Swing-away lattice 5.3 Checklists for rigging work
11. Swing the swing-away lattice until it comes free from the Front connection; p. 5 - 87.
à
12. Hold the swing-away lattice using the auxiliary crane.
13. Disconnect the slewing connection;
à p. 5 - 73.
14. Lift the swing-away lattice off the main boom and set it aside.
15. Remove the guide rope.
16. Fold in the run-up rail;
à p. 5 - 72.
à p. 5 - 70.
01.07.2017
17. Set the Front connection to the Locked position;
5 - 38
3 302 624 en
Lattice extension operating manual GMK5150 / GMK5150L