
21 minute read
About these operating instructions
1.1 Validity
Validity of these operating instructions
This operating manual applies only to lattice extensions supplied by Manitowoc Crane Group Germany GmbH
In addition, for the operation of the truck crane with a lattice extension described in these operating instructions, all information in the Operating Instructions GMK5150 / GMK5150L, supplied by the factory for the lattice extensions is applicable.
Prerequisites for installation and operation
The lattice extensions described in this operating manual may only be operated together with a GROVE truck crane GMK5150 / GMK5150L whose serial number is identical with the serial number marked on the lattice extensions.
References to other operating manuals
Cross references to other operating or maintenance manuals are shown for instance in the following form: à GMK5150 / GMK5150L Operating Instructions.
The subject that is referenced can be found in the index or table of contents of the document to which reference is made.
1.2 Terms used
An overview of the lattice extensions described in this operating manual is provided below.
1 Section 5 for the boom extension
2 Section 3 for the swing-away lattice in combination C Swing-away lattice in 3 designs with:
3.1 Integrated heavy load lattice extension (ISS) or
3.2 Swing-away lattice or
3.3 Inclinable swing-away lattice
4 Heavy load lattice extension
5 Integrated heavy load lattice extension
6 Auxiliary single-sheave boom top 1
7 Auxiliary single-sheave boom top 2
2Basic safety instructions
2.1 Other applicable documents
2
Basic safety instructions
In principle, all the basic safety instructions from the GMK5150 / GMK5150L Operating Instructions are applicable.
Observe also all safety instructions and warnings on the truck crane!
HInformation regarding the warnings and symbols used; à GMK5150 / GMK5150L Operating Instructions
2.1 Other applicable documents
In addition to the information in this operating manual, all the instructions in the following sections of the supplied GMK5150 / GMK5150L Operating Instructions are also applicable:
–Intended use
–Improper use
–Organisational measures
–Personnel qualifications GMK5150 / GMK5150L
2.2 Safety instructions for working with a lattice extension
2.2 Safety instructions for working with a lattice extension
This chapter contains additional safety instructions only for safe use of the lattice extensions described in these operating instructions.
Working at heights
If there is a danger of falling when doing work on the truck crane, suitable equipment must be used to prevent falling (e.g. ladder, lifting platform, auxiliary crane).
The lattice extensions are provided with clamps for positioning a ladder. Place the ladder between the clamps so it cannot slip off.
If despite using such equipment the risk of falling cannot be minimised you must protect yourself and any assisting personnel by using fall arrest systems.
The points at which the fall arrest system can be attached to on the truck crane are indicated by the symbol shown here.
Slinging
Attach slings to the sections only at the designated slinging points. If no slinging points are provided, refer to the centre of gravity data.
In this way you prevent the attached sections slipping off, falling and causing injury during installation or removal.
Retainers
Always secure the pins at the connection points and also at the holders using the appropriate locks. This prevents unsecured pins coming loose, falling out and causing injuries.
Rigging mode
For crane operation with the lattice extension folded away, comply with the rigging mode. This will prevent damage to the main or lattice extension, and prevent the lattice extension falling during crane operation.
For on-road driving with the lattice extension, comply with the rigging mode. This prevents the permissible vehicle width or height being exceeded.
Two cranes
Lifting loads simultaneously with two cranes is particularly dangerous. Carry out this type of work with special care.
3Operating elements
3
Operating elements
This section describes all the lattice extension operating elements that are not described, or are merely referenced in the GMK5150 / GMK5150L Operating Instructions supplied.
3.1 On the lattice extension
3.1.1
3.1.2 Connection section 1 - section 2
The connection is established using the pins (1) to (4). The pins are inserted into connecting points or holders, depending on whether section 1 is folded in or folded in front of section 2.
3.1.3
Folded connection
In the illustrated position of the lever (1), section 1 and section 2 are
(A) connected.
(B) not connected.
3.1.4 Front connection
There are 3 positions for the Front connection.
A Locked position
B Rigging position
C Unlocked position
The positions are set using the lever (2).
The swing-away lattice is secured using the pin (1).
3.1.5 Middle 2 connection
Only for swing-away lattice with ISS.
(A) – Establishing the connection
Turn the hand lever (1) clockwise. The locking bar (2) is pressed upwards by the spring force.
(B) – Disconnecting the connection
Pull the hand lever (1) downwards against the spring force and then turn anticlockwise.
3.1.6 Middle 1 connection
(A) – Establishing the connection
When section 1 is folded in, the pin (1) is inserted into the connecting points (2).
(B) – Disconnecting the connection
When the connection is separated, the pin (1) is inserted into the connecting points (3).
3.1.7 Run-up rail
(A) – The run-up rail is folded out for rigging. The swing-away lattice rolls up to the main boom on the run-up rail during rigging.
(B) – The run-up rail is folded onto the main boom for on-road driving.
3.1.8 Rear connection
(A) – Establishing the connection
Extend the pin (1).
(B) – Disconnecting the connection
Retract the pin (1).
The pin (1) is actuated using the control unit (2). The control unit is attached to the run-up rail.
Operating elements
3.1 On the lattice extension
3.1.9 Section2 control unit
Operating elements
1 Function buttons
Button combinations
There are two button combinations; buttons that are engaged are shown in black:
A Raise swing-away lattice
B Lower swing-away lattice
–Function on Press the required button combination.
–(C) – Function off Release one or both the buttons.
3.2 In the crane cab 3.2.1 Overview
3.2.2 On the CCS control unit
Lattice extension derricking gear display
– Green: Lattice extension derricking gear on
– Red: Lattice extension derricking gear off
Power unit speeds menu – inputting the speed – lattice extension derricking gear
The value (xx) indicates what percentage of the maximum speed is permitted. Change the value; à GMK5150 / GMK5150L Operating Instructions.
Operating hours menu – lattice extension derricking gear operating hours
The value indicates the Lattice extension derricking gear operating hours. Further information; à GMK5150 / GMK5150L Operating Instructions.
3.2.3 On the RCL control unit
Enter rigging mode menu
Monitoring menu
Boom system entry
1 Boom system selection
2 Main boom
3 Lattice extension
3.1Only during mechanical angle position setting: Angle
3.2 Length
Boom system display
1 Main boom display
2 Display for main boom with lattice extension
2.1 Angle
2.2 Length
3.2.4 At the control console, right
Derricking gear of lattice extension on/off
There is a lamp in the button.
– Press once: – Bright lamp – Lattice extension derricking gear on – Dim lamp – Lattice extension derricking gear off
Control lever configuration
– To the left: – Raise – Lift the lattice extension
– To the right – Lower – Lower lattice extension
3.3 On the hand-held control
This section is only valid for the derricking swing-away lattice. The operations are not monitored by the RCL.
The button (1) is active only when the swing-away lattice is electrically connected.
For operation, you must pre-select a function and then press the required combination of buttons.
Pre-selecting
–Lattice extension derricking gear: Press button (1) once – the lamp in the button lights up
The pre-selection remains in force until superseded by another pre-selection.
Function buttons
The operations are not monitored by the RCL. There are four button combinations; actuated buttons are shown in black:
–Pre-selected function on Press the required button combination.
–Pre-selected function off Release one or both the buttons. Press a non-assigned button combination –pre-selection off.
–Faster movement: Increase pressure on button
–Slower movement: Decrease pressure on button
Operating elements
3.3 On the hand-held control
Possible movements with pre-selection
Pre-selection
Button combination
Lower the lattice extension
Raise the lattice extension no function no function
3.3.1 Hand-held control connection
With the hand-held control
Derricking the swing-away lattice is enabled at the sockets (1) and (2).
Connection to the socket (2) is not suitable for rigging since you cannot see the folded swingaway lattice from this point.
The socket (2) is intended for emergency operation.
• Connect the hand-held control to the socket(1).
/ GMK5150L Operating Instructions.
3.4 Other operating elements
3.4.1 Rigging hook
You can also actuate various control elements on the swing-away lattice using the rigging hook (1).
The rigging hook is fastened in the holders (2).
4Rigging work on the main boom
Rigging work on the main boom
4.1 Hose drum
4
Rigging work on the main boom
4.1 Hose drum
The hydraulic supply to the luffing jib is provided via a hose drum on the side of the main boom.
4.1.1 Slinging points
• Attach the hose drum (1) at the points (2) using a strap sling of sufficient load bearing capacity.
4.1.2 Transport dimensions and weights
SRisk of damage to the hose drum! Always secure the hose drum by tying it down with suitable belts when it is transported on a separate vehicle. This prevents the hose drum tipping over and becoming damaged during transportation.
Rigging work on the main boom
4.2 Rigging work on the hose drum
4.2 Rigging work on the hose drum
4.2.1 Fitting/removing the hose drum
Installation For crane operation, if the hose drum is not already installed you must install it.
• Attach lifting gear to the hose drum (1); à Slinging points, p.4-1.
• (A) – Remove the pin (2) from the holder.
• (B) – Lift the hose drum (1) into the holder (4).
• Fasten the hose drum (1) to the holder (3) using the pin (2).
• Secure the pin.
• Connect the hoses (2) to the connections (1) (match the markings).
• Release the locking device (3); à p.4-5.
• Run the hoses (4) to the correct position for the desired operation; à p.4-6.
• Check the connections for leaks.
Rigging work on the main boom
4.2 Rigging work on the hose drum
Removing Depending on the driving mode it may be necessary to remove the hose drum before driving on the road; à GMK5150 / GMK5150L Operating Instructions.
• Insert the locking device (3); à p.4-5.
• Remove the hoses (4) from the main boom and place them on the hose drum.
• Remove the hoses (2) from the connections(1).
• Close the hoses (2) and the connections (1) with the caps.
• Attach lifting gear to the hose drum (1); à Slinging points, p.4-1.
• (A) – Remove the pin (2) from the holder (3).
• Lift the hose drum (1) out of the holder (4).
• (B) – Insert the pin (2) into the holder (5).
• Secure the pin.
• Stow the hose drum (1) safely for transportation.
Rigging work on the main boom
4.2 Rigging work on the hose drum
4.2.2 Checking the locking device on the hose drum
The locking device must be undone before you operate with a lattice extension.
The locking device must be inserted before removal of the hose drum.
SRisk of damage to the hoses!
Always check if the locking device is released before beginning operation with a lattice extension. In this way you can prevent the hoses being torn off when telescoping.
GRisk of accidents from uncontrolled rotation of the hose drum!
The locking device must always be inserted before the hose drum is removed. Otherwise the hose drum will rotate uncontrollably against the holder and could injure you.
There are holes (1) distributed around the inner face of the hose drum.
A – Releasing the locking device
• Rotate the spring latch (2) so that it is not engaged in a bore (1).
B – Inserting the locking device
• Rotate the hose drum so that the spring latch (2) is aligned with a bore (1).
• Rotate the spring latch (2) so that it engages in the bore (1). The hose drum is now secured against rotation.
Rigging work on the main boom
4.2 Rigging work on the hose drum
4.2.3 Positions of the hydraulic connections
Before operating the lattice extension, you must ensure the hydraulic connections are in the lattice extension operation position. Before working with the main boom for extended periods of time, you must place the hydraulic connections in the main boom operation position, so that the hose drum is not put under unnecessary strain.
GRisk of accidents from hoses springing back!
If you detach the hoses after the locking device has been released, do not under any circumstances let go of the hoses before they has been resecured. Otherwise the hoses will retract uncontrollably and can injure people or damage parts of the truck crane.
Working with the lattice extension
The locking device on the hose drum must be released; à p.4-5.
Separating the connections
• (A) – Remove the retaining pins from the pins (1).
• (B) – Remove the connecting plate (2) from the pins (1).
• Insert the retaining pins into the pins (1).
Rigging work on the main boom 4.2 Rigging work on the hose drum
Attaching the hoses
• Remove the linchpins (3) and fold up the guide sheaves (4).
• Remove the hoses (5) from the holder (1) and fasten them to the clamp (2).
• Fold down the guide sheaves (4) and secure them with the linchpins (3).
Fastening the connections
• (A) – Remove the retaining pins from the pins (1).
• (B) – Place the connecting plate (2) on the pins (1).
• Insert the retaining pins into the pins (1).
Rigging work on the main boom
4.2 Rigging work on the hose drum
Main boom operation The locking device on the hose drum must be released; à p.4-5.
Separating the connections
• (A) – Remove the retaining pins from the pins (1).
• (B) – Remove the connecting plate (2) from the pins (1).
• Insert the retaining pins into the pins (1).
Attaching the hoses
• Remove the linchpins (3) and fold up the guide sheaves (4).
• Remove the hoses from the holder (2) and fasten them to the clamp (1).
• Fold down the guide sheaves (4) and secure them with the linchpins (3).
Rigging work on the main boom 4.2 Rigging work on the hose drum
Fastening the connections
• (A) – Remove the retaining pins from the pins (1).
• (B) – Place the connecting plate (2) on the pins (1).
• Insert the retaining pins into the pins (1).
Rigging work on the main boom
4.2 Rigging work on the hose drum
Blank page
5Swing-away lattice
Swing-away lattice
5.1 Notes on this chapter
Where the lifting capacity tables use the term swing-away lattice extension, in this chapter the term swing-away lattice is used.
This chapter applies to:
–Swing-away lattice with and without head sheaves (1) on section4.
With head sheaves (1) it is designated as a swing-away lattice with heavy load lattice extension (ISS).
–Derricking swing-away lattice.
The angle is adjusted on the derricking swing-away lattice with the hydraulic cylinder (1).
Rigging work that applies only to this swingaway lattice is indicated in the checklists with the symbol (1.1).
–The inclinable swing-away lattice
The angle is adjusted on the inclinable swing-away lattice with the angle piece (2). Rigging work that applies only to this swingaway lattice is indicated in the checklists with the symbol (2.1).
Text that applies only to one of the swingaway lattices is explicitly indicated.
5.2 Operations planning
5.2.1 Assembly
SRisk of overturning in other combinations! Assemble the swing-away lattice only in the combinations listed as permissible in the lifting capacity table. Other combinations are not monitored by the RCL. CombinationDesignationZ + Y 1)
Permissible combinations
1) Designation in the lifting capacity table:
Z = length before setting the angle
Y = length after setting the angle
5.2.2 Identification
Risk of accidents when using an incorrect swing-away lattice! Install only the swing-away lattice that belongs to the truck crane. Other swing-away lattices must not be installed.
5.2.3 Slinging points
GRisk of accidents if used improperly! Attach slings to the swing-away lattice only at the designated slinging points. Use only lifting gear and joining elements of sufficient load bearing capacity.
Section1
The slinging points (1) are marked with stickers (2).
The sticker (3) gives data on the weight and the necessary lifting gear.
A guide rope (4) is fastened behind the head of section1.
Section3
The slinging points (1) are marked with stickers (2).
The sticker (3) gives data on the weight and the necessary lifting gear.
A strut (4) serves as the slinging point for the guide rope.
For section combinations, the slinging points and the information on weight and required lifting gear are specified on the stickers (1) and(2).
Example
For the section combination, section1 is folded onto section2, and section2 is mounted in front of section4.
The sticker (6) shows:
–The weight,
–The slinging points 3 and 7,
–The manner in which the lifting gear must be attached to the slinging points (5).
Slinging points 3 and 7 on the swing-away lattice are labelled with stickers having the corresponding numerals.
5.2.4 Transport dimensions and weights
5.2.5 Transport condition – removed
SRisk of damage to the lattice extension!
Always secure the lattice extension by tying it down with suitable belts when it is transported on a separate vehicle. This prevents the lattice extension from tipping over and becoming damaged during transportation.
GRisk of injury!
Before transport make sure that all pins are secured in the clamps with retaining pins. Secure any pins that are not secure. This way you prevent the pins from falling down while driving and injuring or even killing other persons.
GRisk of injury!
Before transport, ensure that all cables and hoses are securely fastened in the clamps and cannot come loose during driving. Additionally fasten the cables and hoses if necessary. This way you prevent the cables or hoses from falling down while driving and injuring or even killing other persons.
• Check that the heavy lattice load extension is secure for transport or secure it now, if necessary.
–All pins (1) are secured in the clamps.
–All electrical cables are wound onto the clamp (2) and closed with caps.
–Section3 is secured to a suitable support(3).
–All electrical cables (4) are closed with caps.
–The deflection sheave (5) is secured in the transport position.
Swing-away lattice
Check that the heavy lattice load extension is secure for transport or secure it now, if necessary.
For all swing-away lattices:
–The electrical connection (2) between section1 - section2 is disconnected; à p.5-99.
–The connection between section1 - section2 at the right (3) is established; à p.5-83. All pins that are not required are secured in the clamp (4).
–The folded connection (5) has been made; à p.5-86.
–The connection (6) between section2 and section4 is established, à p.5-78.
–The electrical connection between section2 and section4 (7) or (8) is established; à p.5-93.
–The deflection sheaves (1) and (9) are folded in and secured; à p.5-101.
–The cables are wound onto the clamp (10) and the plug is inserted into the dummy socket; à p.5-91.
–The swing-away lattice must be set down and secured on a suitable support (11).
–All electrical cables are closed with caps.
Additionally for the derricking swing-away lattice and swing-away lattice with ISS:
–The hoses are stored in the clamp (2) and the connections are closed with caps; à p.5-89.
–The derricking cylinder (3) is in position (A); à p.5-112.
Additionally for the swing-away lattice with ISS:
–The head sheaves (1) are folded in and secured; à p.7-57.
Additionally for the inclinable swing-away lattice:
–The swing-away lattice is in the 0°position (3); à p.5-115.
On the main boom
• Check that the heavy lattice load extension is secure for transport or secure it now, if necessary.
–The Rear connection (1) is separated; à p.5-68.
–The run-up rail (2) is folded in; à p.5-72.
–The Middle 1 connection (3) is separated; à p.5-69.
–The front connection (5) is in the Locked position; à p.5-70.
Additionally for the swing-away lattice with ISS:
–The Middle 2 connection (4) is separated; à p.7-46.
5.2.6 Transport condition – folded
SThere is a risk of damage to the lattice extension and the main boom! Always secure the swing-away lattice for on-road driving before driving the truck crane with a folded swing-away lattice. Only then is the swing-away lattice secured against slipping. This prevents the partly fastened swing-away lattice from hitting the main boom or the individual components of the swing-away lattice from hitting each other and becoming damaged.
Section1 only
• Check that the heavy lattice load extension is secure for transport or secure it now, if necessary.
–The connection between section1 - section2 at the right is separated; à p.5-83. All pins that are not required are secured in the clamp (1) and (2).
–The rear connection (3) has been made; à p.5-68. Section1 is attached to the main boom.
–The run-up rail (4) is folded in; à p.5-72.
–The Middle 1 connection (5) is established; à p.5-69. Section1 is attached to the main boom.
–The front connection (7) is in the Locked position; à p.5-70.
Additionally for the swing-away lattice with ISS:
–The Middle 2 connection (6) is separated.
• Check that the heavy lattice load extension is secure for transport or secure it now, if necessary.
For all swing-away lattices:
–The electrical connection (2) between section1 - section2 is disconnected; à p.5-99.
–The connection between section1 - section2 at the right (3) is established; à p.5-82. All pins that are not required are secured in the clamp (4).
–The folded connection (5) has been made; à p.5-86.
–The deflection sheaves (1) and (9) are folded in and secured; à p.5-101.
–The connection (6) between section2 and section4 is established, à p.5-78.
–The electrical connection between section2 and section4 (7) or (8) is established; à p.5-93.
–The cables are wound onto the clamp (10) and the plug is inserted into the dummy socket; à p.5-91.
–All electrical cables are closed with caps.
For all swing-away lattices:
–The rear connection (1) has been made; à p.5-68. Section1 is attached to the main boom.
–The run-up rail (2) is folded in; à p.5-72.
–The Middle 1 connection (3) is established; à p.5-69. Section1 is attached to the main boom.
–The front connection (4) is in the Locked position; à p.5-70.
Additionally for the derricking swing-away lattice and swing-away lattice with ISS:
–The hoses are stored in the clamp (1) and the connections are closed with caps; à p.5-89.
–The derricking cylinder (4) is in position (A); à p.5-112.
Additionally for the swing-away lattice with ISS:
–The Middle 2 connection (2) is established.
–The head sheaves (3) are folded in and secured.
Additionally for the inclinable swing-away lattice:
–The swing-away lattice is in the 0° position (5); à p.5-115.
Blank page
5.3 Checklists for rigging work
5.3.1 Overview
The distinction is made between various different procedures.
– Installation and removal
These procedures have to be performed when the lattice extension is being transported separately. The installation and removal of the lattice extension is described.
–Rigging
Rigging must be performed when the lattice extension is being transported on the truck crane. The changeover between the transport position and the operating position is described.
Swing-away lattice
5.3 Checklists for rigging work
The table shows which checklist is applicable to any required rigging work.
Required rigging workChecklist
–Installing swing-away lattice
–In operating position CHECKLIST: Installing the swing-away lattice – into the operating position, p.5-19
–In transport position CHECKLIST: Installing the swing-away lattice – into the transport position, p.5-25
Swing-away lattice
–Remove swing-away lattice
–From operating position CHECKLIST: Removing the swing-away lattice – from the operating position, p.5-30
–From transport position CHECKLIST: Removing the swing-away lattice – from the transport position, p.5-36
–Rigging the swing-away lattice
–In operating position CHECKLIST: Rigging the swing-away lattice 1.8 + 9.4 m – in the operating position, p.5-40
CHECKLIST: Rigging the swing-away lattice 1.8 + 16.0 m – in the operating position, p.5-45
–In transport position CHECKLIST: Rigging the swing-away lattice 1.8 + 9.4 m – in the transport position, p.5-50
CHECKLIST: Rigging the swing-away lattice 1.8 + 16.0 m – in the transport position, p.5-56
5.3.2 CHECKLIST: Installing the swing-away lattice – into the operating position
HThis checklist is not equivalent to the complete operating instructions. There are accompanying instructions, which are indicated by cross-references.
Observe the warnings and safety instructions there!
1. Prerequisite
–The truck crane is on outriggers and the superstructure is turned to the side or to the rear; à GMK5150 / GMK5150L Operating Instructions.
–The appropriate counterweight for the crane operation must be rigged; à GMK5150 / GMK5150L Operating Instructions.
–The main boom is fully retracted and locked. The telescoping cylinder must be locked in telescopic section V; à p.5-65.
The main boom is lowered to the horizontal position; à GMK5150 / GMK5150L Operating Instructions.
–An auxiliary crane must be available.
2. If necessary, mount the hose drum; à p.4-3.
Swing-away lattice 5.3 Checklists for rigging work
4. If necessary, move the hoses into the position for working with the lattice extension; à p.4-6.
5. Check that the swing-away lattice is secured for transport; à p.4-2.
6.For combination C
–Disconnect the electrical connection between section2 and section4; à p.5-93.
–Disconnect the connection between section2 and section4; à p.5-83.
–Set down section2 and section1.
7. Fold out the deflection sheaves. –On section2; à p.5-101. –On section4; à p.5-101.
8. For derricking swing-away lattice: Establish the hydraulic connection to the main boom; à p.5-89.
9. Establish the electrical connection to the main boom; à p.5-91.
10. Sling lifting gear to the swing-away lattice sections required for combination A or B and fasten a guide rope.
For the combination C, sling lifting gear to section4 and fasten a guide rope.
– à Assembly, p.5-2,
– à Identification, p.5-3,
– à Transport dimensions and weights, p.5-6,
– à Slinging points, p.5-4.
11. Lift the required section combination in front of the main boom.
12. Make the connections on the right and left of the main boom head; à p.5-75.
Swing-away lattice
5.3 Checklists for rigging work
13.For combination A
–Position the hoist rope; à p.5-104.
–Perform all further rigging work; à p.5-63.
14.For combination C
–Prepare section3 and fasten the guide rope.
–Fold the deflection sheaves on section3 into the operating position; à p.5-103.
–Sling lifting gear to section3, lift in front of section4 and lock in position:
– à Assembly, p.5-2,
– à Identification, p.5-3,
– à Transport dimensions and weights, p.5-6,
– à Slinging points, p.5-4.
–Establish the electrical connection between section3 and section4; à p.5-95.
–Lift section2 and section1 in front of section3 and lock in position; à p.5-81.
– à Identification, p.5-3, – à Transport dimensions and weights, p.5-6, à Slinging points, p.5-4.
–Establish the electrical connection between section2 and section3; à p.5-97.
15.For the combinations B and C
–Establish the electrical connection between section2 and section1; à p.5-99.
–Fasten the guide rope to section1; à p.5-66.
–Disconnect the Folded connection between section1 and section2; à p.5-86.
–Swing section1 in front of section2; à p.5-88.
Swing-away lattice
5.3 Checklists for rigging work
–Establish the connection on the left-hand side between section2 and section1; à p.5-84.
16. Remove the guide rope.
17. Position the hoist rope; à p.5-104.
18. For inclinable swing-away lattice: Set the angle position if necessary: –With auxiliary crane; à p.5-115, –Without auxiliary crane; à p.5-116.
19. Perform all further rigging work; à p.5-63.
5.3.3 CHECKLIST: Installing the swing-away lattice – into the transport position
HThis checklist is not equivalent to the complete operating instructions. There are accompanying instructions, which are indicated by cross-references.
Observe the warnings and safety instructions there!
HOnly combination B can be mounted in the transport position.
1. Prerequisite
–The truck crane is on outriggers and the superstructure is turned to the side or to the rear; à GMK5150 / GMK5150L Operating Instructions.
–The appropriate counterweight for the crane operation must be rigged; à GMK5150 / GMK5150L Operating Instructions
–The main boom is fully retracted and locked.
The telescoping cylinder must be locked in telescopic section V; à p.5-65.
The main boom is lowered to the horizontal position; à GMK5150 / GMK5150L Operating Instructions
–An auxiliary crane must be available.
2. If necessary, mount the hose drum; à p.4-3
3. If necessary, check that the locking device has been released; à p.4-5.
Swing-away lattice 5.3 Checklists for rigging work
4. If necessary, move the hoses into the position for working with the lattice extension; à p.4-6.
5. Check that the swing-away lattice is secured for transport; à p.5-8.
6. For derricking swing-away lattice: –Connect the hand-held control; à p.3-13.
7. Fold out the run-up rail;; à p.5-72.
8. Sling lifting gear to the swing-away lattice and fasten a guide rope: à Identification, p.5-3, – à Transport dimensions and weights, p.5-6, – à Slinging points, p.5-4.
9. Lift the swing-away lattice on to the main boom.
Swing-away lattice 5.3 Checklists for rigging work
16. For derricking swing-away lattice: –Derrick the swing-away lattice into position (A); à p.5-112.
17. Disconnect the slewing connection; à p.5-73.
18. Swing the swing-away lattice onto the main boom until the connecting point is aligned with the Rear connection; à p.5-87. Use the rigging rope for this. Reeve the rigging rope; à p.5-67.
19. Establish the Rear connection; à p.5-68.
20. Establish the Middle 1 connection; à p.5-69.
21. Fold in the run-up rail; à p.5-72.
22. For derricking swing-away lattice:
–Disconnect the hydraulic connection to the main boom; à p.5-89.
23. Disconnect the electrical connection to the main boom; à p.5-91.
24. For derricking swing-away lattice:
–Disconnect the hand-held control; à GMK5150 / GMK5150L Operating Instructions
25. If necessary, move the hoses into the position for main boom operation; à p.4-6.
26. Remove the slinging tackle.
27. Remove the guide rope.
28. Remove the rigging rope.
29. Check the transport condition of the swing-away lattice; à p.5-8.
5.3.4 CHECKLIST: Removing the swing-away lattice – from the operating position
HThis checklist is not equivalent to the complete operating instructions. There are accompanying instructions, which are indicated by cross-references. Observe the warnings and safety instructions there!
1. Prerequisite
–The truck crane is on outriggers and the superstructure is turned to the side or to the rear; à GMK5150 / GMK5150L Operating Instructions
–The appropriate counterweight for the crane operation must be rigged; à GMK5150 / GMK5150L Operating Instructions
–The main boom is fully retracted and locked. The telescoping cylinder must be locked in telescopic section V; à p.5-65.
–An auxiliary crane must be available.
2. For derricking swing-away lattice:
–Lower the main boom into a horizontal position; à GMK5150 / GMK5150L Operating Instructions
–Derrick the swing-away lattice into the 0° position; à Derricking the swing-away lattice in operation, p.5-125.
3. For inclinable swing-away lattice:
–Lower the main boom for unreeving the hook block.
4. Remove the anemometer and if necessary the air traffic control light; à p.5-108.
5. Remove the lifting limit switch weight and lifting limit switch; à p.5-106
6. If necessary, remove the camera; à p.5-110.
7. For derricking swing-away lattice: –Connect the hand-held control; à p.3-13.
8. For inclinable swing-away lattice: Set 0° angle, if necessary: –With auxiliary crane; à p.5-115, –Without auxiliary crane; à p.5-116.
9. Unreeve the hoist rope and remove from the lattice extension; à p.5-104.
10.For the combinations B and C –Fasten the guide rope to section1; à p.5-4.