Vetus diesel engines VF4.145_VF4.180_VF4.200 EN Operation manual - PDF DOWNLOAD

Page 76

7 Lay-up / Winter storage procedure

In case of lay-up for a long period the storage procedures as described in this chapter should be carried out.

The engine should be inspected at the start of the storage period and any necessary repairs should be carried out.

A long period means a period longer than 3 months, for example, during the winter period.

Consult a Vetus Dealer if help is required with this.

Make sure that the engine compartment is well ventilated during the winter period. Good ventilation prevents damp in the engine compartment, thus preventing corrosion of the engine from occurring.

74

Inspections and maintenance work to be carried out are:


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Vetus diesel engines VF4.145_VF4.180_VF4.200 EN Operation manual - PDF DOWNLOAD by www.heydownloads.com - Issuu