
1 minute read
Input/Output Signals of the AML (AML-L B) System (GR-120N-1)
CN3 connector signals and functions are shown below:
CN 3 connector
Pin No. Name
1 TR1
2 TR2
3 TR3
4 TR4
Signal names and functions
Signal name: AML 90% or less (safety) output
OC (Open collector) output turns ON when the moment ratio is less than 90%.
OC output “ON” (DC0V): External indicator lamp indicating 90% is lit.
OC output “OFF” (DC24V): External indicator lamp indicating 90% goes out.
While the boom lift with the jib mounted is performed, OC output turns ON when the moment ratio is 80% or less.
When the jib set pin is out of inserted condition, the AML assumes that the jib is mounted.
Signal name: AML 90% alarm output
OC (Open collector) output turns ON when the moment ratio is between 90% and 100%.
OC output “ON” (DC0V): External indicator lamp indicating 90% is lit.
OC output “OFF” (DC24V): External indicator lamp indicating 90% goes out.
While the boom lift with the jib mounted is performed, OC output turns ON when the moment ratio reaches the range below:
80% Moment ratio < 90%
When the jib set pin is out of inserted condition, the AML assumes that the jib is mounted.
Signal name: AML 100% alarm output
OC (Open collector) output turns ON when the moment ratio exceeds 100% or automatic stop function is cancelled.
OC output “ON” (DC0V): External indicator lamp indicating 100% is lit.
OC output “OFF” (DC24V): External indicator lamp indicating 100% goes out. Condition to turn ON OC output
Moment ratio 100%
While the boom lift with the jib mounted is performed, OC output turns ON when the moment ratio reaches the range below:
Moment ratio 90%
When the jib set pin is out of inserted condition, the AML assumes that the jib is mounted.
Overwind cutout disable switch: Pressed
Swing stop/override switch: “OVERRIDE”
AML emergency switch: “Emergency” + PTO switch: “OVERRIDE”
Signal name: Auxiliary winch high-speed hoist-down operation output
OC (Open collector) output turns ON when the auxiliary winch hoist-down operation is detected with the actual load less than the specified value (200kg).
High-speed hoist-down operation is performed when the auxiliary winch high-speed down hoisting switch is set to ON.
OC output ON (DC0V): High-speed hoist-down operation is performed.
OC output OFF (DC24V): Normal hoist-down operation is performed.