Retighten screw connections

Because of setting of the screw connections respectively the components, screws can become loose. The following mentioned screw connections of the crusher plant must be retightened after a first operating time of approx. 50 hours. Pay attention to the respective torque. Drive connections at the crusher plant: - Belt drive at the roll dirve - Belt drive - motor Crusher housing - inlet side Crusher housing - outlet side Face connections pan - stageloader Attachments at the substructure with pan

Select tightening torque

Take the torque of the respective screw connection from the corresponding spare part drawing. If the spare part drawing gives no other information, the torques of table "Tightening torques - Screws resp. nuts with metric coarse thread DIN13" in chapter 5 are valid.

Operation of the crusher plant General During normal operation please observe the following: Avoid to switch the crusher plant on and off without need. Feed the material at a fairly constant rate, if possible. Avoid overloading. Take care to ensure that the plant is serviced regularly.

40

Object-No.: 55278500000000


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
CAT Armored Face IMPACT ROLL CRUSHER SB 0815 Cleveland Cliff Operation & Maintenance Manual by www.heydownloads.com - Issuu