5 minute read
KORAPUT SPORTS COMPLEX
SPORTS COMPLEX, ODISHA, INDIA
Team: Jayita Shetty, Shreshtha Malhotra, Vishal
Advertisement
The intend of the building is to extend the program. Displaying art from static to performing stage. Thus the extension of program was achieved to be a catalyst for inside –out relation and revive the lost essence of the arcade corridor.
The design is governed by the geometry of the space in which the central stage plays an important role in engaging the public spaces with the private or the outside to of central stage with seating through the entire circumference of the circular stage.
The intend of the building the program. Displaying to performing stage. Thus of program was achieved to for inside –out relation and lost essence of the arcade
The design is governed by of the space in which the central an important role in engaging spaces with the private or of central stage with seating entire circumference of the
PLAN - RECREATIONAL BUILDING
The public corridors are the highlight of the design. The open spaces in the center of the project in connectes to the buildign corridrors od the building.

The different sections in the building would connect to the courtyard and stadium on the other side with a large double height lobby overseeing the other spaces of the building. The building also has stay rooms and indoor courts. The stadium level connects to the cafe opening for public engagement.


* 3D view credits : Shreshtha

The intend the program. to performing of program for inside lost essence
The intend the program. to performing of program for inside lost essence
The intend the program. to performing of program for inside lost essence
The design of the space an important spaces with of central entire circumference
The design of the space an important spaces with of central entire circumference
The design of the space an important spaces with of central entire circumference



* 3D view credits : Shreshtha an important role in engaging the public spaces with the private or the outside to of central stage with seating through the entire circumference of the circular stage.







ADANI - COMMERCIAL OFFICE
Team: Gaurav Manjrekar, Jayita Shetty, Vandita Kedia
Interior project for commercial building in Ahmedabad. The different levels with different functionalities. The deisgn inspiration was to have an open office system with intersecting meeting spaces in intervals on the floor plan on every level







Entrance Lobby Spaces And Corridors


The lobby area leads to the central circular space with digital screen on it, this space acts as a buffer between the common spaces and other programs in the office. The spaces at level 1 are mostly common kitchen and cafeteria for the staff members.





Office And Common Spaces


The 4th floor, last level of the building has offices for executive and chief of staff of the company. The entrance at this floor has a featured bamboo garden. It also has a landscape area outside at he terrace level for social events and gstherings.







Porterdale Lofts
Team: Max Boston, Jayita Shetty
(ACCESSIBLE)
LIGHTING
PROVIDE & INSTALL NEW PENDANT LIGHT FIXTURES TO MATCH EXTG AS SCHEDULED, TYP.
EXISTING HVAC DUCTWORK TO REMAIN TO THE GREATEST EXTENT POSSIBLE.REWORK EXISTING /PROVIDE NEW PORTIONS OF DUCT IF/AS NEEDED. MATCH EXISTING METAL SPIRAL DUCTWORK, TYP. IN AREAS WHERE CEILINGS ARE OPEN TO ABOVE
EXISTING EXHAUST / DIFFUSERS TO REMAIN
INSTALL NEW RECESSED DOWNLIGHT FIXTURE AS SCHEDULED
INSTALL NEW FIXTURE AS SCHEDULED
EXISTING SPRINKLERS REMAIN, TYP.VERFIY LOCATION AND RELOCATE IF/AS REQUIRED.
EXISTING WALL LIGHTS TO REMAIN, TYP. EXISTING MIN. 8"X8" GRIDER BEAMS AND 4" MIN. THICK CONCRETE FLOOR/CEILING ASSEMBLY TO REMAIN, TYP. VERIFY EXISTING ASSEMBLY PROVIDES MIN. 1-HR RATING IN COMPLIANCE WITH IBC TABLE 722.2.2.1. G.C. TO MAINTAIN EXISTING RATING, TYP.
EXISTING LIGHTING LAYOUT TO REMAIN TO THE GREATEST EXTENT POSSIBLE. PROVIDE COST/BID FOR COST TO REPLACE EXISTING FIXTURES WITH NEW AS SCHEDULED.
1 1 1 OFFICE
S S
EXISTING HVAC DUCTWORK TO REMAIN TO THE GREATEST EXTENT POSSIBLE.REWORK EXISTING/ PROVIDE NEW PORTIONS OF DUCT IF/AS NEEDED. MATCH EXISTING METAL SPIRAL DUCTWORK, TYP. IN AREAS WHERE CEILINGS ARE OPEN TO ABOVE
S S SUITE 2114 SUITE 2110
S
PROVIDE AND INSTALL NEW CEILING DIFFUSERS AND EXHAUST FAN IN TOILET ROOM
INSTALL NEW FIXTURE AS SCHEDULED
LIGHTING BEDROOM BATH BATH W.I.C. LIVING/DINING LIVING/DINING BEDROOM CL-1 PT-2 CL-1 | PT-2 CL-1 PT-2 GYP PT-1 GYP PT-1 CL-1 PT-2 CL-1 PT-2 CL-2 | PT-1 CL-1 PT-2 CL-1 PT-2 CL-1 PT-2 L-1 L-1 L-1 L-1 L-1 L-1 L-1 L-1 L-1 L-1 L-1 L-1 L-1 L-1 L-1 L-1 L-1 L-1 L-1 L-1 L-1 L-2 L-2 L-3 L-1 L-3 L-3 L-4 L-4 L-5 L-5 L-6 L-6 L-6 L-6 L-6 L-6 L-6 L-6 L-6 L-6 L-6 10' - 7.75" A.F.F. B.O. SPRINKLER ( VERIFY LOCATION) 11' 10" A.F.F. EXISTING VERIFY 11' - 10" A.F.F. EXISTING VERIFY 7' 11" A.F.F. EXISTING VERIFY ASTERISK " * LINE CEILING AS TYP. FLOOR/CEILING KITCHEN KITCHEN 11' 7" A.F.F. 7' - 2" A.F.F. 10' 4" A.F.F. EXISTING VERIFY 8' - 9" A.F.F. B.O. DUCTWORK EXISTING VERIFY 10' 9" A.F.F. B.O. BEAM LOCATIONS ACCOMODATE PER GREATEST NEW 2 2 2 3 3 TO ADJUST LAYOUT. MATCH TO CONDITION. 4 4 1 1 GYP PT-1 2 2 11' 7" A.F.F. EXISTING VERIFY 10' - 4" A.F.F. EXISTING VERIFY L-1 L-4 L-6 CL-1 PT-2 CL-1 PT-2 LINE OF EXISTING SOFFIT (B.O. GYP. @ 10'-4" A.F.F.) TO REMAIN. VERIFY HEIGHT IN FIELD, TYP. 11' 7" A.F.F. EXISTING VERIFY EXISTING MIN. 8"X8" GRIDER BEAMS AND 4" MIN. THICK CONCRETE FLOOR/CEILING ASSEMBLY TO REMAIN, TYP. VERIFY EXISTING new non-load bearing interior partition walls and doors as scheduled. New interior millwork and floor, ceiling, and wall finishes was provided & installed as scheduled. BACK-UP
EXISTING SPRINKLERS REMAIN, TYP.VERFIY LOCATION AND RELOCATE IF/AS REQUIRED.
EXISTING WALL LIGHTS TO REMAIN, TYP. 1'-0" 1'-0" 24'-1" 24'-2" 11'-9 1 2 " 5'-0" 29'-4" 7'-6" 14'-1" 6'-0 1 2 14'-9 1 2 20'-2" 4'-2" 31'-0 1 2 6'-3 1 2 3'-8 1 2 14'-9 1 2 4'-7" 2'-11" 12'-10" 15'-9" 7'-111 2 7'-3" 5'-0" 2'-4" 4'-11 1 2 " 2'-4" 15'-11 1 2 " 28'-8 1 2 " 14'-9 1 2 " 11'-91 2 4'-6 1 2 " 12'-0" 4'-51 2 6'-91 2 11'-91 2 PROVIDE & INSTALL HARD WIRED SMOKE DETECTORS. LOCATE INSIDE BEDROOM(S) AND OUTSIDE BEDROOM(S) (WITHIN 10'-0") IN ACCORDANCE W/ NEC, TYP. DETECTOR PORTERDALE MILL LOFTS 2100 MAIN ST, UNITS 2110 & 2114 PORTERDALE, GA 30014 12-01-2022 830 GLENWOOD AVE SE SUITE 510-248 ATLANTA, GA 30316 TEL. 404/584-1680 12012022 RELEASED FOR CONSTRUCTION REVISION DATE TAP DESIGN GROUP 830 GLENWOOD AVE. SE SUITE 510-248 ATLANTA, GA 30316 TEL. 404/584-1680 Reflected Ceiling Plan A2 7'-2" (VERIFY EXTG.) 1 INTERIOR ELEVATION 1/2" = 1'-0" 2'-10" B-1 NEW 5 8" GYP. BOARD DROP CEILING - MAINTAIN EXISTING HEIGHT FOR EXTG LOCATED AHU ABOVE CEILING. WT-2 SUBWAY TILE SURROUND ON ALL THREE SIDES, TYP. WT-2 16 15 PROVIDE BLOCKING IN WALL FOR FUTURE GRAB BARS IF/AS NEEDED, TYP. PROVIDE ST.STEEL SCHLUTER STRIP OR BULLNOSE TILE @ EDGE OF TILE,TYP PROVIDE BLOCKING IN WALL FOR MIRROR IF/AS NEEDED, TYP. 13 17 PORTERDALE MILL LOFTS UNITS 2110 & 2114 PORTERDALE, GA 30014 12-01-2022 12012022 REVISION DATE 404/584-1680 7'-11"(VERIFY EXTG.) 2 INTERIOR ELEVATION 1/2" = 1'-0" 3'-0" 14 16 15 PROVIDE ST.STEEL SCHLUTER STRIP OR BULLNOSE TILE @ EDGE OF TILE,TYP WT-2 B-1 WT-2 SUBWAY TILE SURROUND ON ALL THREE SIDES, TYP. PROVIDE BLOCKING IN WALL FOR MIRROR IF/AS NEEDED, TYP. 18 13 PORTERDALE MILL LOFTS UNITS 2110 & 2114 PORTERDALE, GA 30014 12-01-2022 12012022 REVISION DATE 404/584-1680
EXISTING LIGHTING LAYOUT TO REMAIN TO THE GREATEST EXTENT POSSIBLE. PROVIDE COST/BID FOR COST TO REPLACE EXISTING FIXTURES WITH NEW AS SCHEDULED.