5 minute read

Adjustment Value Table

Next Article
Error Message

Error Message

Adjustment Value Table

Specification No. : GR-700E-1-00101

Specification No. : GR-700E-1-00102

AML model : AML-L B

AML code No. : 361-915-70000

AML code No. : 361-920-20000

1. Setting before adjustment

2. Adjustment the detector

Precautions for adjustment

(*1) Adjust the center of dispersion to coincide to the adjusting value.

(*2) Adjust the boom angle and the moment in the elevating lowering operation.

(*3) Adjust the swing angle in the clockwise swing operation.

(*4) When adjusting the moment, make the number of part-lines of rope to the standard number (four part-lines) that is when boom fully extended, and set the AML as Boom status: Boom and Number of part-lines of rope:4.

1 :The adjusting value is for 0.47 ton hook installed, and the value in the { } is for 0.85 ton hook installed.

Adjustment Value Table

Fully extended

MDT (Multiplex Data Transmitter) Input/O utput Nos. and Corresponding Signals

MDT (Multiplex Data Transmitter) Input/Output Nos. and Corresponding Signals

The following table does not apply to a machine that is not equipped with a multiplex data transmitter (that is, GT-550E-1 model).

Checkin g the Detectors ( GT-550E-1 )

Checking the Detectors (GT-550E-1)

1. Boom Length Detector

1. Retract the boom fully, set the boom angle to 0 degree and turn off the PTO switch.

2. Measure resistance of the potentiometer.

Checking at the connector of the detector Pull out the connector of the detector and measure resistance of the potentiometer. The specified resistance values are as follows:

C-D:833 ± 167Ω

B-D:458 ± 92

Checking at the CN1 connector of the AML Pull out the connector of the swing angle detector. Then pull out the CN1 connector and measure resistance of the potentiometer. The specified resistance values are as follows: 2-1:833 ± 167Ω 3-1:458 ± 92Ω

2. Boom Angle Detector

1. Retract the boom fully, set the boom angle to 0 degree and turn off the PTO switch.

2. Measure resistance of the potentiometer.

Checking at the connector of the detector Pull out the connector of the detector and measure resistance of the potentiometer. The specified resistance values are as follows:

C-D:833 ± 167Ω

A-D:146 ± 29Ω

Checking at the CN1 connector of the AML Pull out the connector of the swing angle detector. Then pull out the CN1 connector and measure resistance of the potentiometer. The specified resistance values are as follows:

2-1:833 ± 167Ω

4-1:146 ± 29Ω

Checkin g the Detectors ( GT-550E-1 )

3. Swing Angle Detector

1. Swing the boom to over-left and turn off the PTO switch.

2. Measure resistance of the potentiometer.

Checking at the connector of the detector

Pull out the connector of the detector and measure resistance of the potentiometer. The specified resistance values are as follows:

R-B:500 ± 75

Checking at the CN1 connector of the AML

Pull out the connector of the boom length and angle detector. Then pull out the CN1 connector and measure resistance of the potentiometer. The specified resistance values are as follows:

2-1:500 ± 75Ω

5-1:0 - 15Ω

4. Outrigger Extension Width Detector

1. Stow the outriggers and disengage the PTO.

2. Remove the wire for the detector from the outrigger and hold the wire, letting it protruding by 80mm from the guide hold of the detector.

1

3. Pull out the connector of the detector and measure resistance of the potentiometer. The specified resistance values are as follows:

± 100Ω

± 30

Checkin g the Detectors ( GT-550E-1 )

5. Pressure Sensor for Moment Detection

1. Engage the PTO. (5-V DC will be applied between R and B of the pressure sensor connector.)

2. Measure the output voltage between W and B of the pressure sensor connector.

3. The output voltage between W and B is proportional to the pressure in the elevating cylinder.

The specified value is as shown below.

Checking the Detectors (GR-120N-1/GR-700EXL-1)

Checking the Detectors (GR-120N-1)

1. Boom Length Detector

1. Retract the boom fully, set the boom angle to 0 degree and turn off the PTO switch.

2. Measure resistance of the potentiometer.

Checking at the connector of the detector

Pull out the connector of the detector and measure resistance of the potentiometer. The specified resistance values are as follows:

C-D:833 ± 167Ω

B-D:458 ± 92Ω

Checking at the CN1 connector of the AML

Pull out the connector of the swing angle detector. Then pull out the CN1 connector and measure resistance of the potentiometer. The specified resistance values are as follows:

2-1:833 ± 167Ω

3-1:458 ± 92Ω

2. Boom Angle Detector

1. Retract the boom fully, set the boom angle to 0 degree and turn off the PTO switch.

2. Measure resistance of the potentiometer. Checking at the connector of the detector Pull out the connector of the detector and measure resistance of the potentiometer. The specified resistance values are as follows:

C-D:833 ± 167Ω

A-D:146 ± 29Ω

Checking at the CN1 connector of the AML Pull out the connector of the swing angle detector. Then pull out the CN1 connector and measure resistance of the potentiometer. The specified resistance values are as follows:

2-1:833 ± 167Ω

4-1:146 ± 29Ω

Checking the Detectors (GR-120N-1/GR-700EXL-1)

3. Swing Angle Detector

1. Swing the boom to over-left and turn off the PTO switch.

2. Measure resistance of the potentiometer. Checking at the connector of the detector Pull out the connector of the detector and measure resistance of the potentiometer. The specified resistance values are as follows: R-B:500

4. Outrigger Extension Width Detector

1. Stow the outriggers and turn the starter switch to OFF.

2. Remove the wire for the detector from the outrigger and hold the wire, letting it protruding by 80mm from the guide hold of the detector.

Checking at the CN1 connector of the AML Pull out the connector of the boom length and angle detector. Then pull out the CN1 connector and measure resistance of the potentiometer. The specified resistance values are as follows:

2-1:500 ± 75Ω 5-1:0 -

3. Pull out the connector of the detector and measure resistance of the potentiometer. The specified resistance values are as follows: R-B:2000 ± 100Ω

± 30Ω

5. Pressure Sensor for Moment Detection

1. Turn ON the PTO switch. (5-V DC will be applied between R and B of the pressure sensor connector.)

2. Measure the output voltage between W and B of the pressure sensor connector.

WBR

DET3SRC 33 ANAING 34 DET3GND 32

SPS3 (ANAINH 35) (SPS4)

R W B

IW301-0131E14

3. The output voltage between W and B is proportional to the pressure in the elevating cylinder.

The specified value is as shown below.

Fuses

MAIN fuse (3A)

AML main fuse for whole unit.

RLY1,2 fuse (3A)

Common, with relay output 1 and 2.

RLY3,4 fuse (3A)

Common, with relay output 3 and 4.

RLY5,6 fuse (3A)

Common, with relay output 5 and 6.

RLY7,8 fuse (3A)

Common, with relay output 7 and 8.

SIF1 fuse (2A)

For SIF1SRC power supply output.

SIF2 fuse (2A)

For SIF2SRC power supply output.

Fuses

SOL1,2 fuse (2A)

Common, with current output 1 and 2.

SOL3,4 fuse (2A)

Common, with current output 3 and 4.

SOL5,6 fuse (2A)

Common, with current output 5 and 6.

Replacing the Clock Battery

Replacing the Clock Battery

[NOTICE]

When the clock battery is worn out, the adjusting values, error codes and driving history cannot be backed up (saving data at power OFF). Also, when the error code or driving history is recorded in AML, an accurate date and time cannot be recorded.

Two built-in clock batteries are on CPU board of the AML main unit. Replace both 2 pieces when you replace the battery.

The built-in clock battery longevity is usually about 10 years.

If the built-in clock batteries are worn out, replace them according to the following procedures.

1. Remove the CPU board from the AML main unit.

2. Remove the battery from the battery holder on CPU board by pressing the battery diagonally.

[NOTICE]

When removing the battery, remove while holding the battery upper (positive side) because the battery may pop up.

3. Attach a new battery on the CPU board by pressing the battery diagonally. (Refer to the figure below)

The battery positive side must be faced up.

4. Install the CPU board in the AML main unit.

5. Reconnect the connector to the board.

This article is from: