EN
4 Mounting 4.1 Variable displacement pump for working hydraulics 17819 3119
4.1.2 Prepare and carry out a test run – If necessary, perform the following work prior to the test run: - Tighten the screwed connections of all newly installed parts. - Fit any safety equipment previously removed. - Check hydraulic oil level. Top up if necessary. - Check gearbox oil levels of fitted components. Top up if necessary. - Put back any used tools. - Check any retrofitted and/or removed electrical connections. - Set up new machine components in the onboard information system, using the configuration software. - Grease all new lubricating points. – Carry out a test run: - Check machine settings. - Carry out a test run. - Check hydraulic oil level. Top up if necessary.
56
000 295 422 0 - ABA VP XERION 3300 - 08/07