1 minute read
Bucket
• All electric lines should considered live lines, even though the line in question might out operation and visibly grounded.
• The dealer company , if previously advised and involved in the work, well the operator , the machine owner , the physical legal entity that rented leased the machine that is responsible the time contract law , are liable for the adoption the necessary actions and precautions.
• Decrease work speed. Reaction time could too slow and the evaluation the distance wrong.
• W arn anyone who is in the work area keep away from the machine and the load.
• Appoint a person in charge signalling duties. This person will responsible for observing the machine, any part it and the load near the distribution grids from a more favorable viewing angle than that the operator . This person, the signal man, must in direct communication with the operator and the operator must pay undivided attention the signals given.
When working slopes near ravines plateaus with very high walls, check that the walls are suf ficiently supported prevent landslides. Pay special attention operations performed in the vicinity overhangs over the machine, where landslides may occur . Always check ground conditions and the conditions the material removed. Support all areas needed prevent possible landslides when:
• Digging near previous trenches filled with material.
• Digging in very poor ground conditions.
• Digging trenches subject vibration from railroads, machines road traf fic.