4.1.2 Prepare and carry out a test run
4.1.2 Prepare and carry out a test run
–If necessary, perform the following work prior to the test run: -Tighten the screwed connections of all newly installed parts. -Fit any safety equipment previously removed. -Check hydraulic oil level. Top up if necessary. -Check gearbox oil levels of fitted components. Top up if necessary. -Put back any used tools. -Check any retrofitted and/or removed electrical connections. -Set up new machine components in the onboard information system, using the configuration software. -Grease all new lubricating points. –Carry out a test run: -Check machine settings. -Carry out a test run. -Check hydraulic oil level. Top up if necessary.