Vision 2045 Downtown Las Vegas Master Plan

Page 335

APPENDIX 1 PLANNING CONTEXT Map 3: Proposed Location for Central City Intermodal Transportation Terminal

MOBILITY & INFRASTRUCTURE POLICY GUIDANCE A number of city-wide Plan Elements address issues of mobility and infrastructure. The Transportation and Transit Elements, as well as the Conservation and Parks Elements are chief among these, supporting the Land Use Element and offering additional policy guidance for Downtown. • Mobility: The Transportation Element stresses mixed-use development in the urban core, serviced by transit and multimodal transportation options. Similarly, the Transit Element promotes transit supportive densities and mixed use along transit corridors and within the Downtown. • Infrastructure & Sustainability: The Conservation Element promotes economic, environmental, and social sustainability, and encourages coordination between land use, transportation, and energy consumption, including support for alternative modes of transportation, urban forestry and improved building practices.

Proposed Location for Central City Inter-modal Transportation Terminal

Note: Urban Village is now Union Plaza Source: Central City Intermodal Transportation Terminal (CCITT) Draft Environmental Assessment, August 15, 2006

(Source: Transit Element, p. 32)

• Open Space & Environment: The Parks Element recognizes that the more established parts of the City are underserved by parks and recreation facilities; it advocates smaller scale public parks and plazas for Downtown, and supports alternative methods for funding parks. An urban pathway system and complete streets are recommended in the Trails Element.

3 to 4 acres of land, in a study area bounded by Casino Center, Bonneville, Garces, and First Street (see Map 3). RTC anticipates having amenities similar to the DTC with security provided by a private company. The CCITT would satisfy the needs of expanding transit services, while accommodating the city’s plan to develop an entertainment complex and museum adjacent to City Hall on the DTC site and adjoining land.23

Related Facilities

MAINTENANCE FACILITIES Presently, the RTC operates two maintenance facilities: the Integrated Bus Maintenance Facility (IBMF), located in North Las Vegas, which is owned by RTC, and the Tompkins Maintenance Facility, located in the southwest portion of the valley, which is leased from a private owner. 23 Central City Intermodal Transportation Terminal (CCITT) Draft Environmental Assessment, August 15, 2006

TRANSIT ELEMENT

Transit Element 2007;MPlan;indd;rs02/20/08

page 32

Solar facilities new Solar Facilities at at thethe New CityCity Hall Hall (Source: Conservation Element, p. 42)

CITY

US

95

11TH

4TH

9TH

10TH

MARYLAND

E OS LR

VEG AS LAS

Urban Trails

12TH

Urban Trails Multi-Use Transportation Trails

ME OG

BR

RS

ON

ER

OG

DE

N

IS

OG

11T

LEW

CA

K

FR

DE

EM

N

ON

T

ES

EV

ILL

E

H

BO NN

N

TOWER

E

ER

E

7TH

EA

RS

HO OV IDG

R

ER

CO MM

HO

DE

DOUGRAM

SS

ER

ON

CO OL

BO UL

ST

IR

CE

GA

RC

BRUCE

GA

17T

4TH

15T

AR

13T

UP

CL

H

IS

RY

IDG

9TH

T BD

Downtown Centennial Plan

E

H

INC

95

SQ UIT

RT

10T

EC

WA

RR

RAM

PN I15

PR

N

8TH

5 MLK US9

LEW

STE

DE

ON

H

RS

3RD

CA

H

L

MA

RA

1ST

NT

H

CE

14T

D

7TH

AN

6TH

GR RY

3RD

ML I15 N MP RA

MS

N

IN

S

RR

I15

SO

A

95

E

UP

S

CO VE

NZ

MCWILLIAMS

1ST

MP

K

RA

DIS

SQ UIT

HARRIS

HARRIS

13TH

ME

LIA

O WIL

TIF

SQ 95 UIT E

Map No. 4

WASHINGTON

WIL

NT

NY

LL

FA

BE

BO NA

ME

MC

CA

·

LM

EN

IN MA 1ST

PA

BILTM

ME

MO RE

ORE

CA

VERDY

4TH TIFFANY

SY

VETE RANS ME MORIAL

Photo courtesy Forest City

S GA S VE

7TH

LA

3RD

WENGERT

Modified: February 18, 2009 GPA-32130 Revised:April 18, 2012 GPA-44183

SWEENE Y

10TH

8TH

9TH

10TH

5TH 6TH

RD

LS

XFO

BRACKEN

BRACKEN

This Map replaces Map No. 7 of the Centennial Hills Sector Plan.

7TH

GRIFFITH

OAKE Y

7TH

CHICAGO

WYOMING

Adopted: January 16, 2002 Ordinance No. 5417

FRANKLIN

RE

FAIRFIE LD

NEW Y OR K

PARK PASEO

SWEENE Y

SE

IMPERIAL

UTAH

HO US

COLORADO CASINO CE NTER

COMME RCE

CALIFORNIA

IMPERIAL

6TH

3RD

CHARLES TON

City of Las Vegas assumes no liability regarding the current or future accuracy or modification of trail alignments depicted in surrounding jurisdictions. The jurisdictional alignments depicted on this map are for reference only and were accurate at the time this map was last updated.

IND

US

TR

IAL

PHILADELPHIA

ST LOUIS

GIS maps are normally produced only to meet the needs of the City. Due to continuous development activity this map is for reference only.

BOS TON

CINCINNATI

Geographic Information System Planning & Development Dept. 702-229-6301

FAIRFIE LD

TAM

BALTIMORE

CLEVE LAND

A faciliti City H proxim than $ tons f multip efficie enviro comp electr Plotted: November 08, 2012

T:\advplan\projects\projectsGIS\Trails\TrailsElemetMaps\Map4-UrbanTrails.mxd

Urban Trails

pag

PD-0005-03-13RS / TrailsElement

(Source: Trails Element, p. 47)

VISION 2045 DOWNTOWN LAS VEGAS MASTERPLAN |

335


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.