-1 L-4 L-6 CL-1 PT-2 CL-1 PT-2 LINE OF EXISTING SOFFIT (B.O. GYP. @ 10'-4" A.F.F.) TO REMAIN. VERIFY HEIGHT IN FIELD, TYP. 11' 7" A.F.F. EXISTING VERIFY EXISTING MIN. 8"X8" GRIDER BEAMS AND 4" MIN. THICK CONCRETE FLOOR/CEILING ASSEMBLY TO REMAIN, TYP. VERIFY EXISTING ASSEMBLY PROVIDES MIN. 1-HR RATING IN COMPLIANCE WITH IBC TABLE 722.2.2.1. G.C. TO MAINTAIN EXISTING RATING, TYP. EXISTING HVAC DUCTWORK TO REMAIN TO THE GREATEST EXTENT POSSIBLE.REWORK EXISTING/ PROVIDE NEW PORTIONS OF DUCT IF/AS NEEDED. MATCH EXISTING METAL SPIRAL DUCTWORK, TYP. IN AREAS WHERE CEILINGS ARE OPEN TO ABOVE PROVIDE AND INSTALL NEW CEILING DIFFUSERS AND EXHAUST FAN IN TOILET ROOM INSTALL NEW FIXTURE AS SCHEDULED EXISTING SPRINKLERS REMAIN, TYP.VERFIY LOCATION AND RELOCATE IF/AS REQUIRED. EXISTING LIGHTING LAYOUT TO REMAIN TO THE GREATEST EXTENT POSSIBLE. PROVIDE COST/BID FOR COST TO REPLACE EXISTING FIXTURES WITH NEW AS SCHEDULED. INSTALL NEW RECESSED DOWNLIGHT FIXTURES AS SCHEDULED, TYP. 1 1 OFFICE EXISTING AHU ABOVE RESTROOM TO REMAIN. G.C. TO VERIFY EQUIPMENT IS IN GOOD WORKING CONDITION, TYP. EXISTING WALL LIGHTS TO REMAIN, TYP. 1'-0" 1'-0" 24'-1" 24'-2" 11'-9 1 2 5'-0" 29'-4" 7'-6" 14'-1" 6'-0 1 2 14'-9 1 2 20'-2" 4'-2" 31'-0 1 2 6'-3 1 2 3'-8 1 2 14'-9 1 2 4'-7" 2'-11" 12'-10" 15'-9" 7'-111 2 7'-3" 5'-0" 2'-4" 4'-11 1 2 2'-4" 15'-11 1 2 28'-8 1 2 14'-9 1 2 11'-91 4'-6 1 2 12'-0" 4'-51 2 6'-9 11'-91 PROVIDE & INSTALL HARD WIRED SMOKE DETECTORS. LOCATE INSIDE BEDROOM(S) AND OUTSIDE BEDROOM(S) (WITHIN 10'-0") IN ACCORDANCE W/ NEC, TYP. 12012022 01 02 04 05 06 07 12 03 08 09 10 11 13 12 11'-6" 1,573 SQ. FT. 1,581 SQ. FT. A5.1 A5.2 A5.2 4 A5.1 1 BEDROOM BATH BATH 24'-1" 24'-2" 11'-9 1 2 5'-0" 29'-4" 60'-7" 7'-61 2 7'-91 2 7'-12 7'-41 2 7'-9" 7'-6" 14'-1" 6'-0 1 2 14'-9 1 2 60'-6" 20'-2" 4'-2" 24'-1" 24'-2" (INTERIOR) SHARED EXIT CORRIDOR UNIT ENTRY DOOR TO INTERIOR HALL EXIT CORRIDOR IS EXISTING TO REMAIN. VERIFY EXISTING HR. MIN. FIRE RATING, TYP. UNIT ENTRY DOOR TO PAVED PATIO SIDEWALK AREA 31'-0 1 2 6'-3 1 2 3'-8 1 2 14'-9 1 2 4'-7" SUITE 2114 SUITE 2110 6'-0" 4'-0" 8'-0" 2'-11" 12'-10" 15'-9" 7'-112 7'-6" 4'-31 7'-61 2 7'-3" 3'-0" (ACCESSIBLE) W.I.C. OFFICE KITCHEN LIVING/DINING KITCHEN LIVING/DINING BEDROOM WD REF REF FURR OUT WALL AGAINST EXISTING W/ 6" STUDS AND NEW 5/8" MIN. GYPSUM WALL BOARD @ FINISH SIDE. PROVIDE FINISH AS SCHEDULED. EXISTING BATHROOM LAYOUT TO REMAIN. PROVIDE NEW FIXTURES & FINISHES (PRICE AS OPTIONAL) EXISTING WINDOWS TO REMAIN PROVIDE CLEAR FLOOR SPACE AT FIXTURES IN BATHROOM, TYP. NEW INTERIOR PARTITION WALL W/ 6" STUDS @ 16" O.C. WITH NEW 5/8" MIN. GYPSUM WALL BOARD @ EACH SIDE. EXISTING WINDOWS TO REMAIN, TYP. N A4.2 EXISTING ELECTRICAL PANEL TO REMAIN NEW IN-FILL AT EXISTING OPENING @ OLD ENTRY DOOR. PATCH/REPAIR AND FINISH TO MATCH MIN. FIRE RATING AT SURROUNDING WALLS, TYP. 4 3 4 6 7 3 5 8 PROVIDE BLOCKING REINFORCEMENT IN WALL AT TOILET AND SHOWER FOR INSTALLATION OF FUTURE GRAB BARS, TYP. 9 1 1 8 7 8 EXISTING WATER HEATER AND AHU TO REMAIN IN EXISTING UTILITY CLOSET, TYP. NEW LAUNDRY CLOSET NEXT TO EXTG. WATER HEATER CLOSET PROVIDE CLEAR FLOOR SPACE AT W/D AT NEW UTILITY CLOSET, TYP. PROVIDE & INSTALL NEW WATER HEATER IN NEW UTILITY CLOSET. EXTG AHU TO REMAIN. SEE MEPS FOR MORE INFORMATION, TYP. PROVIDE CLEAR FLOOR SPACE AT KITCHEN FIXTURES APPLIANCES 2 FILL-IN EXISTING BOOK CASE IN WALL AND FURR OUT WALL AT NEW KITCHEN FOR PLUMBING ELECTRICAL 5'-0" 2'-4" 4'-11 1 2 2'-4" 15'-11 1 2 28'-8 1 2 14'-9 1 2 8'-1" 11'-91 2 3'-0" PROVIDE THRESHOLD TRANSITION STRIP AS NEEDED AT FLOOR FINISH TRANSITION, TYP. UNIT ENTRY DOOR TO INTERIOR HALL EXIT CORRIDOR IS EXISTING TO REMAIN. VERIFY EXISTING HR. MIN. FIRE RATING AT DOOR, TYP. 4'-6 1 2 4'-6" 12'-0" 4'-5 6'-91 2 11'-91 2 A4.2 EXISTING 16" MASONRY MIN. 1-HR FIRE RATED DEMISING WALL (VERIFY AND MAINTAIN EXISTING 1 HR MIN. FIRE RATING PER IBC TABLE 722.4.1), TYP. EXISTING 16" MASONRY MIN. 1-HR FIRE RATED DEMISING WALL (VERIFY AND MAINTAIN EXISTING 1 HR MIN. FIRE RATING PER IBC TABLE 722.4.1), TYP. EXISTING MIN. 1-HR RATED WALLS AT EXISTING EXIT ACCESS CORRIDOR. G.C. SHALL VERIFY AND MAINTAIN EXISTING 1-HR MIN. FIRE RATING IN ACCORDANCE W/ UL305 OR EQUAL, TYP. W D 12012022 1'-6" 6'-0" 7'-6" 10'-10" 3'-0" 1'-6" 3'-0" 11'-10" 7'-6"( NEW BRICK WALL) SHAKER STYLE CABINETRY, PAINTED IRON ORE DISHWASHER OPEN SHELVING ABOVE SINK 2'-0" 3'-0" 1'-6" 3'-0" EXISTING BRICK WALL TO BE REFINISHED TO NATURAL BRICK COLOR RANGE OVER THE RANGE MICROWAVE REFRIGERATOR SHAKER STYLE CABINETRY, PAINTED IRON ORE SHAKER STYLE CABINETRY, PAINTED IRON ORE PT-1 EXISTING BEAMS B.O. BEAMS @10'-10" A.F.F) EXISTING BEAMS B.O. BEAMS @10'-10" A.F.F) W-3 B-1 MATCH BRICK WALL FLATS TO EXTG. BRICK FINISH& COLOR PT-1 STAINLESS STEEL CABINET PULL, TYP. STAINLESS STEEL CABINET PULL, TYP. W-3 MATCH BRICK WALL FLATS TO EXTG. BRICK FINISH& COLOR W-1 W-3 W-3 12012022 7'-2" (VERIFY EXTG.) 2'-10" B-1 NEW GYP. BOARD DROP CEILING MAINTAIN EXISTING HEIGHT FOR EXTG LOCATED AHU ABOVE CEILING. WT-2 SUBWAY TILE SURROUND ON ALL THREE SIDES, TYP. WT-2 16 15 PROVIDE BLOCKING IN WALL FOR FUTURE GRAB BARS IF/AS NEEDED, TYP. PROVIDE ST.STEEL SCHLUTER STRIP OR BULLNOSE TILE @ EDGE OF TILE,TYP PROVIDE BLOCKING IN WALL FOR MIRROR IF/AS NEEDED, TYP. 13 17 12012022 7'-11"(VERIFY EXTG.) 3'-0" 14 16 15 PROVIDE ST.STEEL SCHLUTER STRIP OR BULLNOSE TILE @ EDGE OF TILE,TYP WT-2 B-1 WT-2 SUBWAY TILE SURROUND ON ALL THREE SIDES, TYP. PROVIDE BLOCKING IN WALL FOR MIRROR IF/AS NEEDED, TYP. 18 13 12012022
PROVIDE & INSTALL NEW 60-MIN. FIRE RATED DOOR AS SCHEDULED. G.C. TO VERIFY EXISTING OR PROVIDE ACCESSIBLE, BEVELED THRESHOLD AT FLOOR FINISH TRANSITION.
SPILLER PARK
Team: Max Boston, Jayita Shetty
The scope of work is in an existing commercial space. The proposed scope of work consisted of the interior remodel with construction of new interior walls. The work includes ceiling and floor plans. Reworking and installation of new doors. The new design for kitchen and serving area includes new millwork and details. The project was completed with the permit drawing
FURR OUT TO PROVIDE FOR PLUMBING CHASE WALLS. SEE WALL TYPE LEGEND, TYP.
PROVIDE DECORATIVE MILLWORK FAUX COLUMNS ON FINISH SIDE OF NEW FURRED-OUT WALL TO MATCH EXISTING COLUMNS BEAMS, TYP. X2. SEE MILLWORK PLAN & INTERIOR ELEVATIONS FOR MORE INFORMATION.
ELEVATION CUT SHOWN AT SUSPENDED SOFFIT FEATURE EXISTING STOREFRONT ENTRY DOORS AND WINDOWS TO REMAIN
DISPLAY SHELVING AT BACK
1.SIGN MANUF. TO VERIFY SIGNAGE IS PROVIDED & INSTALLED IN COMPLIANCE W/ CITY OF ATL SIGN ORDINANCE FOR PROPERTIES ZONED (SP-1 SA6/HC -20H A&E SIGN OVERLAY)
2.SIGN MANUF. TO SUBMIT SHOP DWGS. FOR LANDLORD APPROVAL PRIOR TO INSTALLATION, TYP.
NEW VINYL DECAL BY OWNER ON STOREFRONT WINDOW EXISTING DOOR TO REMAIN EXTERIOR STOREFRONT ELEVATION 1/4" = 1'-0" INTERIOR STOREFRONT ELEVATION
PROFESSIONAL Page Number 62 JAYITA SHETTY
1 ARCHITECTURAL
PLAN 1/4" = 1'-0" 101 1 2 3 4 DN 31'-0" 3'-4" 7'-1" 7'-31 2 " 5'-11" 5'-4" 7'-3" 4'-11" 5'-2" 6'-6" 3'-5 1 2 5'-0" 8'-8" 17'-1 1 2 30'-6" 17'-11 2 " 48'-81 2 5'-1" 12'-0 1 2 BOUNDARY LINE OF TENANT SUITE NO. 233 (771 S.F. - MERCANTILE 'M') ACCESS TO EXISTING PUBLIC RESTROOMS, TYP. X2. 5'-2" COUNTER SEATING WATER HEATER ON DRIP PAN IN SERVICE UTILITY CLOSET LOW WALL UNDER COUNTER SHOWN DASHED. SEE MILLWORK PLAN FOR MORE DETAILS A2.1 A2.1 A2.1 A4.2 +1056.65 F.F.E. +1056.75 F.F.E. +1056.75 F.F.E. +1056.69 F.F.E. +1056.75 F.F.E. CUSTOMER AREA SALES AREA KITCHEN UTIL. 3'-0" TOILET STAIR 2 STAIR 1 CORRIDOR 1 TOILET ELEV.
NEW BAR TOP SEATING. SEE MILLWORK DETAIL 8/A4.3 5'-0" LINE OF EXISTING BEAM AT CEILING ABOVE, TYP.
MILLWORK.
DETAIL ON SHEET A4.3. EXISTING
HARDWARE TO REMAIN 102 103
FLOOR
BUILT-IN BOOTH SEATING BY
SEE
DOOR & DOOR
18'-51 4 " 11'-73 4 12'-43 4 5'-3" 8'-3 1 2 " 6'-3" 6'-10 1 2 16'-8" R1'-6" 9'-0" 21'-6" 2'-1 1 2
A4.3 3 A4.3 8 A4.3
INTERIOR ELEVATION PAINT TRIM, PIN MOUNTED LOGO SIGN BY SIGN VENDOR. COORDINATE W/ OWNER
NON-ILLUM. TENANT SIGNAGE ON EXTG.SIGN BAND TO BE PROVIDED & INSTALLED BY SIGN MANUF. 6292022 12'-9" 11'-4" PROVIDE & INSTALL NEW ACCESSIBLE EXIT DOOR AS SCHEDULED PROVIDE & INSTALL WALL SCONCES AS SCHEDULED PROVIDE & INSTALL NEW CHANDELIERS AS SCHEDULED, TYP. VERIFY FIXTURE HEIGHT WITH OWNER B.O. EXISTING BEAMS @ 11'-4" A.F.F. (VERIFY) B-1 ELEVATION CUT SHOWN AT SUSPENDED SOFFIT FEATURE PIN MOUNTED LOGO SIGN BY SIGN VENDOR. COORDINATE W/ OWNER CUSTOMER BAR BY MILLWORK. SEE DETAIL ON SHEET A4.2. SUSPENDED SOFFIT FEATURE FINISHED IN WOOD TO MATCH FRONTLINE MILLWORK. PT-1 PT-1 INTERIOR ELEVATION 1/4" = 1'-0" INTERIOR ELEVATION 1/4" = 1'-0" INTERIOR ELEVATION 9'-6" B-1 PT-3 PAINT TRIM, MOULDING, TYP. 6292022
12'-9" PROVIDE & INSTALL NEW LIGHTS AT SUSPENDED SOFFIT ELEVATION CUT SHOWN AT SUSPENDED SOFFIT FEATURE INSTALL NEW CHANDELIERS HEIGHT WITH OWNER INTERIOR ELEVATION MTL-1 6292022 3'-6" 7'-10" 1'-5" 12'-9" 11'-4" 3'-0" 8'-6" ELEVATION CUT SHOWN AT SUSPENDED SOFFIT FEATURE 4 INTERIOR ELEVATION 1/4" = 1'-0" B-3 DISPLAY SHELVING AT BACK BAR MTL-2 CS-2 PL-1 PL-1 WT-1 WT-1 6292022
PROFESSIONAL Page Number 64 PROFESSIONAL JAYITA SHETTY JAYITA SHETTY Page Number 63 842 SALES AREA +36" A.F.F. CS-01 4" BACKSPLASH ALONG BACK OF 42" TALL KNEE WALL 4" BACKSPLASH AT COUNTERS ALONG WALLS IN SALES AREA, TYP. CS-01 CS-01 PAINT
OF KNEE WALL WD-2 FRP PLAM. WRAPPED PLYWOOD ALL INTERIOR SIDES OF BACK SALES AREA MILLWORK, TYP. PROVIDE WD-2 AT VISIBLE SURFACES. PL-1 7'-61 2 4" 16'-9 1 4 3'-10" 3'-13 4 " 3'-134 10" OPEN BELOW COFFEE BAR SEATING. PROVIDE AND INSTALL SUPPORT COUNTERTOP W/ BRACKETS PER MANUF., TYP. 1 ENLARGED MILLWORK PLAN - SALES COUNTER 3/4" = 1'-0" +36" A.F.F. +34" A.F.F. +42" A.F.F. +42" A.F.F. +42" A.F.F. +36" A.F.F. CS-01 4'-7" 2'-0" 2'-10" CS-01 CS-01 CS-01 2'-6" (OPEN) 4'-1 1 4 +36" A.F.F. CS-01 +36" A.F.F. CS-01 1'-7 3 4 3'-1 1 2 7'-3 3 4 4'-1 1 4 " (LOW COUNTER) 8'-5 1 4 CS-01 CS-01 ACCESSIBLE HEIGHT MILLWORK POINT OF SALES SALES REGISTER 42" TALL PARTIAL HEIGHT WALL / LEDGE AT CUSTOMER SIDE OF ESPRESSO BAR VERIFY WIDTH / CLEARANCE IS PROVIDED FOR U.C. EQUIPMENT. VERIFY CLEARANCES W/ EQUIPMENT SPECS, TYP. +24" A.F.F. CS-01 +36" A.F.F. CS-01 +36" A.F.F. CS-01 +42" A.F.F. CS-01 +36" A.F.F. CS-01 4'-7" 5'-4 1 4 5'-10" (ADA COUNTER) 3'-2 3 4 " (OPEN) 5" 1" 1'-8" 1'-6" 6" 1'-1" 2'-10" 2'-4" 5" 2'-3" 1" 5" 3 A4.2 A2.1 4 3 A2.1 7 6 A4.2 6 A4.3 5 A4.3 9 A4.3 8 A4.2 7 A4.2 6 A4.3 4 A4.2 4 A4.2 1 2 A2.1 9 24" TALL BACK COUNTER AT COFFEE EQUIPMENT, TYP. LINE OF SALES SOFFIT FEATURE SHOWN DASHED ABOVE R3'-7" R3'-7" R1'-0" R1'-0" 1'-7" 6" 6" LINE OF EXISTING BEAM ABOVE SHOWN DASHED, TYP. X2 51 2 " LINE OF WALL SHELVING ABOVE LEAVE OPEN UNDER COUNTER FOR ADA 'T-TURN' AROUND CLEARANCE 4 A4.2 SEE SHEET A4.3 FOR CONDIMENT STATION MILLWORK DETAIL A4.2 2 WD-2 135° +34" A.F.F. CS-01 1'-4 1 2 2'-3" 2" PROVIDE WOOD TRIM (TO MATCH EXISTING) ON TOP OF NEW FURRED OUT WALL AT LOCATIONS OF EXISTING COLUMNS. PAINT PT-3, TYP. X2 PROVIDE BRASS SCHLUTER STRIP AT CORNER TRANSITIONS WHERE WT-1 FINISH OCCURS, TYP. MTL-1 3 A4.2 7 A4.3 5 A4.3 10 A4.3 6292022 4 SECTION AT OPEN WORK COUNTER, TYP. 1"=1'-0" CS-1 SEE PLANS FINISH ALL EXPOSED EDGES COUNTERTOP w/ TYPICAL BULLNOSE EDGE OF SURROUNDING CABINET WD-2 3" 6" 36" WALL 2 SECTION @ TRASH RECEPTACLE 1"=1'-0" 1 1 2 6" SEE PLANS CS-1 WD-2 3/4" WATER RESISTANT PLYWOOD, TYP. W/ PLAM AT INTERIOR SURFACES PROVIDE FULL OVERLAY DOORS w/ CONCEALED EUROPEAN STYLE HINGES. EXTERIOR OF CABINET AND DOORS TO BE WD-2 FINISH PL-1 B-2 34" WALL B-3 B-3 6292022 HEIGHT WALL / LEDGE 13" 7 SECTION AT FRONT BAR COUNTER 1"=1'-0" 6" 3" 19" SATIN BRASS PURSE HOOK MOUNTED IN RECESS, TO BE INSTALLED INVERSELY. PROVIDE BLOCKING IF/AS NECESSARY PROVIDE WOOD FINISH WD-2 ON CUSTOMER SIDE OF MILLWORK B-2 20" 36" 42" 18" PL. LAM. PL-1 19" SATIN BRASS PURSE HOOK MOUNTED IN RECESS, TO BE INSTALLED INVERSELY. PROVIDE BLOCKING IF/AS NECESSARY PROVIDE WOOD FINISH WD-2 ON CUSTOMER SIDE OF MILLWORK B-2 36" 42" 8 SECTION AT FRONT BAR COUNTER 1"=1'-0" ICE STORAGE BIN SHOWN IN DOTTED 20" 13" 18" 6" B-3 BACK SPLASH TO MATCH COUNTER CS-1 3/4" X 3/4" X 1/8" CONT. STEEL ANGLE FRAME. IF AS NEEDED 3/4" THK. TYP. SHELF SUPPORT BACK SPLASH TO MATCH COUNTER WD-2 WD-2 PL. LAM. PL-1 629 6" 6" WD-2 BARSINK/HANDSINK SEE PLANS 2 X 4 PRESSURE TREATED BLOCKING-TYPICAL EXTEND FLR/BASE INTO CABINET. B-3 WALL 4" TALL BACK SPLASH TO MATCH COUNTER PROVIDE OPENING AT CABINET BASE FOR ROUTING INDIRECT WASTE TO FLOOR SINK LOCATED UNDER MILLWORK 6 SECTION AT SINK, TYP. 1"=1'-0" 6" 3 SECTION AT P.O.S. 1"=1'-0" SEE PLANS 34" ADJUSTABLE SHELF SEAL ALL INTERIOR SILICONE CAULK CORNERS W/ PL. LAM. PL-1 CASH DRAWER CS-1 COUNTERTOP PAINT GRADE WOOD PROVIDE 2" PLASTIC GROMMET FOR WIRE ROUTING. INSTALL IN FIELD PER TENANT DIRECTION SOLID SURFACE COUNTERTOP NOSING w/ TYP. BULLNOSE. EXTEND BULLNOSE TO 2" TO COVER TILE EVENLY. FINISH COUNTERS W/ KNEE WALL AT FRONTLINE SALES COUNTER/MILLWORK FINISH W/ WD-2 CS-1 B-3 B-2 36" PL. LAM. PL-1 2 DINING BOOTH MILLWORK DETAIL 1"=1'-0" VERIFY W/ PLAN 6" 18" 2" 36" 36" 95°MIN 24" CHESTERFIELD-STYLE TUFTED DINING BOOTH SINGLE HORIZONTAL CHANNEL TUFT SOLID WOOD WD-03 TOEKICK AT BOOTH MILLWORK WD-2 TIGHT FULLY UPHOLSTERED BANQUETTE SEAT AND BACK W/ TUFTING OVER FIRE RETARDENT MEDIUM DENSITY FOAM WITH DACRON WRAP. SEAT TO CROWN SLIGHTLY AND HAVE MEDIUM SIT. 21" 6292022 9 SECTION AT FRONT COUNTER VOID 1"=1'-0" SEE PLANS KNEE WALL AT FRONTLINE SALES COUNTER/MILLWORK FINISH W/ WD-2 CS-1 PL. LAM. PL-1 28" B-2 3 5/8" STUD WALL BACK SPLASH TO MATCH COUNTER 6292022 6 TYP. SECTION AT U.C. EQUIPMENT 1"=1'-0" CS-1 SEE PLANS REFRIGERATOR SHOWN DASHED 3/4" 3/4" X 1/8" CONT. STEEL ANGLE FRAME. IF AS NEEDED FINISH ALL EXPOSED EDGES COUNTERTOP w/ TYPICAL BULLNOSE EDGE OF SURROUNDING CABINET 3/4" THK. TYP. SHELF SUPPORT WD-2 6" WALL NOTE: EQUIPMENT VARIES BASED ON LOCATION REFER TO ENLARGED MILLWORK PLAN (A4.1) 36" 4" TALL BACK SPLASH TO MATCH COUNTER 6292022
GRADE WOOD ON CUSTOMER SIDE AND FRP ON EMPLOYEE SIDE