1 minute read

Preassembling new levers

6 K

J Preassembling new levers

–Fix magnet (K), which has been removed from original lever, onto right lever (6). (Fig.4)

4

–Reassemble original bearings (J) on right (6) and left (7) levers, using 6 screws (8), 6 contact washers (23) and 6 hexagonal nuts (24). Tightening torque: 48.5 Nm

(Fig.5)

5

This article is from: