FulkersBaileyRussell_CapStat_Multi-Sector

Page 1


Introduction.

Established in 1998, Fulkers Bailey Russell is a construction consultancy firm offering tailored solutions to clients investing in construction and property within the public and private sectors.

We offer a multidisciplinary service comprising project management, cost management, building surveying, architecture and consultancy services for new build, refurbishment, repair, and upgrade projects. As part of a project team, or as a bespoke one-stop service, we strive to assist our clients in delivering successful and valuable developments.

Fulkers provides a no-nonsense, flexible, result-orientated service: A modern, forward thinking and professional practice, we value each of our clients. It is our objective to maintain a business which offers value for money and allows director attention on all projects.

What we do.

We place people, both clients and employees, at the centre of our business ethos and differentiate ourselves from the competition through our management style and culture.

This empowers our employees within an environment that encourages continuous improvement through sharing knowledge and best practice, challenge and innovation.

Our People.

Our people are passionate and dedicated to providing the best independent and innovative solutions to all our clients’ projects in a team environment that breeds success and leaves clients feeling that they have got more than they expected. Our ISO 9001 certification is testament to the quality of our service, systems and standards and our B-Corp certification demonstrates our commitment to making a positive impact in all that we do.

Our Services.

Multi-Disciplinary

Through partnership with our approved suppliers, we are able to provide a holistic multi-disciplinary service which includes, but is not limited to:

Acoustic Engineering, Architectural Design, BIM, Civil and Structural Engineering, Digital Surveying, Energy Design, Fire Management, Laser Scanning and Point Cloud, Lift Engineering, Mechanical and Electrical Engineering, Workplace Consultancy

Project Management

Change Management, Clerk of Works, Construction Project Management, Contract Administration, Design Management, Employer’s Agent, Energy Projects, Facilities Planning, Masterplanning, MEP Projects, Migration Management, Procurement, Programming and Scheduling, Project Governance and Control, Supply Chain Management

We are responsible for delivering a range of construction projects, all our services are geared to reduce risk, give greater certainty and to provide the best value for clients. This is why we develop our business around people.

Our people take time to understand your business and share their knowledge with the aim of generating fresh ideas. By blending our people, systems and construction market knowledge with our company, we customise our services to meet your requirements.

Cost Management

Bank Monitoring, Budget Advice, Budget Benchmarking, Building Cost Reinstatement Valuation, Cash Flow Analysis, Commercial Governance, Construction Cost Control, Contract Documentation, Design Cost Control, Development Appraisal, Due Diligence and Feasibility, Masterplanning, MEP Cost Control, Procurement Strategy, Project Monitoring, Tender Documentation, Value Management, Whole Life Cost Modelling

Building Surveying

Access Consultancy, Acquisition Surveys, Clerk of Works, Condition Surveys, Contract Administration, Defect Analysis, Design, Extension and Refurbishment, Dilapidations, Due Diligence Surveys, Employer’s Agent, Energy Efficiency, Feasibility Studies, Fire Door and Compartment Surveys, Fire Risk Assessments, Historic Building Conservation, Lead Consultant, Licence to Alter Party Walls, Planned Maintenance Surveys, Risk Management, Sustainable Construction, Whole Life Cycle Costings

Inspections, Contractor

Designer / H&S Architecture

CDM Advisor, Safety Advice,

Auditing,

Monitoring

Principal

Advisor, Designer BIM, Building Design, Contract Administration, Design, Extension and Refurbishment, Energy Efficiency, Feasibility Studies, Interior Design, Lead Consultant Services, New Build, Sustainable Construction

Project, Programme and Portfolio Management Decarbonisation

Baseline Management, Commercial Management, Data Analyst, Governance, Process Improvement and Management, Resource Management, Risk Management, Schedule Management, Strategic and Data Driven Reporting

Asset and Utilisation Reviews, Carbon Cost Tool, Carbon vs Cost, Fabric Condition, Funding Opportunities, Programme Strategy, Whole Life Cycle

Building Safety

Building Regs Principal Designer, Condition Reports, Design Management, Fire Door Inspections and Maintenance Programming, Fire Door Upgrades and Replacements, Golden Thread, Preparing Building Safety Case, Quality Control Management, Reviewing FRAEW’s, Structural/ Cladding/Fire Remediation

Big enough to cut it, small enough to care.

About Us.

Since the company was founded we have grown into a multidisciplinary consultancy with over 170 employees. Fully owned by three equity partners, we are not restricted by corporate red tape, we are able to take an agile and flexible approach to react to our clients needs quickly.

Strong, visible leadership from our senior teams ensures a personable approach and outstanding service delivery. We are big enough to cut it and small enough to care.

2023

ESG.

Fulkers are a Certified B Corporation, verified by B Lab to meet high standards of social and environmental performance, transparency, and accountability. Becoming a B Corp was a huge achievement for our company and is validation of our long-standing commitment to sustainability and social responsibility.

We have also been awarded the Prestigious Silver Rating from EcoVadis, an internationally recognised sustainability platform that evaluates companies across a range of criteria, including environment, human rights, ethics, and sustainable procurement practises. The Silver Medal places Fulkers in the top 25% of all assessed companies and recognises our commitment to sustainable business practices.

“While B Corp focuses on our holistic corporate responsibility, EcoVadis offers a detailed analysis of our operating practices and supply chain, aiding targeted improvements. Together, they enhance our credibility and demonstrate a commitment to ethical and sustainable practices, fostering trust with our clients, stakeholders and partners. Having both accreditations reinforces our dedication to comprehensive sustainability practices across both internal operations and external collaborations. We are one of very few companies to hold both accreditations.”

Our Commitment.

To create awareness.

Share knowledge and resource.

Use of more sustainable materials and practices.

Development of our focus on sustainable procurement process/ policy.

Develop our corporate social responsibility procurement process / policy.

Invest in people and suppliers.

Ensure sustainability is at the forefront of all client conversations.

To lead by example. Staff training.

Develop our KPI’s to reflect the above.

Our Frameworks.

Fulkers are currently appointed to the following frameworks under which individual contracts can be made. To appoint us via one of the below frameworks, please click on the logo for more details.

Our Experience

Capability Statement: Multi-Sector

Fulkers has been supporting Boeing on a number of key projects in the UK providing construction management (project management and contract administration services), cost management, CDM services and building surveying. The projects cover the following and Fulkers are in current discussion to support on further projects around the UK and Europe.

- Middle Wallop - Hanger Fit-Out for two x Chinook helicopters, Welfare and office facilities - £1m

- Odiham - Hanger refurbishment - £500,000

- Bristol Office relocation and Cat B fit out for new agile working environment - £8m

BOEING, VARIOUS PROJECTS

Location: Various UK and Europe

Value: £750 - £20m

41 Corn Street.

41 Corn St was built in 1964 as the new head office for the Bristol & West building society. The building’s elevation to Corn Street is characterised by its symmetry and order true to Brutalist buildings of its time, with large areas of glazing, pre-cast concrete fins and textured spandrel panels.

The building was stripped back and repositioned to provide brutalist original features married to modern finishes.

The floors offer exceptional light from the new windows that coupled with the excellent floor to ceiling height give a feeling of volume throughout the 3,000 to 19,000 sq ft of accommodation.

All occupiers benefit from the shower, changing and drying facilities along with basement bike storage through a dedicated entrance. The second and fifth floors in addition offer private roof terraces for occupiers to use.

IV REAL ESTATE

Pall.

Fulkers is providing project management, PMO quantity surveying and CDM services as part of our ongoing global relationship with Pall working on a number of high-profile projects developing sites to increase manufacturing facilities to make crucial products to support global demand.

The projects we are currently delivering are as follows:

Newquay Site wide Expansion, £20m

- Belt line production facility (Belt 6 and Belt 7 and production buildings

- Water Treatment Plant

- Logistics and Storage Warehouse

- Site wide Infrastructure

- Carparking

- PMO

Pensacola Site wide expansion, £55m

- Belt line production facility (Belt 7) and Production buildings

- Water Treatment Plant

- Logistics and Storage Warehouse

- Site wide Infrastructure

- PMO Production buildings

The works have been delivered via a mixture of procurement routes. Traditional design and build was used for the early phases with full fit out. In the later phases the shell and core was delivered design and build with the fit out delivered on a construction management basis via several separate packages.

Pall Belgium, 9m euros

- Cost Management Services for the initial design stages of a part new build and part refurbishment project in Belgium, including a 2-storey underground car park and additional manufacturing and office/welfare space.

- Pall Portsmouth - £1.5 Million refurbished science and tech facility with co working

Pall Vancouver, £45m

- New business acquisition to develop a new warehouse into a manufacturing and agile workspace

- Pall South Carolina, £40m

- Engineering centre and office

- New PMO Model,

Pall do not have an internal projects or estates team and Fulkers are working with Pall to set up a new project delivery model, programme management and PMO. Fulkers are also involved with Pall in a strategic role look at that their global portfolio and how best to priorities and deliver work.

PALL CORPORATION, VARIOUS PROJECTS

Location: UK, Europe, US and Canada

Value: £5m - £70m

Epic.

Fulkers are providing project management and cost management services to deliver the Epic masterplan in Ashton Vale, Bristol. Fulkers are engaged through the design and construction, liaising with the MultiDisciplinary Team, to contribute to and maintain the programme, quality, progress and cost for the design, procurement and construction of the Project.

The organic growth to design to over the next 10-12 years is forecasted at 1200 people. The occupancy could increase and the masterplan can accommodate more.

Phase 1 of the development is to be:

- Two office buildings

- 380 individual offices per office building

- Each cellular office will be 9m by 12m

- A Temporary solution for culinary

- An underground car park for 765 total car parking spaces (3 buildings at 255 spaces per building

- The utility space allows for easy expansion and installation to meet future Campus demands

- Involved from inception to completion for the early phases of the overall development.

- Electrical and mechanical infrastructure to support the Phase 1 buildings. Plant to support day 1, infrastructure (primary utility route sizing) to support full Campus load Re programming of work packages to ensure the development is delivered on time. If delays should occur in the construction phase a detailed ‘target programme’ with the contractor is always produced and works are re programmed and then closely monitored thus enabling completion on time.

- Substation allowed for all roadways into the site to facilitate Campus 1

EPIC BRISTOL HEAD QUARTERS

Location: Bristol

Value: Confidential

Sky Media London.

Fulkers operate as a client side consultancy embedded within the Property Services Group. As part of our role we align with Sky Project delivery toolkit, attend weekly project updates that are run through a flash report and tracker system, as well as support on internal project strategy meetings on master plan and business function projects.

We pride ourselves on building very strong relationships within Sky, with the Project team, the Health and Safety team and the Services team, as well as with individual business units such as Sky IT and Security.

We have embedded the principles of how the Property Service group operates in Sky with a strong focus around communication and collaboration, which is reflective of our own core values. As part of our successful relationship we are involved in supporting Sky at all levels, including at strategic level on feasibilities and Master plans.

Sky operates in a fast and evolving environment, and with the strong relationship and understanding of the Sky process, we have developed to react and adapt to the project needs.

Our Experience with Sky in London includes:

- Multi Storey Car Park and logistic centre with Bus terminal, £20m

- Project Management toolkit and cost model tool

- Nova South: CAT B fit-out of high end office space and media rooms including decommissioning of existing premises, £1.5m

- Refurbishment of a Central London degraded building for a Sky affinity media company, £500k

- Sky Central Cinema and Pop-up contact centre, £150k

- Campus external improvements, £500k

- Sky 4 Chamber RF test lab, £100k

- Lisbon: CAT B fit-out of two floors for office space, £2.4m

- Minerva: Refurbishment and reconfiguration of existing office spaces in different building on the Sky campus to relocate Sky colleagues, £1.5m

- TMSQ: CAT B Fit out of office and breakout space, £2.8m

- Scotland NEW BMS infrastructure and upgrade, £1.1m

- UK-wide catering (cafes and restaurants) upgrade and refurbishment, £2.6m

- UK-wide energy monitoring and metering rollout, £1.5m

VARIOUS PROJECTS

Location: London

Value: >£35m

Industria.

BEFIRST REGENERATION

Location: London

Value: £30m

The revolutionary business space called “Industria” elevates the industrial landscapes in Barking. This cutting-edge development provides top-tier, flexible workspaces in a striking building designed to enhance the local environment whilse setting new sustainability standards.

Fulkers Bailey Russell were appointed during the early months of the Covid 19 pandemic in 2020, providing both Project Management and Cost Management services. Using new and collaborative ways of working with the client and design team, we delivered this innovative and ambitious approach to modern industrial design.

Throughout the construction period, we developed robust processes to tackle challenges around long lead times, inflationary pressures, and subcontractor insolvency to deliver the project on time and within budget.

Industria won ‘Commercial Project of the Year’ at the London Construction Awards 2024 with the judges commenting “the project is an innovative and elegant design solution and a very exciting use of industrial land, inherently sustainable with a powerful visual impact.”

Following Industria’s success in the London Construction Awards, it also won the Workplace Category in the New London Awards (NLA) 2024 for its bold commitment to blending industrial uses with workplace and community spaces.

“The building offers a range of light industrial units and spaces within a contemporary, sustainable structure that can flex and adapt to future requirements. It signifies an innovative new industrial model for the UK, with the potential for national impact in this sector.”

Gilbert House.

37-39 Corn Street is an art deco building comprising 17,000 sq ft and was designed by world-renowned architect Sir Giles Gilbert Scott, famous for some of the UK’s most prominent landmarks including Battersea Power Station, Liverpool Cathedral, and the iconic red telephone box. It is now owned and managed by IV Real Estate.

The Grade II listed Gilbert House has undergone a £1.5m sympathetic restoration to provide contemporary air-conditioned office floor plates from 2,000 sq ft to 9,500 sq ft.

This has included new windows, fully restored wooden floors with accessible perimeter trucking and period style WCs.

Gilbert House benefits from a communal roof terrace with far reaching views over the city and beyond. In addition, there are secure bike lockers and a fully accessible shower and changing room for tenants to use.

Origin Workspace.

ORIGIN WORKSPACE

Location: Bristol

Value: £7m

Origin Workspace has been designed to meet the needs and aspirations of the modern worker, promoting wellbeing and facilitating teamwork.

The project offers 42,000ft2 of coworking space, including hot-desks, dedicated desks, cellular office space, meeting rooms, event space, and a members’ lounge. A roof terrace allows workers to enjoy the open air and sunlight, as well as stunning views of Bristol. In the members’ lounge, a kitchen and dining area allows for work breaks, networking and socialising.

With its range of spaces, Origin Workspace offers a comfortable and dynamic base and networking hub for local entrepreneurs and start-ups, filling a need in the community and providing a valuable resource for growing businesses.

The project has worked to a fast-paced program. The project team are delivering a strip-out, third floor and roof terrace extension and new curtain walling, finished to full fit-out in a 12-month period right through from project kick-off to occupation. The project has posed many challenges; on-going engagement with local residents and businesses, engaging with local planning authority and developing a design that will set a precedent for future projects.

As part of the planning agreement, there was a brief by Bristol City Council to reduce carbon footprint by 20%. By installing solar panels on the roof, Origin Workspace has offset in excess of 25% of its carbon footprint. Originally the building would have been fully air conditioned with heat exchanges down in the basement, which although would have been effective, would have been inefficient. The decision was taken to switch natural ventilation, with minimal air conditioning in only some areas.

Phase 1 opened at 80% capacity, creating a new community made up of individuals and businesses that have selected either lounge membership, coworking or private office space. Phase 2 finishes in December, and when complete, Origin Workspace will have over 400 desks.

The aim of Origin Workspace was to create something of a legacy with real attention to detail, from the top specification of furniture and fittings throughout, to the breath-taking views from the roof terrace facility.

The strength and success of the space has been recognised by the Insider Media Awards (Winner of Commercial Workplace of the Year) and Bristol Property Awards (shortlisted for the Building Transformation category).

Leonardo.

Location: UK, Various

Value: £50m

Fulkers Bailey Russell provide Multidisciplinary services to Leonardo across their UK estate. As part of our partnering approach we have undertaken an extensive review of their Project delivery model, creating a more agile approach that is industry aligned yet still bespoke to Leonardo’s culture and structure. This promotes best practice and implements a governance process for projects to be delivered against.

For Leonardo, we support and manage the estate strategy and new ways of working that incorporate more flexible multifunctional environments to meet their vision on new energy and sustainability targets, as well as providing business continuity and developing whole life cycle costing for business cases.

We are also delivering a diverse range of projects ranging from M&E upgrades, security, fire, new custom working for collaborative environments,

data centre upgrades, feasibility planning and schedule, labs and clean rooms and supporting the management of the incumbent FM providers on maintenance projects.

Our Project and Cost Managers work very closely together and with the estates team providing input on the strategic planning with the common goal to enhance the environments, find opportunities to reduce real estate footprints and to drive sustainability and modern methods of construction.

As part of the above we are leading the masterplan estate team looking at the opportunities to enhance the Yeovil campus by redeveloping the campus by re-purposing existing buildings, provide new builds that are more efficient from space and energy and to enhance the current infrastructure. The plan is to implement this over the next several years and looking at funding opportunities to achieve this.

LEONARDO

Sky Retail.

We have enjoyed a successful relationship with Sky Retail for several years, providing a range of professional services whilst integrated with the client team to create a seamless delivery model for their retail roll-out programme, providing a collaborative approach across all work streams.

As part of this service we have integrated with the client team to create a seamless delivery model for their retail roll out programme and provide a collaborative approach across all work streams.

Within the UK, our scope has included the delivery of 14 immersive Sky stores. Locations include Liverpool, Gateshead, Glasgow, Leeds, Edinburgh, Bristol, Sheffield, Stratford, Cardiff, Bluewater, Manchester, Birmingham, Belfast and White City, their flagship UK store.

We are also appointed to support Sky in the roll out of several stores in both the Republic of Ireland and in Germany.

In Ireland, the roll out included four stores; two in Dublin; one in Limerick and one in Cork, all of which opened in early Summer 2022. The stores feature the launch of the SKY Glass Streaming TV as well as their mobile phones and broadband products.

The Germany roll out will provide stores in Oberhausen, Berlin, and Munich.

The Fulkers team have worked with Sky throughout the pre-delivery and delivery phases of these projects, with some still in the delivery phase.

VARIOUS PROJECTS

Location: Europe

Value: Confidential

Ashton Gate Sporting Quarter.

The Sports & Convention Centre (the central focus of the scheme) is intended to serve as the Bristol Flyers Basketball Team’s new home and the premier events venue in the South West, building on the commercial success of the Ashton Gate Redevelopment. The 4,000-capacity venue is anticipated to become a ‘Sporting Quarter’ as well as a place for entertainment and conferences. It will stand adjacent to Ashton Gate and is hoped to host world-class exhibitions, conferences, and live events apart from sports events.

The proposed Ashton Gate expansion will also include the development of a hotel, office spaces, additional housing, and a multi-storey car park.

The scheme also includes the delivery of hundreds of new homes on nearby land adjacent the newly opened Metrobus M2 route near Ashton Gate Stadium.

BRISTOL SPORT

FAR EAST CONSORTIUM & HARINGEY COUNCIL

Location: London

Value: £80m

Fulkers Bailey Russell were appointed to deliver the redevelopment of the Hornsey Town Hall, in London. The scheme proposed by Haringey Council and Far East Consortium aims to refurbish the Town Hall and bring it ‘back to life’ as a property of significant interest. The works include providing:

- Sensitive restoration of the ‘Modernistic’ interior features, such as the Council Chamber, Clerks Office and Assembly Hall

- The Town Hall will become a centre for arts and enterprise activities for the benefit of the community

- Complex structural alterations, listed feature restoration and asbestos removal

- Refurbishment of the Broadway Annex into a residential and retail space

- A new arts centre with flexible community and events space

- Public realm improvements to the Town Hall square and green

- A 67 bed hotel located within the Town Hall

- Public cafés and restaurants

- Circa 130 new apartments to the rear of the Town Hall

- A mews development, north of the Town Hall,

- Aiming to achieve BREEAM ‘Very Good’ and are being delivered using BIM Level 2.

The Town Hall is a Grade II* listed historic building, which was designed by Reginal Uren in 1935, but closed to the public in 1966. Hornsey Town Hall has been vacant since it closed and is currently listed on Historic England’s Heritage at Risk Register.

The Town Hall comprises of three storeys, plus a bell tower. As part of the refurbishment all the non-original structures will be stripped to shell and core, retaining key façades and the listed features will be refurbished following an asbestos strip out programme.

The majority of the existing structure will be retained; however, new community spaces and vertical access systems will be installed to the Town Hall, in order to improve the functionality of the space.

The existing roofs and façades will be cleaned, repaired, and repointed in order to extend their life span, as well as reviving the architectural detailing that still decorates the elevations.

Winstanley and York Road Regeneration.

TAYLOR WIMPEY PLC

Location: London SW11

Value: £550m

Fulkers has been providing services for Taylor Wimpey on a range of projects. This includes masterplanning advice for the Winstanley York Road regeneration projects which comprises approximately 2,200 mixed tenure apartments, leisure facilities, commercial space and extensive landscaping.

The scheme is a joint venture development between Taylor Wimpey and Wandsworth Borough Council.

Following our successful advice, Fulkers has been successful in being appointed to the framework to provide further services for the individual blocks.

Fulkers has also provided procurement advice to the JV team reviewing the implications of Design and Build and Construction Management procurements routes and various mixtures of both.

The development includes:

- Up to 2,550 new homes, 35% of which are to be affordable

- A mix of tenures including social rent, shared ownership, shared equity, affordable rent, private rent and open market sale

- The re-provision of all council rent and resident leaseholder homes. The new council homes will be built to match the housing needs of the existing residents eliminating over-crowding and ensuring homes are fully adapted to residents’ physical mobility needs

- Major new community infrastructure, including a state-of-the-art leisure and community centre, a library, a children’s centre and nursery

- The creation of a new public park is at the heart of the development. Totalling 2.49ha, this new open space will offer a greater range of amenity and increased accessibility, enabling many more homes to benefit from its use

- Significant economic benefits, including in excess of 388 net additional permanent jobs and gross value added (GVA) to the local economy of approximately £208m.

Locksbrook Road.

Bath Spa University purchased the Nicholas Grimshaw designed, former Herman Miller factory on Locksbrook Road in 2016, and over a few years have transformed it into a fantastic new academic building for Bath School of Art and Design.

The Grade II listed factory in Bath is designed to reflect the manufacturer’s philosophy of open, inclusive and democratic working spaces that can be adapted to suit their purpose.

The building is in a central location and close to student accommodation on Lower Bristol Road and Oldfield Park. As a former factory used by Herman Miller, it is part of Bath’s industrial history.

The Project was procured via SCAPE procurement and we worked closely with the contractor and their supply chain at each of the RIBA stages to develop the cost plans in line with the approved budget and highlight both Value Engineering and component Life Cycle Costs to the Client, to inform decision making.

Location: Bath Value:

BATH SPA UNIVERSITY
£22m

University of Sussex.

UNIVERSITY OF SUSSEX & SUSSEX ESTATES AND FACILITIES

Location: Brighton

Value: £85m

The University of Sussex is situated on a large and open greenfield site on the South Downs, East Sussex on the edge of the city of Brighton and Hove.

The campus, designed by Sir Basil Spence, is much lauded in the architectural community, with many of the buildings on the University’s campus winning awards. In 1993, the buildings which made up the core of Spence’s designs were given listed building status, with Falmer House being one of only two buildings to be given a grade I status of “exceptional interest”. Fulkers has been assisting the Estates and Facilities team, working at the University of Sussex and latterly with Sussex Estates and Facilities (SEF) since 2004. The different types of projects and approximate values are listed below:

- Masterplan enabling works and infrastructure upgrade, £5m

- Annual academic and residential long-term maintenance/compliance refurbishments, £2m

- Annual minor (summer) works refurbishments and fit outs, £1m

- Annual general teaching space and lecture theatre refurbishments, £1m

- Data centre and office refurbishment, £1.5m

- Project and cost management staff secondments

Under previous employment members of the Fulkers team have delivered the following projects:

- Swanborough New Build Residence, £12m

- Fulton New Build Teaching Building, £11m

- Library refurbishment, £6m

- District heating and combined heating power M&E installation, £5.5m

- Catering outlets refurbishments, £11m

- Meeting House refurbishment, £750k

- New Child Centre, £2m

London School of Economics and Political Science.

As part of the London School of Economics and Political Science’s (LSE) frameworks, projects include the design, refurbishment and repair of a wide variety of buildings spread across their sites in central London.

Regularly acting as lead consultant, Fulkers manage multi disciplinary design teams on projects from feasibility through to project completion. Our role includes preparing the Project Execution Plan and all Design Stage Milestone Reports for client approval of each stage.

Key projects on the frameworks have included an external condition survey of the Rosebery Hall Student Residential Accommodation, Services for the £300k refurbishment of the first floor of Columbia House at LSE’s main campus on The Aldwych in central London, to create a new directors office suite, and professional services for the £300k provision of library archive department in Cowdray House, a grade II listed building.

Fulkers is also appointed to lead the multidisciplinary teams involved in the delivery of the £1.75m relocation of several departments. The works, which are to be delivered in phases and in an exceptionally short time frame, involve the complete subdivision and fit out of 1 Kingsway for two distinctly separate departments to occupy.

Under previous employment, Sam Bailey was appointed to deliver a new expansion project for the LSE’s new £25m Saw Swee Hock Centre. Sam advised the LSE throughout their innovative architectural competition process through to agreement of the final account.

The Parish Hall refurbishment in the LIF conservation area was completed within the allocated gross budget of c£1.5m and is a key building set adjacent to the SSHC and within the heart of the LSE ‘campus’.

Location: London WC2

Value: £35m

University of Bath.

UNIVERSITY OF BATH

Location: Bath

Value: £50m

The Institute for Advanced Automotive Propulsion Systems School of Management Building

The University of Bath is currently undergoing expansion, with the construction of a new £50m building taking shape. This new build will be 15,000m², extending the overall size of the University campus and its facilities by providing new and attractive learning spaces. It is intended to be a focal point for all students, staff and visitors approaching the University, and will house a total of nine lecture theatres (one of which being a 250 seat conference theatre), as well as general teaching spaces.

Another feature will be a large, glass atrium, which will function as a central hub within the building and will be covered with a wildflower roof, allowing the building to blend into the natural landscape. The project commenced in the summer of 2017, with completion scheduled for spring 2020.

The project will allow the University to continue attracting both high quality students and staff. It will provide students with an enjoyable learning environment, as well as facilitating even more practice-relevant education, providing well prepared graduates to the workforce.

The Institute for Advanced Automotive Propulsion Systems (IAAPS)

IAAPS is a new research and innovation facility for advanced propulsion systems, to deliver future generations of clean and efficient vehicles. Based at the Bristol and Bath Science Park, it will be industry led and compete on a global scale within the automotive propulsion research arena.

The facility will host a range of state-of-the-art experimental research platforms to enable precise systems-level investigations to be conducted including whole vehicle assessments, in particular under real-world driving conditions. IAAPS will be designed for the future, enabling deep insights into the complex nature of transitioning to Ultra Low Emission Vehicles.

Through its open innovation model, our vision will enable academics, automotive industry partners and small and medium sized enterprises (SMEs) to conduct transformational research and have access to world class research infrastructure and people. This will promote greater collaboration and the sharing of expertise to advance knowledge. High growth small businesses are vital to economic growth and many of the UK’s most exciting innovations are fostered by SMEs. IAAPS will offer SMEs facilities that will create opportunities to build and expand their businesses.

School of Management Building

The University of Bath is currently undergoing expansion, with the construction of a new building taking shape in the heart of the Claverton Down campus. This new build will be 15,000m², extending the overall size of the University campus and its facilities by providing new and attractive learning spaces. It is intended to be a focal point for all students, staff and visitors approaching the University, and will house a total of nine lecture theatres (one of which being a 250-seat conference theatre), as well as general teaching spaces.

New Sixth Form Centre.

Situated in Southwark, the City of London Academy transformed a derelict brownfield site into a new educational heart for the local community, a project that was delivered in 2006 by members of the our team under previous employment.

Following the success of the Academy, there was a need to expand their current sixth form capacity from 100 to 400 students. We were appointed in 2016 to provide a range of services to support this expansion, having previously been involved in the construction of their head campus building.

The main goal of the project was to create the additional space before the start of the 2017 term, ensuring the project kept within budget and time. The new sixth form was fitted out within the shell and core of a large multi-use building constructed by Telford Homes.

The works were split over two phases: the first phase created an entrance, canteen, classrooms, IT hub, showers and WCs; the second phase delivered a new library/resource centre.

Location: London SE1

Value: £3m

CITY OF LONDON ACADEMY

The Great Hall.

We provided professional services to support the construction and fit-out of a new theatre and associated ancillary spaces for Kent College Canterbury. The design was developed to provide a degree of flexibility in occupancy.

The Great Hall has two modes of operation: assembly for up to 600 and the theatre mode of 350. This is made possible by the use of retractable seating which can be pushed together and concealed behind movable wall panels to create additional foyer space adjacent to the main entrance lobby.

The stage has also been developed to be changeable with movable proscenium panels, maximizing the stage when the Great Hall is being used for music or assembly. Rostra seating has also been provided within the stalls to allow the stage and seating to be reconfigured for a variety of performances.

The Great Hall has a state-of-the-art natural ventilation system utilising a labyrinth constructed under the theatre to draw cold air out of the foundation to ventilate and cool the space.

Location: Canterbury

KENT COLLEGE CANTERBURY

The City Academy.

CITY OF LONDON & KPMG

Location: London E9

Value: £25m

Sponsored by the City of London Corporation and KPMG, The City Academy opened its doors to its first year intake in 2009. Built in Hackney in East London, on the site of a technology college which closed in 2007 due to its poor performance, the design of The City Academy building had to raise the aspirations of its pupils and its neighbours. We* provided full services.

The Academy was built on a sensitive site due to its vicinity to a grade II* listed building. The works comprised the construction of a school building of 11,000m2, on a 13,500m2 site, including a sports hall, assembly hall, dance studio and dining hall.

The four-storey school building generates natural daylight and ventilation to the building and at the same time emphasising the business orientation that the sponsor wanted to communicate throughout the school’s ethos.

A pragmatic approach to environmental issues produced a naturally ventilated building with an abundance of daylight which takes its heating and cooling from the grounds.

Pupil & Community Engagement We led an engagement programme with the Hackney Community and pupils which was acclaimed at the BSF Awards, winning the category of Innovation in Student Engagement for its inclusion of the ultimate clients: the future pupils.

A fully partnered approach operating open lines of communication and a tight system for decision making allowed the team to bring the project in on time and to budget despite a six month set back when the location of the school changed.

The success of the school has resulted in the recent appointment of the Fulkers team to deliver services for their £2m new sixth form centre.

MRI Suite, The Maudsley Hospital.

We were commissioned by Kings College London of Kings Healthcare Partners, as a joint venture with South London & Maudsley NHS Foundation Trust to refurbish an existing space at The Centre of Neuroimaging Sciences, to provide a new MRI Suite.

Due to the complexity of the equipment and the specialist requirements of the space to house the MRI, we advised the client to procure the contract on a design and build basis, using specialist companies experienced with this type of installation.

In our role, we were responsible for indicative design, preparing employers requirements, cost control, advising on VAT and managing the project through to completion.

Due to the complexity of the project, we were heavily involved in managing a number of stakeholders, including the Radiology Officer, Health and Safety etc.

We were able to provide the high quality medical suite expected of a first class higher education environment in a leading teaching mental health hospital in Central London. Our final project was praised by Kevin Little, Director of Capital Projects of Kings College London:

“ This MRI installation was vital to our continued provision of first class health services and Fulkers’ project management and design skills ensured that it was delivered effectively and with minimum disruption to our very busy hospital .”

KING’S HEALTH PARTNERS

Location: London SE5

Value: £1.5m

Paediatric Oral Health and Post Graduate Centre.

Location: London SE1

Value: £4m

Fulkers was responsible for the reconfiguration of part of the 22nd Floor of Guy’s Tower on the Guy’s Hospital Campus. The project formed Phase Two of a larger programme of works known as the Paediatric Oral Health and Post Graduate Centre, which was a joint venture between the Trust and Kings College London University. The work included stripping out the entire original department and full refurbishment to a high standard to create 6 separate dental teaching facilities with a total of 41 fully operational dental bays and associated fittings.

The new teaching department also included seminar rooms, offices, clean and dirty utilities, compound store, staff rooms, locker and changing rooms as well as a new reception and waiting area.

All areas involved us in extensive design coordination with the services engineers, not only in serving the department with the normal electrical and mechanical requirements, but also to extend all of the required gases to each of the teaching chairs.

We suggested installing a raised access floor throughout the department. This had two advantages. It assisted in coordination of the services by providing more room for running of the gas pipework to serve the chairs and also negated the need to run the pipework within the ceiling below, which would have caused major disruption to the department below and associated additional cost.

The project also involved us with extensive negotiation with the client’s preferred dental chair and furniture manufacturer. Part of their remit was to provide templates indicating the position of their equipment and service requirements, which had to be carefully coordinated on to our drawings and finally constructed on site by the contractor.

The works were successfully completed within a busy occupied Acute Hospital Environment where health and safety, segregation and client business continuity was of paramount importance.

GUYS AND ST THOMAS’ NHS FOUNDATION TRUST

Phase B Redevelopment, Ulster Hospital.

Ulster Hospital is one of the major acute hospitals serving the Belfast area. Phase B included a refurbishment and new build £265m programme for the 32,000m² Acute Services Block and 30,000m² Inpatient Ward Block, to make it suitable for future health care provision in Northern Ireland.

The outline brief for phase B of the redevelopment was to link together the buildings constructed under phase A, while providing additional facilities such as: emergency, radiology, AHP, outpatients, assessment wards, HDU/ITU wards, pharmacy, kitchen/dining, mortuary, in patient wards (20), paediatrics and laundry.

The Fulkers team assisted South Eastern Health and Social Care Trust in the preparation of outline business cases, leading the Design Team to develop a Works Cost Limit in accordance with PRP Framework stipulations and European legislation. We worked with the Contractor and Design Team to produce a Value Engineering schedule resulting in a contract sum for the Generic Ward Block.

We also monitored financial spend for the project. This included combining cost information from individual Financial Statements into monthly Cost Reports to identify current anticipated outturn costs, carrying out multi-million-pound valuations while reporting monthly to South Eastern Health and Social Care Trust Board.

SOUTH EASTERN HEALTH AND SOCIAL CARE TRUST
Location: Belfast
Value: £265m

The Royal Marsden.

Location: London, Various Value: £5m

Fulkers is currently appointed on their framework and is providing professional services on a number of projects spread across The Trust’s two main sites at Chelsea and Sutton. All projects revolve around cancer acute care and associate services. Commissions involve us in all stages of the project from agreeing the briefs with multi-stakeholder engagement, feasibility and managing projects through to successful completion.

Key projects have included the £300k refurbishment of a Private Outpatients Department at Sutton, the £92k preparation of shell spaces for final fit out by Boots Pharmacy’s at Sutton and Chelsea, a £28k provision of new clean room and staff room and

office in Markus Ward Chelsea, a £76k project to provide new storage facilities within the Theatre Suite, Chelsea, and a £78k refurbishment of dirty utility, patient bathrooms and staff room in Wilson Ward Chelsea.

We have also provided traditional services to the Trust on their larger developments, including dealing with Party Wall matters and Dilapidations.

All projects are completed on busy occupied hospital sites where segregation, health and safety and client business continuity is of paramount importance.

THE ROYAL MARSDEN NHS FOUNDATION TRUST

South West London and St George’s.

As members of this Mental Health Trust’s framework, Fulkers has been involved with multiple projects, with individual values up to £1.3m, spread across the Trust’s three main sites in South West London.

We are currently serving our second consecutive term on this framework, which is a testament to our extensive mental health knowledge and the value that the Trust place on our services.

We regularly act as both lead consultant on projects managing multi disciplinary teams, or as sole provider delivering our core services on smaller projects.

We are involved in all stages of the project from coordinating the briefs with multi stakeholder engagement through to successful completion.

Projects range from £5k-£1.2m. A key project, has included the £1.2m refurbishment of Heather Ward to create a 10-bed children’s unit, which provides intensive psychiatric inpatient and day care for children who have hearing and mental health disabilities.

Other projects demonstrating the range of our involvement have included the £350k provision of a Functional Psychiatric Unit at Azaleas Ward Tolworth Hospital, the £80k refurbishment of The Outpatients Department at Tolworth Hospital, the £400k refurbishment of Harewood House at Springfield University Hospital, £125k of repairs to chimneys in the Newton Building and a £90k upgrade of fire doors to the Shaftesbury Ward.

All projects are completed in busy occupied hospital sites where segregation, health and safety and client business continuity is of paramount importance.

Location: London, Various

Value: £18m

SOUTH WEST LONDON AND ST GEORGE’S
MENTAL HEALTH NHS TRUST

Capability Statement: Multi-Sector

The Old Brewery.

The proposed scheme includes 94 distinctive new homes and 2,000ft2 of co-working and commercial space. Located on the 0.5ha brownfield site of the old Thomas Baynton/Ashton Gate Brewery, the plot is currently used for warehousing and workshop space.

The development will deliver an exemplary scheme which complements the character of North Street. Given the site’s location, the development will use the opportunity to create a new ‘gateway’ into North Street from Ashton Road and will act as a catalyst for the redevelopment of adjacent sites.

The scheme’s design will draw on the local context and surrounding character areas while echoing the site’s industrial heritage. Existing and locally important heritage asset buildings with a sense of character will be retained, including the Byzantine Weighbridge House, Gatehouse and its stone piers. The new buildings look to complement the heritage and design of the existing architecture on the site and within the local context.

The Fulkers Bailey Russell team are carrying out several post-contract duties.

Fulham Gasworks.

Location: London E14

Value: Undisclosed

St William Homes is a 50/50 joint-venture between power network operator National Grid and housing developer Berkeley Homes.

St William intends to build a residential-led scheme with up to 1,900 homes and up to 160,000ft2 of employment and retail space. Most of the homes are intended to be apartments, with contemporary buildings up to 30 storeys in height proposed for the eastern part of the site. Buildings on the western part of the site would be more traditional in design and smaller in scale, the report said.

A “vibrant mixed use area” would be provided in the southern area of the site, with shops, businesses and a new public square.

The indicative plans also include open spaces for residents and the public, with a new central park proposed for the northern area.

Fulham Gasworks is part of Hammersmith and Fulham’s planning framework for the South Fulham Riverside Regeneration Area and the scheme will be a key element to the redevelopment of the area.

© Image from Berkeley Group (berkeleygroup.co.uk)
ST WILLIAM HOMES LLP

Fulham Reach.

The award winning development Fulham Reach is located on one of the most dramatic stretches of the River Thames and set in beautifully landscaped gardens next to a sweeping riverside promenade and capitalises on the excellent riverside location overlooking the famous Harrods Furniture Depository with views that stretch across to Hammersmith Bridge and beyond.

Under previous employment, our staff provided services on the previous two phases consisting of approximately 200 private residential units.

The development includes an elegant boulevard linking the river with the adjacent park and offers restaurants, coffee shops and hotel style facilities including gymnasium, treatment rooms, wine cellar, virtual golf and snooker room.

The works have been delivered via a mixture of procurement routes. Traditional Design and build was used for the early phase with full fit out. In the later phases basis the shell and core was delivered design and build with the fit out delivered on a construction management basis via several separate packages.

Location: London SW6

Value: £90m

ST GEORGE CENTRAL LONDON LTD

Beaufort Park.

Beaufort Park is rapidly becoming recognised as one of North West London’s most exciting destinations, a new community designed for those who expect more from life. Reclaiming over 25 acres of the historically important but long neglected RAF Hendon Aerodrome site, Beaufort Park is a groundbreaking new mixed use development designed with imagination and style.

Under previous employment, our staff provided services for nine phases of the development.

Fulkers is currently providing services on three phases of this prestigious development. Our staff have delivered:

- Over 1,500 residential units comprising both private and residential social landlord units

- Parkland areas

- Retail and commercial units

- Health club

- Nursery

- The development has colourful render and clad façades with balconies and courtyards, plus private landscaped parklands

- Involved from inception to completion for the early phases of the overall development.

- Improved cash flows through our detailed analysis of the development programme. This includes ‘golden brick’ and other milestone payments to release funding from Registered Social Landlords. We also establish dates for sectional completion handovers for the private flats in order that the Client can serve occupation on the prospective purchaser, this in turn allows cash collection by the developer.

- Re programming of work packages to ensure the development is delivered on time. If delays should occur in the construction phase a detailed ‘target programme’ with the contractor is always produced and works are re programmed and then closely monitored thus enabling completion on time.

The works have been delivered via a mixture of procurement routes. Traditional design and build was used for the early phases with full fit out. In the later phases the shell and core was delivered design and build with the fit out delivered on a construction management basis via several separate packages.

ST GEORGE CENTRAL LONDON LTD

Location: London NW9

Value: >£120m

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.