Swing-away lattice 5.3 Checklists for rigging work
22. Position the hoist rope;
à p. 5 - 104.
à p. 5 - 63.
01.07.2017
23. Perform all further rigging work;
5 - 44
3 302 624 en
Lattice extension operating manual GMK5150 / GMK5150L
Swing-away lattice 5.3 Checklists for rigging work
22. Position the hoist rope;
à p. 5 - 104.
à p. 5 - 63.
01.07.2017
23. Perform all further rigging work;
5 - 44
3 302 624 en
Lattice extension operating manual GMK5150 / GMK5150L