
1 minute read
Preassembling new levers
6 K
J Preassembling new levers
–Fix magnet (K), which has been removed from original lever, onto right lever (6). (Fig.4)

4
–Reassemble original bearings (J) on right (6) and left (7) levers, using 6 screws (8), 6 contact washers (23) and 6 hexagonal nuts (24). Tightening torque: 48.5 Nm
(Fig.5)