Case CX330 Excavator Operator's Manual 6-33740 - PDF DOWNLOAD

Page 92

OPERATING INSTRUCTIONS

MACHINE OPERATION !

WARNING: Check all controls and safety devices in a safe, open area before starting work.

When operating the machine, be sure to do the following:

TRIM THIS EDGE

When starting the engine, be sure to use the correct procedure for the prevailing weather conditions. See “Starting the engine”.

Regularly consult the hourmeter to ensure that all servicing operations are carried out punctually. See “Service intervals”.

If you use your machine in particularly harsh conditions (dusty or corrosive atmosphere, hydraulic hammer), the servicing intervals should be reduced accordingly.

See “Break In period” if the machine is new or if the engine has been reconditioned.

Locate the position of any underground pipes or conduits before starting work.

Do not work near overhead high-voltage electric lines without checking beforehand that all necessary measures have been taken to respect the minimum distances:

Keep all parts of the machine at least 5 m (16 feet) away from the power source

When working on a public highway, use standard traffic signs and take into consideration the working range of the upperstructure and its attachments. Local or national regulations stipulate the number, type and location of reflector strips.

Never operate the working or travel controls unless you are properly seated in the operator’s seat with the seat belt correctly fastened.

Modify your driving to suit the type of work and working conditions. See “Operating Instructions”.

Do not allow anyone to stand in the machine working area. Stop all operations until everyone has moved away.

Operate all controls gradually to ensure smooth machine operation.

See “Operating in water” if the machine will be standing in water during use.

See “Transporting the machine” when driving the machine onto a trailer.

See “Handling the machine” when it is necessary to lift the machine.

See “Towing the machine” when it is necessary to tow the machine.

Whenever load handling operations are to be carried out, it is imperative to adhere strictly to the instructions given in this manual and local legislation. See “Load handling”.

Never use the attachment or bucket for sweeping the ground to level out rubble or push objects (transversal stress on the attachment). 86

TRIM THIS EDGE LEFT PAGE Bur 6-33740na


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Case CX330 Excavator Operator's Manual 6-33740 - PDF DOWNLOAD by www.heydownloads.com - Issuu