BI619850
BUCYRUS INTERNATIONAL, INC. 182M Electric Mining Shovel
PRE-START INSPECTION Before starting or operating the machine, know the emergency stop and proper operating procedures. Become familiar with all the controls and sound the signal horn to alert coworkers in the pit area of the intent to operate or move the machine. Prior to boarding, and before entering the operator's cab, inspect the areas listed below: Dipper • Rope & Equalizer Sheave • Teeth & Pins • Adapters • Dipper & Bail Structures for Cracks • Trip Mechanism & Snubber • Dipper Latch Bar • Lubrication Fittings Front End • Condition of Boom • Hoist Sheaves • Crowd Machinery • Handle/Yoke Block Clearance • Lube Coverage • Hoist Ropes for Wear or Damage • Boom Support Pendants • Air & Lube Lines & Connections • Loose Pins or Retainers • Walkways & Railings Lower Frame • Trail Cable & Cable Reel Condition • Swing Gear & Pinions for Lube & Damage • Guarding • Cracks in Structure • Roller Circle Condition • Lube Coverage • Air & Lube Lines & Connections DANGER!
August 2009
HIGH VOLTAGE! DO NOT contact the high voltage areas of the trail cable or collector rings. NEVER perform electrical or mechanical repairs or maintenance in these areas without disconnecting the trail cable power supply. - Failure to disconnect trail cable power supply could result in severe bodily injury or death.
47
Manual No. 10798