Cat FB110 Feeder Breaker Operation & Maintenance Manual SN 54-2185 & 54-2193 (1)

Page 67

BI016382

BI016382

Operation _______________________________________________________ Tramming 1. Turn the “OFF/FWD/REV”selector switch located on the cover of the starter enclosure to the “OFF”position. 2. Turn the “OFF/TRAM/CONVEYOR”selector switch located on the cover of the starter enclosure to the “TRAM”position. 3. Turn the “OFF/MANUAL/AUTO”selector switch located on the cover of starter enclosure to the “MANUAL”position. 4. Set main circuit breaker located on the door of the starter enclosure by first moving the circuit breaker lever to the “RESET”position and then to the “ON”position. 5. Engage the “START CONVEYOR”pushbutton located on the cover of the starter enclosure to start the pump motor. 6. Lift up the neutral start valve handle guard all the way back so that the guard will not fall on the operator’ s hands. The machine can now be trammed.

________________________________________________________________ 5.22 FB110 Feeder Breaker


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Tailpiece tilt cylinder..................................................... 5

1min
pages 214-215

Tailpiece steering cylinder ........................................... 5

1min
pages 216-217

Lift cylinder................................................................... 5

1min
pages 212-213

Tailpiece installation..................................................... 5

2min
pages 202-205

Foot cylinder ................................................................ 5

1min
pages 208-209

Roof cylinder................................................................ 5

1min
pages 206-207

Crawler assembly ....................................................... 5

8min
pages 159-167

Conveyor chain ........................................................... 5

3min
pages 153-155

Breaker bit removal...................................................... 5

1min
page 201

Conveyor power unit.................................................... 5

7min
pages 193-200

Breaker shaft and breaker power unit ......................... 5

24min
pages 168-192

Main relief..............................................................5

1min
page 138

Head shaft sprockets ....................................................5

4min
pages 144-146

Pressure limiter......................................................5

1min
page 139

Under speed sensor calibration.....................................5

1min
pages 134-135

Crawler track adjustment ..............................................5

1min
pages 132-133

Tramming.......................................................................5

1min
page 67

Hydraulic system ................................................................5

6min
pages 84-89

Every 6 months .............................................................5

1min
pages 122-123

Conveyor .......................................................................5

5min
pages 68-71

“MANUAL”starting procedure.......................................5

1min
page 65

Shutdown procedure .....................................................5

1min
page 66

Electrical system.................................................................5

9min
pages 72-83

Inspection of the fire suppression system..........................5

1min
pages 126-127
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.