CNH Joystick Steering Kit with Secondary Electrical - 921G W230D Wheel Loader Instructions Manual

Page 13

5 - ASSEMBLY

7. Install the O-rings (39A) supplied with the JSS cut-off valve (39) on the CL and the CR ports of the steering EHPS valve (38). 8. Install the JSS cut-off valve (39) on the steering EHPS valve (38). Secure with the six bolts M10x105 (41) and the six washers 11x21x2.5 (40). 9. Install the 45° elbows (42) on the C1 and the C2 ports of the JSS cut-off valve (39).

LEIL19WHL0756FB

3

13 EN


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
CNH Joystick Steering Kit with Secondary Electrical - 921G W230D Wheel Loader Instructions Manual by www.heydownloads.com - Issuu