ņ
overmountain victory national historic trail master plan LAKE JAMES
MORGANTON
SUMMER 2015
"The landowner is the only person that can actually give this gift for the rest of eternity."
– Judy Perry, OVnhT TRAIL ENTHUSIAST
Overmountain Victory
National Historic Trail Master Plan L LAKE E N O IJAMES R > > >> MO RGANTON MORGANTON
Produced for US National Park Service Burke County City of Morganton
PRODUCED by
Destination by Design Planning, LLC | 815 West King Street, Suite 2 | Boone, North Carolina 28607 | 828.386.1866 | www.DbDplanning.com
WITH ASSISTANCE FROM
Acknowledgments National Park Service John Slaughter, Group Superintendent, Southern Campaign of the American Revolution Parks Paul Carson, Overmountain Victory National Historic Trail
north carolina wildlife resources commission Jason Creegan, Conservation Technician II Isaac Harrold, Program Manager
Burke County Johnny Carswell, Chairman, Board of Commissioners Wayne Able, Vice Chair, Board of Commissioners Maynard Taylor, Member, Board of Commissioners Jack Carroll, Member, Board of Commissioners Jeff Brittain, Member, Board of Commissioners Scott Carpenter, Deputy County Manager/Planning Director
Kip Hollifield, Land Management Biologist Ryan Jacobs, Wildlife Forester Nick Shaver, Technician Supervisor Gordon Warburton, Mountain Ecoregion Supervisor
City of Morganton Mel L. Cohen, Mayor John H. Cantrell, Jr., Mayor Pro-Tem Forrest A. Fleming, Councilman S. Sidney Simmons, Councilman Ronnie M. Thompson, Councilman Lee E Anderson, AICP, Director of Development & Design Services Michael Berley, PLA, Project Designer
Landowner Outreach Video Interviewees Senator Jim Broyhill John Slaughter, National Park Service Ben Griffin, Landowner Merlin and Judy Perry, Trail Enthusiasts
contents
Table of Contents
introduction 1 Background 2 Plan Goals
3
Planning Process
4
Plan Organization
5
Chapter 1: Existing Conditions, Analysis, and Preliminary Alignments Study Area Description
Signage and Wayfinding
38
Social Media: The New Word of Mouth
40
chapter 4: recommendations
41
Planning Sections Overview
42
Trail Sections Recommendations
44
7 8
Chapter 5: implementation
59
The Natural Environment
10
Implementation Details by Section and Responsibility
The Built Environment
13
Priority Implementation Areas and Responsibilities
61
Map And Photo Series: Preliminary Trail Route Alternatives
19
Trail Support Spectrum
62
Chapter 2: landowner engagement
27
60
Appendix 63
Identifying the Landowners
28
(A1) Budget
64
Landowner Communications
29
(A2) Fact Sheet
65
Landowner Workshop
30
(A3) Landowner Letter
65
Trail Route Re-Evaluation
32
(A4) Landowner Interest Survey
66
(A5) Funding Sources
66
33
(A6) Warrior Fork Greenway Easement
67
Trail Types
34
(A7) Crescent Resources / Warrior Fork Greenway Easement
68
Trail Types Profile
36
Chapter 3: trail character & Design guidelines
vii
contents
list of maps
List of Exhibits
Map 1: OVNHT Commemorative Motor Route
2
Exhibit 1: McDowell House/ Quaker Meadows
18
Map 2: General Study Area
8
Exhibit 2: Trail Type Profile
36
Map 3: Study Area 1 Site Analysis
20
Exhibit 3: Social Media
40
Map 4: Study Area 2 Site Analysis
22
Exhibit 4: Lake James Family Campground
46
Map 5: Study Area 3 Site Analysis
24
Exhibit 5: Powerhouse Bridge
47
Map 6: Landowner Database
28
Exhibit 6: Bridgewater Access Improvements
47
Map 7: Landowner Sentiment
32
Exhibit 7: Off the Road Again @ Powerhouse
50
Map 8: Planning Sections Overview
42
Exhibit 8: Watermill River Access Enhancements
51
Map 9: Planning Section
45
Exhibit 9: Grace Ridge Trailhead
56
Map 10: Planning Section 2
49
Exhibit 10: Highway 18/64 Trailhead
57
Map 11: Planning Section 3
53
Exhibit 11: Implementation Details by Section and Responsibilities
60
Map 12: Planning Section 4
55
Exhibit 12: Trail Rubicon: Finding the Point of No Return
61
Exhibit 13: Priority Implementation Areas and Responsibilities
61
Exhibit 14: Trail Support Spectrum
61
ix
introduction
the overmountain victory national historic trail is 330 miles in length and includes portions of virginia, tennessee, north carolina and south carolina. The trail commemorates the significance of the patriot militia that marched over the appalachian mountains to defeat the BRITISH-LED loyalist army at the battle of kings mountain on october 8, 1780.
This trail master plan SERVES AS A ROAD MAP FOR ESTABLISHING A seCtion of the overmountain victory national historic trail (ovnht) IN NORTH CAROLINA from Lake James to the city of morganton.
introduction
background In 2014, Burke County successfully secured partnership funds from the National Park Service (NPS) and provided additional funding to develop a comprehensive trail master plan for the Catawba River corridor from Lake James to Morganton. The NPS willingly provided funding for this trail initiative because it was along this corridor that in 1780 the “Overmountain Men” marched on their way to the Battle of Kings Mountain where they defeated a British led army to “turn the tide” of the Revolutionary War. It is expected that trail developed along this corridor with permanent protection measures in place (easements, fee simple, right of way, etc) will be certified by the NPS as part of the Overmountain Victory National Historic Trail.
map 1: ovnht commemorative motor route
To be certified as part of the Overmountain Victory National Historic Trail, the trail segment must be constructed within onehalf mile of the historic route taken by the patriots. Ongoing research, including segments of the Yellow Mountain Road, continue to be explored as additional routes possibly used by some Overmountain Men, yet are not recognized as part of the official historic route as determined by the congressionally appointed advisory committee, therefore not eligible for certification. For the purposes of this plan, the study area recognizes the current NPS designated historic route and extends one-half mile on either side of the Catawba River.
Burke County and Morganton: A History of Trail Development Since the creation of the Lake James State Park in 2004, the North Carolina Division of Parks and Recreation has worked to create and expands its trail network throughout the park. Burke County officials, aware of the quality of life benefits and economic impact associated with trail development, have also become immersed in the creation of a trail system – the Fonta Flora Trail – to loop the whole of Lake James. This trail is being spearheaded by Burke County leadership, but will ultimately become part of the NC park system. The City of Morganton has worked for more than two decades to create a greenway system that parallels the Catawba River. The Catawba River Greenway now extends nearly four miles and connects many of the City’s parks, schools, and business areas. Portions of the trail systems at both Lake James and within the City of Morganton are certified as part of the Overmountain Victory National Historic Trail. This plan strives to unify the OVNHT along the Catawba River corridor.
2
The Sister Plan
lenoir
lake james
morganton
This trail plan was developed in conjunction with another Overmountain Victory National Historic Trail master plan that extends along the Lower Creek Corridor from Lenoir to Morganton. Although two separate plans were developed, the planning process was combined for the complete corridor from Lake James to Morganton to
This plan's study area This trail section spans from Lake James to Morganton.
introduction
plan goals
a critical component of this plan was landowner outreach.
1 2 3
Specific Trail Routes. Identify a specific and
feasible trail route within a 1/2 mile of the known historic Overmountain Victory National Historic Trail as determined by NPS;
4
Support Other Community Goals. Identify
5
Social Media. Incorporate modern social me-
Landowner Outreach. Make a direct appeal to
landowners identified during the analysis and record their sentiments for providing a trail easement;
Visual Plan. Create a visual plan that provides
opportunities to leverage trail development to further support other community goals, including economic development, historic preservation, public health, and environmental stewardship; and
dia marketing tools within the trail and signage infrastructure to promote the development of “user generated� marketing content.
renderings and schematics to demonstrate trail character;
3
introduction
planning process about the trail project. After receiving comments from landowners, the preliminary trail routes were revised accordingly.
The consultant team met with local trail and government leaders to discuss general environmental constraints and opportunities for trail connectivity.
fact sheet
4. Plan Development | March – May 2015
Research | October – January 2015 The consultant team conducted a thorough environmental site analysis of the study area and determined feasible trail route options. With the trail routes identified, a landowner contact list was developed.
5.
3. Landowner Outreach | February – March 2015
FACT SHEET
The consultant team worked in tandem with local leaders to develop a preferred trail alignment. Renderings and schematics were provided to visually support the trail recommendations. Final Plan Preparation | May – July 2015 Publish the Final Plan for review by the public and elected officials.
Landowners with property along an identified feasible trail route were invited to a special meeting to learn more
A trail master planning effort is underway to help create a section of the Overmountain Victory National Historic Trail (OVT) that would connect from Lenoir to Morganton to Lake James!
BACKGROUND
2.
Direction Setting and Project Launch | September 2014
Thanks to grant support from the National Park Service, regional community organizations and local governments are working to establish a walking and leisure biking trail that connects the region and celebrates the trail walked by the Overmountain Men who won a major Revolutionary War battle at Kings Mountain in 1780. The trail planning process requires an analysis of the Lower Creek corridor in Caldwell County and the Catawba River corridor in Burke County. The trail is best suited in floodplain areas where development generally cannot occur and where there are meaningful connections to existing parks, civic buildings, and neighborhoods. After identifying feasible trail route options, there will be a major landowner outreach effort. Without the voluntary commitment from landowners, the trail will either be relocated or not constructed.
An educational video will be developed to help communicate the historical significance of the OVT, which will be made available online.
THE PLANNING PROCESS
1.
www.OVTplan.com
1 Direction Setting and Project Launch
| September 2014 The consultant team will meet with local trail and government leaders to generally discuss environmental constraints and opportunities for trail connectivity.
2
Research | October – January 2015 The consultant team will conduct a thorough environmental assessment of the study area and determine feasible trail route options. With the trail routes identified, a landowner contact list will be developed.
3
Landowner Outreach | February – March 2015 Landowners with property along an identified feasible trail route will be invited to a special meeting to learn more about the trail project. After receiving comments from landowners, the preliminary trail routes will be updated.
4
Plan Development | March – May 2015 The consultant team will document the trail analysis and landowner comments. Recommendations will highlight alternative routes and the project’s overall feasibility for completion. A draft plan will be made available for public comment.
5
Final Plan Preparation | May – June 2015 The consultant team will publish a final plan that incorporates all public comments.
CONSULTANT CONTACT: Eric Woolridge, AICP Destination by Design Email: Eric@dbdplanning.com Phone: (828) 386-1866 Web: www.DbDplanning.com
A project fact sheet provided interested parties with background information and a project timeline.
•Physical Inventory •Physiographic Analysis •Natural Inventory •Points of Interest & Structures •Environmental •Infrastructure & Utilities •Video Development
•Public Meeting & Engagement •Landowner Outreach Workshops
MARCH - MAY ’15 •Design Alternatives •Wayfinding & Structural Elements •Branding S I G N A•Opinion G E C O N C of E P Probable T Cost •Route Feasibility •Landowner Follow-up
DRAFT PLAN, DESIGN CONCEPTS, COSTS
•Kick Off •Facilitating Planning Oversight Committee
FEB. - March ‘15 PUBLIC ENGAGEMENT & LANDOWNER OUTREACH
OCT. ‘14 - JAN. ’15 RESEARCH AND PRELIMINARY ANALYSIS
DIRECTION SETTING
SEPT. ‘14
CRAFTSMAN
PLACE YOUR VOTE HERE:
C A B
LD K
EL
R
W
U E
L
C
C
O
O
U N
MA
4
MA
P 4
P 3 MA
-M 1/2
i le
Bu
f fe
MA
P 2
MAP
1
Lenoir
r
Morganton
´ 0
P 5
Y
TY
7
T
MAP
N
9 M AP 8
U
MAP
1/
5
2 -M
i le
B
uf
fe
r
10
P MA
6
20 Miles
OVERMOUNTAIN VICTORY NATIONAL HISTORIC TRAIL
OVT TRAIL MAP
Overmountain Victory
National Historic Trail Master Plan LEN
OIR
E JAM • MOR GANTON • LAKE
S
MAY-JULY ’15 FINAL DRAFT DEVELOPMENT
project timeline
•Funding •Implementation
introduction
Lake
Lake James State Park
D
15
US ER
NC 126
HO
HT & Other Recreation Overmountain Victory NH Trail
MAP 2
James
pT rail
OVNHT 1/2-Mile Buffer
Bridgewater Powerhouse
START OF STUDY AREA
Existing Trails Proposed Trails Fishing Access Parks Golf Courses
Lake James
1 1
ged Lands
WE R
Constraints
Plan Organization
Lake James State Park Loo
PO
Opportunities
8
es
N
0
am
Trail
eJ
Loop
Lak
14 13
Federal & State Ownership Private Municipal/County Owned Properties
Chapter I.
Chapter iii.
Brownfields Inactive Hazardous Sites
Element Occurrence: Dwarf-flowered Heartleaf Bridgewater Fishing Access
Active & Inactive Landfills
Natural Heritage Data
Lake James Family Campground
4
Element Occurances Plant
Animal Assemblage
10
Paddy Creek Dam
16
2
Animal
Catawba River Dam and Truss Bridge
Natural Community
3
Natural Heritage Areas
Exceptional
Moderate
Very High
General
High
Unranked
ology
Wetlands (NWI) Hydric Soils Waterbodies
Lake James State Park
SE
12
RD
OU
3
BE
NF
IE
W
H ER
LD
S
N
LA
ND
IN
G
PO
Element Occurrence: Dwarf-flowered Heartleaf
RD
2
5 5
Existing Conditions, Analysis, and Preliminary Alignments Catawba R iv
Trail Character and Design Guidelines
10
10
11
3
10
Streams
er
5
Flood Zones
Floodway 100-Year Floodplain 500-Year Floodplain
DR VE
This chapter is dedicated to visually defining the various trail types to be used throughout the corridor. Also, design concepts are provided for trail user orientation signage, mile markers, historic markers, and other trail support facilities. Social Media is CANAL BRIDGEexplored as a mechanism POWERHOUSE RD. for trail promotion and marketing.
k
W AT
R
JO
DR
T LS Y AURE L DR IV
WAY
PL
ESS T IN
D
W AY
T DR
GA FO TEER CT
R
EC LR
ID G
LAUREL AV B BARTLETT START LE TT IDRIDG E AV EWAY AV ST
RE LA U
FLOR A T RAIL
D ER
OW
US ER
HO OW
7
LA K
FONT A
LLR ODW
LO OW
LOLH
OO RW RW I LL IL H
H
RT
ST ER CK DR WDU ORC TKH W LNO
WW HHI PP IP
CA LA N
DU
TE
13 CO RP E O
R
DR ARKK PA E VI
N PE
C GN NI IN
NA DNR
MM CCC
R ATE EW
CLEL
LEL
IDG
LAL
BR
PA RK
D R EL ELAP APH HC
EW
R BA
JE DA
N
W
OO
GE W CH ATER RD IG GE R ST
1.0 MI.
BR ID
Wet Lowland
1/2
23
G
RO
1/4
DR I TE H IW
C
L
The final chapter is organized according to four (4) planning sections. EachLEGEND planning section description includes a map that identifies a preferred alignment. Each planning section further incorporates the analysis and design elements from the previous chapters along with a host of supporting renderings and design schematics.
0
WH
RR
T C
LNOW LL
EE HO PY LLOW HO
SLEE SL PY
S
CK
12
IEW
G
R
N
RR
24 11
EV
VE RI
3SUNSET RD
E
K
LAK
BA W TA CA
7
C
6
14
SE RD
D
LO
N
BEACH W/ VISTA
RI VE
G
OL M EO
H EMHL
LA ND I
BA
E
ELD S
VISTA (POSSIBLE PRIMITIVE CAMPING)
22
R H OU
15
21
US
BE N FI
S G GNS INRI 8 PRSP
6
17
N LA
PO WE
4
16 PADDYS CREEK DAM
CA TA W
R
R
D
18
LAKE JAMES FAMILY
10 CAMPGROUND
HO ER
9
20 W PO
5
NP
H
N
BRIDGEWATER PUBLIC RIVER ACCESS
PO OIN ELEL P RR UU LLAA
5
R
E ST CA
Recommendations
CT CK CK LO LO M HE EM
Narrow Bridge
Potential Trailhead
Bridge Has Ample Deck Width (Photo Taken of Deck) '19
R ED INT TE
4
6 12
Bridgewater Public Fishing Access
E
F
3
HOLI DA Y S
Chapter iv. 2 POWERHOUSE BRIDGE
RD
G
N
HO
RD G IN G ND LA DIN S N LD LA IE NF DS BE EL I
BE
2
T
BRIDGEWATER DAM
STREAM SID E LN
CONLEY BUMG ARN
OOR CT
IN
E
R RD CONLEY BUMG ARNE R
CRESTM
EA ST SOUTH SHORE DR PO
ID
T
EXISTING CANAL BRIDGE PUBLIC ACCESS
V
RD
Landowner Engagement
N EL
ER
TC
F KE
OR AK RE DR S
1
C
COT
SE OU RH
NP
DR ES
LA
VE
VE CO
2
CANAL BRIDGE TRAILHEAD
CO
EP
Chapter Ii.
PO INT
OR
WOOD DUCK LN
LAKE JAMES
NORTH
1
NORTH LID SHO R AY E DR SH OR ES AV
EF
EASTS
K LA
1
Trailhead / Future Improvement Area
Significant efforts were made to reach out to landowners where the preliminary analysis indicates that the trail is most suitable. This chapter describes the landowner outreach process and provides highlights from the landowner workshop meetings.
SO
KE
RD E PARK E PARK
EXISTING OVT
EP DE
CANAL BRIDGE
Greenway Study
IN D
E CRES
BU R
CT
GAG CO TATT
70
DE
ST SS ST DR L BA IL ON E EST PH P FIR CAM
MAP 1
T LA SE KE EV VO ST GOR ST GR E N I N AI UC T R MMA SP TS R E O SH E
M HE
ACCESS
N
T
7
Muddy Creek Historic RR Bridge
NTY
U L CO
NTY
L OWE
U E CO
MCD
K BUR
Site Analysis untain Victory al Historic Trail
9
TO
CANTERBURY
W
W ERF AT O RD
ree
yC
ed
N
8
So
rn
he
ut
lk
fo or
PROPOSED LAKE JAMES STATE PARK HIKING TRAIL
PR OP OS ED
8
5
RR
Re
Historic Bridge
SA N
6
DY
SECTION 1
9
7
RE
6
MAP 1
AS H
CO
r This chapter provides a comprehensive overview and analysis of the opportunities and constraints found throughout the study area. The analysis begins with a brief description of the study area followed by a comprehensive discussion of the natural and built environments and their implications for trail suitability, trail design features, permitting, costs, etc. This chapter concludes with a map and photographic series that highlights a host of preliminary trail route alternatives. WATERMILL RIVER Rive
HO
wba
MALLARD COV E DR
Cata
LINVILLE AV
Old 4
BE S
SI E
DS
TRAILS
RA YS
DA
TRAIL FEATURES
ALTERNATE TRAIL ROUTE
RP
EN
ING
RD
YES
TRAILHEAD
¯
CROSSINGS
SPUR TRAIL
#
ROAD CROSSING
EXISTING LOCAL TRAIL
#
MAJOR BRIDGE
PROPOSED LOCAL TRAIL CO
LANDOWNER SENTIMENT
IR Y
AV TRAIL ROUTE PREFERRED
#
NO
POSITIVE
MINOR BRIDGE/ CULVERT
0
NO RESPONSE
5
0.225
0.45 Miles
RD URCH 1 in = 0.29 miles HILL CH SNO W ROY MCGALLIARD AV CHURCH RD NC OneMap, NC CenterSNOWHILL for Geographic Information and Analysis, NC 911 Board
introduction
6
Chapter 1 Existing Conditions, Analysis, and Preliminary Alignments
a comprehensive overview and analysis of the opportunities and constraints found throughout the study area.
The analysis begins with a brief description of the study area followed by a comprehensive discussion of the natural and built environments and their implications for trail suitability, trail design features, permitting, costs, etc. This chapter concludes with a map and photographic series that highlights a host of preliminary trail route alternatives.
I n t h is c h ap t e r A. Study Area Description B. Natural Environment Analysis C. Human/Built Environment Analysis D. Map, Photo, and Preliminary Trail Route Alternatives
chapter 1
MAP 2: general study area
study area
Study Area description: The Lake James to Morganton OVNHT study area is one-mile wide and extends approximately 20-miles long from the Highway 126 Bridge at Lake James to the proposed Grace Ridge Trailhead near Rocky Ford Access in the City of Morganton. Starting at Lake James State Park, the corridor extends west through large tracts of rural agricultural land primarily owned by two landowners: Duke Energy and Crescent Resources, which continue to partner with Burke County to provide for trails and portions of the OVNHT. The planning corridor follows the Catawba River east, transitioning to a mix of large tracts of privately owned land and residential subdivisions. Located on the south side of the Catawba River is Glen Alpine, a small municipality whose jurisdiction intersects with portions of the study area. Along the north side of the river is the historic Swan Ponds property, which is part of the Preservation North Carolina program. The Upper Catawba River Trail, which provides for a series of river access areas throughout the study area, serves as a foundation for the river’s recreation offerings. Land parcels become smaller as the corridor continues toward the City of Morganton before reaching the 3.8-mile Catawba River Greenway, which is officially designated as part of the Overmountain Victory National Historic Trail.
The Lake James to Morganton OVNHT study area is one-mile wide and extends approximately 20-miles long from the Highway 126 Bridge at Lake James (canal bridge) to the proposed grace ridge trailhead near the rocky ford access in the City of Morganton. 8
EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS
analysis workflow alternate trail routes were determined based on an analysis of the natural and built environments.
SIT EN M N O R I V EN
T
EN M N O R I V EN
E A N A LY S IS
T 9
chapter 1
The Natural Environment The opportunities and constraints found within the natural environment are critical for determining suitable trail locations and feasibility, ideal user experiences, construction costs, and necessary permits. This section explores the implications of the study area’s natural environment for establishing the Overmountain Victory National Historic Trail from Lake James to Morganton and includes five (5) parts: 1) Floodplains; 2) Wetlands and Hydric Soils; 3) Streams, Lakes, and Ponds; 4) Steep Slopes; and 5) Rare Flora and Fauna.
photo: visitnc.com
10
EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS 4
“Within this study area, much of the floodplain areas along the Catawba Creek corridor are ideal for greenway development.�
photo by others
Floodpl ains Floodplain areas provide both an opportunity and constraint for trail development. Since traditional development is often not suitable within floodplain areas, private landowners are often more willing to provide access for public trails within these areas. Also, these scenic areas often attract wildlife, which creates an engaging trail experience. Within this study area, much of the floodplain areas along the Catawba Creek corridor are ideal for greenway development. Although development is regulated within the floodplain, greenways and trails are allowed and can be permitted. Sound trail engineering techniques are necessary to ensure trails can sustain flooding. To the extent possible, greenway alignments should be avoided within the floodway2.
Wetl ands and Hydric Soils
Streams, Lakes, and Ponds
The study area includes several wetland areas as identified on the National Wetland Inventory (NWI). According to NWI, there are likely smaller wetland areas within the study corridor that are not indicated within their inventory that could impact final trail alignments. Hydric soils in combination with wetland plant species and wetland hydrology are considered indicators of a wetland, which require costly permitting if impacted3.
TThe County, State, and Federal government regulate the many waterbodies found throughout the study area4. The Catawba River is the dominant waterway within this corridor. Canoe Creek, located to the west of Morganton, is a tributary of the Catawba that serves as a possible trail corridor.
If wetlands are unavoidable, utilize elevated boardwalk systems. Boardwalks allow for travel over flat, poorly draining soils, standing water, and wetland features and have significantly less impact than other options. A section 404 (Clean Water Act) Permit may be required if the wetland is considered jurisdictional by the USACE. This means that the wetland is not isolated and part of a broader lake or water system. A small boardwalk for a non-isolated wetland with limited fill or dredging may qualify for a programmatic Nationwide Permit. Nationwide Permits are designed to streamline the permitting process for actions with limited disturbances. In addition to permitting, disturbances exceeding a tenth ( 0.1) of an acre would require mitigation which can increase project costs. Impacts under a tenth (0.1) of an acre do not trigger mitigation fees.
3
Maintain a 50-foot buffer from all waterways, particularly those regulated under the Catawba River Buffer Rules. The state requires a 50-foot buffer along the shorelines of Catawba River and associated lakes. Streams within the study area are identified by the State of North Carolina as having poor water quality and maintaining or improving an adequate vegetated buffer is crucial to improving the quality. Zone 1 of this buffer includes an undisturbed 30-foot buffer from top of bank in which trails are discouraged. Zone 2 is an additional 20-foot buffer. This zone allows for managed vegetation and trails and greenways. While trails are an allowable use within Zone 2, the NC Division of Water Quality requires a permit (through DWQ or designated local government). The applicant must show that disturbance has been minimized and no other alternatives exist.
4
Avoid disturbance in the floodway. Avoid placement of structures or disturbance within the floodway. Floodways are regulated locally and by the Federal Emergency Management Agency (FEMA). Fill, structures (walls, kiosks, etc), and impervious services are discouraged. Any structures located within the floodway require a no-impact/no-rise certification through FEMA. These studies can vary on cost but can range from $2,500-$15,000 depending on complexity.
2
11
chapter 1
Steep Slopes
Rare Flora and Fauna
Much of the corridor has gently rolling topography. The most challenging slopes will be along the banks of the Catawba River near the Glen Alpine area and Lake James. The trail should be designed for grades under 5% slope if possible. Natural surface trails can vary up to 10% slope. In steeper areas, this will be a design challenge. Alignments proposed in this study should be designed with these guidelines and may require a larger corridor to incorporate a more gradual trail grade.
The State Natural Heritage Program provides data identifying the state’s most sensitive environmental areas to be avoided; these areas are incorporated within the analysis map series at the end of this chapter. Also, rare flora and fauna species can also exist outside of these designated areas, which can alter final trail alignments prior to construction. Species identified by the State Natural Heritage Program within this study area as of January 2015 include5: Coordination with the U.S. Fish and Wildlife (USFWS) is an important aspect of the design process. Involving USFWS early on in the process can help avoid potential planning obstacles related to federally protected species. Additionally, permits like Section 401 and 404 (described above in Wetland and Streams) will initiate the review of the State Natural Heritage Program database. If species are found within the project area, State or Federal requirements may dictate avoidance or mitigation. photo by others
A. Dwarf-flowered Heartleaf (see Map 1, found on Duke Energy held lands) B. White Trillium (see Map 2 recorded to be in the larger Glen Alpine area) C. Carolina Foothills Crayfish and Eastern Creekshell (see Map 3, found along the Catawba)
12
EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS
the built environment The opportunities and constraints found within the built and human environment are critical for determining suitable trail locations and feasibility, ideal user experiences, construction costs, and necessary permits. This section highlights five (5) built environmental features and their implications for developing the Overmountain Victory Trail from Lake James to Morganton, including: 1) Land Use; 2) Existing Trails and Parks; 3) Utilities; 4) Transportation; and 5) Historic Resources.
photo by others
13
chapter 1
land use snapshot
“The western extent of the study area is typified by a rural wooded landscape with large tracts of land.� Central Section The central section of the corridor has a mixed of both large tracts and small tracts, many which serve second-home owners. Many of the large landowners have owned their property for multiple generations, while smaller tracts have been purchased for retirement or personal retreats. Throughout the planning process, both of these groups described issues with trash and other problems with the general public and river users. This history serves as a barrier for obtaining trail easements.
Western Section
The City of Morganton
The western extent of the study area is typified by a rural wooded landscape with large tracts of land, many which are owned by Crescent Communities, Duke Energy, NC State Parks, and family trusts. Many of these large tracts are leased as tree and plant nurseries. The fertilization of these crops must be considered when providing for public trails.
The City of Morganton and its western edge is typified by single-family residential growth. Dense pockets of land development create a challenge for creating a public trail.
14
EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS
existing parks and greenways
“Burke County and Morganton have a collection of parks and greenways that serve as ideal locations for trail connections.�
Bridgewater Fishing Access This public fishing access area and canoe launch is owned by Duke Power, which has plans to further improve the site.
Burke County and Morganton have a collection of parks and greenways that are ideal for trail connections. Some of these major assets include:
Watermill River Access This public fishing access area near Glen Alpine is owned by Burke County. photo: visitnc.com The Proposed Fonta Flora State Trail
Lake James State Park
Canal Bridge Public Access
The Fonta Flora State Trail will provide for a complete loop around Lake James. This trail was designated in 2015 as an official state trail by the NC General Assembly. Portions of this trail will also serve as certified sections of the OVNHT.
This state park is one of the most significant linkages throughout the planning corridor and serves as the western terminus of the study area.
NC State Parks curently manages the Canal Bridge Public Access which is located near the western terminus of the study area. Although the access is a significant asset within the planning corridor, NC Department of Parks and Recreation Administrative Code does not allow any boating access area to serve a dual purpose such as providing for an OVNHT trailhead.
City of Morganton Parks and Greenways The City has many parks and greenways to connect, such as the Catawba River Greenway, Freedom Park and Greenway, Catawba Meadows Park, Rocky Ford Access, and the Catawba River Soccer Complex.
15
chapter 1
utilities
Transportation
The study area has a complex matrix of utilities that include transmission lines, utility towers, water lines, and sewer infrastructure. Both sewer and water lines are indicated on the subsequent map series. However, the maps do not include transmission lines. Locations where the potential trail alignment intersects with sewer or water lines have been indicated on the map and notes (ie. Canoe Creek). Sewer lines are often compatible with trails since existing easements preclude development. However, the easement will often need to be modified to provide for a public trail.
The study area analysis including an extensive review of the existing transportation network including the North Carolina Department of Transportation (NCDOT) rightof-way (ROW), NCDOT plans, existing bike and pedestrian infrastructure (crosswalks, bike lanes, etc.), railways, and existing greenways. NCDOT’s right-of-way was analyzed for the ability to accommodate a trail alignment or accommodate a widened shoulder. These opportunities are shown on the Site Analysis Maps with corresponding opportunities and constraints notes.
16
Norfolk Southern has an operational rail on south side of the Catawba River. If this rail were to ever become abandoned, a significant opportunity would exist to establish a considerable section of trail. The right-of-way and adjacent lands were analyzed as a potential future route, as illustrated in the maps and notes.
EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS
historIC rESOURCES
“the ovnht should link, preserve, and interpret historic and cultural sites along its route.� The Overmountain Victory National Historic Trail Route and Buffer The original Overmountain Victory National Historic Trail (OVNHT) route was identified by a National Parks Service research team. The team relied on the 1881 account of the march, which has been amended by local historians, descendent of battle participants, and other sources. As part of this congressionally designated trail, any officially designated portion of the OVNHT must lie within a one-mile corridor (half-mile on either side) of the historic route. Sensitive Cultural Resource Areas Culturally sensitive resource areas have been mapped based on input from the NC State Historic Preservation Office (SHPO). The majority of these areas are recorded along the Catawba River. These sites should be avoided due to the possibility of historic resources that could be destroyed with ground disturbance6.
Historic Sites and Landscape SHPO oversees a large database of historic sites and resources. All resources, including those related to the OVNHT, are included within the subsequent analysis map series. These resources include information from SHPO surveys as well as a large list of sites related to the National Register of Historic Places (which the National Park Service oversees but individual States manage). The most critical sites include those listed on the National Register (NR) or determined eligible (DOE) as they have further protection under Section 106 of the National Historic Preservation Act . The National Park Service has emphasized that as part of this study and trail development, that historic/cultural resources should be linked, preserved, and interpreted. Specific resources that directly relate to the history of the Overmountain Victory National Historic Trail are noted within the subsequent analysis maps and notes and include:
photo by others Charles and Joseph McDowell are buried along with several other revolutionary war soldiers.
Lake James Historic Farm Houses. Several farmhouses are considered historic including, the Benfield Farmhouse, the Rust House and Perkins Store (which currently serves as a Bed and Breakfast), and the Perkins Farmhouse.
Swan Pond. Swan Pond was settled as a plantation just after the Revolutionary War by war veteran Waightsville Avery, an influential political leader and early white settler of Western North Carolina. Waightsville represented Burke County as a legislator for many years and is perhaps most famous for a supposed duel with President Andrew Jackson. The current house was built in 1848. Several generations of Averys lived on the property and influenced in the region. Swan Pond is still intact as a large private estate.
McDowell Hosue/ Quaker Meadows. (See exhibit on the following page.) Quaker Meadows Cemetery. Quaker Meadows is identified as one of the earliest known sites associated with white settlement in Western North Carolina. The Quaker Meadows Cemetery served as the cemetery to the first settlers in the area, was utilized between 1767 and 1879, and includes over 61 marked grave sites.
Sensitive Cultural Resources and Permitting: Any construction funded or permitted by the federal government will trigger a project review by SHPO of any resources covered under Section 106 (National Historic Preservation Act). These resources could include human remains, burial sites, archeology sites, and historic sites. If it is found that the action of trail construction could potentially adversely affect cultural resources, the SHPO will work with the related Federal Agency to eliminate or minimize the effect. 7 Historic Sites and Permitting: In general, a greenway would have no effect or a complimentary relationship to preservation of these 6
17
Exhibit 1: McDowell House /Quaker Meadows
chapter 1
mcdowell house/ quaker meadows
q
uaker Meadows was settled as a plantation around 1760 by Joseph McDowell and was inherited by Joseph’s son, Charles. Charles was a colonel in the Revolutionary War in 1780, in which he led the large encampment of Overmountain Men to stay on his estate (that included Quaker Meadows). He was a critical leader that laid plans to attack the British at the Battle of Kings Mountain. The original
18
house no longer exists, but the house on-site today was built by Charle’s son in 1812 and is the oldest existing brick house in Burke County. The restored house currently belongs to the Historic Burke Foundation. It is the meeting place for Overmountain Victory National Historic Trail re-enactors who commemorate the 1780 encampment every September. The original Quaker Meadows Plantation now includes
portions of the county fairgrounds, golf course, and some commercial areas. The meadows hosted a major encampment in 1780 for over 1,400 of the Overmountain troops. It is said that commanders met and planned the attack on loyalists under a large oak, now termed the Council Oak. A commemorative plaque and young oak now grows where the Council Oak once stood.
EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS
map and photo series: preliminary trail route alternatives
The map and photographic series, which spatially incorporates the natural and built environment analysis, highlights a host of preliminary trail route alternatives. These routes were further refined by local leaders to identify and engage landowners. This information will serve as an ongoing reference guide as alternative routes may need to be developed due to unforeseen barriers.
38
Constraints
Connectors
Property Lines
Alignment ‘A’
50
Opportunities
Duke Energy Properties
Alignment ‘B’
38
Constraints
Crescent Resources Properties Civic Landmarks
20-Foot Contours
Private Municipal/County Owned Properties
Colleges and Universities Schools
NRHD Boundary Local District Center Point
Element Occurances Plant
Study List (SL)
Animal Assemblage
Lake James State Park
OVNHT & Other Recreation Overmountain Victory NH Trail
20-Foot Contours County Boundary
Property Lines
Proposed Trails
Duke Energy Properties
Inactive Hazardous Sites
Waterlines
NR and Local Landmark
Active & Inactive Landfills
Sewer
NRHD Boundary
State Natural Heritage Data
Local District Center Point
Element Occurances Plant
Study List (SL)
Animal Assemblage
SL and Landmark SL and Determined Eligible (DOE)
Animal
Exceptional
Moderate
Very High
General
High
Unranked
Hydrology
Wetlands (NWI)
Bike Route
Hydric Soils
NCDOT Bridge Locations
Waterbodies
Rail Roads
100-Year Floodplain
3
Lake James State Park
3
NF
ER
W
IE
LD
S
N
LA
ND
IN
G
PO
E
US
HO
BE
Element Occurrence: Dwarf-flowered Heartleaf
5
5
500-Year Floodplain
Utilities
Waterlines
10
r
Site Analysis Overmountain Victory 9 National Historic Trail
7
26
eC
re
ek 32
28
29
RO
Freedom Park & Greenway
Freedom High School
64
Collett St. Rec. Center & Martha Park
END OF STUDY AREA
West Street Historic District
33 Catawba River Soccer Complex &Greenway Loop
Morganton 70
30
ver
12
14 POW
26
ERHO
USE
WN
ESTO
WEST MORGANTON 25
Site Analysis Overmountain Victory National Historic Trail
RD
rn
the
ou
lk S
rfo
No
MAP 3
AD
RO
Forest Hill Elementary School
k lver Cree
Si
END OF STUDY AREA
Lenoir to Morganton Greenway Study Glen Alpine Elementary School
RR
k
6
Rive
18
70
ree
wba
18 13
Catawba Ri ver 18 Catawba Ri
27
yC
Cata
11
ed
Old 4
MAP 2
31
JAM
Re
Sewer
11
10 11
GREATER GLEN ALPINE
100-Year Floodplain
Swan Pond (Easement: Historic Preservation Foundation)
16
15
Floodway
Local Roads State and County Roads State Roads
28
Glen Alpine
16
10
no
24
10
17
5
Ca
27
25
RD
2
126
23
Swan Pond (Easement: Historic Preservation Foundation)
24
12
RD
3
Flood Zones
Interstates
17
500-Year Floodplain
Streams
Roads/Interstates
23
17
Element Occurrence: Dwarf-flowered Heartleaf Bridgewater Fishing Access
Paddy Creek Dam
Catawba River Dam and Truss Bridge
Natural Heritage Areas
Transportation
Lake James Family Campground
4 2
Natural Community
SL, DOE, and Landmark DOE NRHD Surveyed Surveyed in NRHD Site Gone Sensitive Cultural Resources
Floodway
Utilities
Brownfields
National Register (NR) of Historic Places Site National Register Historic District (NRHD)
22
14 13
Flood Zones
31
r
Schools Historic Sites and Ditricts
Streams
Local Roads State and County Roads State Roads
Avery Avenue Historic District
181
31
ve
Interstates
22
Waterbodies
ML King Park
126
35 34
Ri
Roads/Interstates
Private Municipal/County Owned Properties
21
36
ROAD
a
Federal & State Ownership
Public Libraries
500-Year Floodplain
Sewer
Hydric Soils
NCDOT Bridge Locations
26
Element Occurrence: Carolina Foothills Crayfish, Eastern Creekshell
Floodway
100-Year Floodplain
Waterlines
Wetlands (NWI)
Bike Route
Rail Roads
Public Health Departments Colleges and Universities
SE
Transportation
1
STEE
HW
Flood Zones
Utilities
18
DOCA
Catawba River Access Area
20
Quaker Meadows Cemetery, Circa 1767-1879
Y1
23 Y 126
Waterbodies
Quaker Meadows Golf Course Cascade Park
HW
29
126
Unranked
Wetlands (NWI)
Local Roads State and County Roads State Roads
20
Glen Alpine Dump
Unranked
General
Streams
Interstates
19
General
30
Hydric Soils
NCDOT Bridge Locations Roads/Interstates
Moderate
ek
Hydrology
22
Bike Route
Moderate
High
Rail Roads
15
Hydrology
Lake James
1
Managed Lands
18
Exceptional Very High
37
re
Natural School Heritage Areas
ver
21
eC
wb
Hospitals
High
AnimalTable Rock Middle Natural Community
Quaker Meadows House
ta
Fishing Access Parks Golf Courses
Crescent Resources Properties Civic Landmarks
Very High
Animal Assemblage
Element Occurrence: Sweet White Trillium
Catawba Ri
Natural Heritage Areas
Exceptional
Bridgewater Powerhouse
Study List (SL)
Transportation
no
Ca
START OF STUDY AREA
Existing Trails
Animal Natural Community
SL, DOE, and Landmark DOE NRHD Surveyed Surveyed in NRHD Site Gone Sensitive Cultural Resources
NC 126
OVNHT 1/2-Mile Buffer
Municipal Boundaries
Trail
State Natural Heritage Data
SL and Landmark SL and Determined Eligible (DOE)
Connectors
Loop
National Register Historic District (NRHD)
pT rail
Local District Center Point
Element Occurances Plant
SL, DOE, and Landmark DOE NRHD Surveyed Surveyed in NRHD Site Gone Sensitive Cultural Resources
18
MAP 2
James
Constraints
Active & Inactive Landfills
38
Ca
State Natural Heritage Data
NRHD Boundary
Lake
38
Inactive Hazardous Sites
NR and Local Landmark
RD
Alignment ‘B’
Loo
Brownfields
National Register (NR) of Historic Places Site
OU
Opportunities
Historic Sites and Ditricts
Lake James State Park
RH
50
es
19
Inactive Hazardous Sites Active & Inactive Landfills
NR and Local Landmark National Register Historic District (NRHD)
WE
Alignment ‘A’
am
Brownfields
National Register (NR) of Historic Places Site
18
SL and Landmark SL and Determined Eligible (DOE)
PO
eJ
N
Lak
Historic Sites and Ditricts
il
Tra
nway
Federal & State Ownership
Public Libraries
op
Lo
La
Managed Lands
Public Health Departments
es
am
J ke
Catawba Gree
Fishing Access Parks Golf Courses
Hospitals
Schools
Lake James
Proposed Trails
Crescent Resources Properties
LEGEND
Colleges and Universities
Existing Trails
Property Lines Duke Energy Properties Civic Landmarks
ay
Greenw
Federal & State Ownership Private Municipal/County Owned Properties
Public Libraries
OVNHT 1/2-Mile Buffer
Catawba
Managed Lands
126
Public Health Departments
Municipal Boundaries
r
Rive
Catawba Meadows Park (NC State Easement)
Golf Courses
Hospitals
County Boundary
wba
Cata
1/2-Mile Buffer COVNHT an Trails Existing oe Trails Proposed Cr Fishing Access ee Parks k
Municipal Boundaries
OVNHT & Other Recreation Overmountain Victory NH Trail
k
OVNHT & Other Recreation Overmountain Victory NH Trail
20-Foot Contours County Boundary
Connectors
39
ree
D
MAP 2
nC
SAINT MARYS CHURCH RD
BOST ROA
MAP 1
LEGEND
Wil so
ST
Opportunities
BO
50
MAP 2
Alignment ‘B’
AD
MAP 3
LEGEND Alignment ‘A’
Lenoir to Morganton Greenway Study
6
8
RR
k
ree
yC
8
So
n
er
uth
lk
rfo
No
ed
5
Re
Historic Bridge
7 Muddy Creek Historic RR Bridge
NTY
U L CO
Site Analysis Overmountain Victory National Historic Trail
NTY
OWEL
MAP 1
U E CO
MCD
BURK
LAKE JAMES STATE PARK
9
MAP 1
70
Lake James to Morganton Greenway Study
19
chapter 1
Proposed Trails Fishing Access Parks Golf Courses
ANALYSIS Civic Landmarks
Hospitals
Private Municipal/County Owned Properties
LEGEND
Historic Sites and Ditricts
Active & Inactive Landfills
50 38
Local District Center Point
Animal Assemblage
SL and Landmark SL and Determined Eligible (DOE)
Animal
Municipal Boundaries Property Lines
Duke Energy Properties Transportation Crescent Resources Properties Bike Route NCDOT Bridge Locations
Civic Landmarks
Rail Roads
Hospitals
Roads/Interstates
Colleges and Universities Historic Sites and Ditricts
Waterlines Sewer
Very High
General
Existing Trails
High
Unranked
Wetlands (NWI)
Fishing Access Parks Golf Courses
Hydric Soils Waterbodies
5
10
10
11
way
a Green
Catawb
Catawba R
ive
10
5
Ca
no
Old
eC
4
38
Cata
wba 6
re
ek
Rive
r
Quaker Meadows House
7
37
6
9
30
Historic Bridge
8
5
Natural Community
High
Unranked
29
126
23 DOC
Hydrology 26
1 HWY
Wetlands (NWI)
AST
EE R
OAD
Hydric Soils
Flood Zones
Floodway
100-Year Floodplain
MAP 1
7
31
Element Occurrence: Carolina Foothills Crayfish, Eastern Creekshell
MAP 1 1 study area
Ca
no
27
28
31
ba
w ta
26
34
126
23
r
ve 28
29
181
Freedom Park & Greenway
64
Collett S &M
70
eC
re
ek 32
Ri
Swan Pond (Easement: Historic Preservation Foundation)
126
35
Muddy Creek Historic RR Bridge
31
Ca
Site Analysis Overmountain Victory National Historic Trail
500-Year Floodplain
36
Cas ML King Park
9
NTY
LAKE JAMES STATE PARK
Y UNT L CO
Waterbodies
Streams
26
rf
No
k
General
Quaker Meadows Cemetery, Circa 1767-1879
8
Y1
rn
he
ut
So
Quaker Meadows Golf Course
ree
Very High
HW
OU KE C BUR
Moderate
olk
RR
yC
Natural Heritage Areas
Exceptional
Lake James to Morganton Greenway Study
20
Catawba Meadows Park (NC State Easement)
5
L OWE MCD
Sewer
C
RD
ed Re
Animal
Waterlines
G
r
Rive
reenway
Animal Assemblage
SL and Landmark SL and Determined Eligible (DOE)
Utilities
IN
3
State Natural Heritage Data
Study List (SL)
Local Roads State and County Roads State Roads
ND
ba ataw
Element Occurrence: Dwarf-flowered Heartleaf
Brownfields
Local District Center Point
Interstates
LA
16
500-Year Floodplain
Element Occurances Plant
Roads/Interstates
S
PO
k
100-Year Floodplain
Active & Inactive Landfills
NCDOT Bridge Locations
LD
N
39
Floodway
Private Municipal/County Owned Properties
Inactive Hazardous Sites
SL, DOE, and Landmark DOE NRHD Surveyed Surveyed in NRHD Site Gone Sensitive Cultural Resources
W
IE
2
Federal & State Ownership
NR and Local Landmark NRHD Boundary
ER
12
RD
10
ree
Streams
National Register (NR) of Historic Places Site National Register Historic District (NRHD)
Lake James State Park
Proposed Trails Hydrology
NF
E
US
HO
BE
nC
Catawba G
Utilities
OVNHT 1/2-Mile Buffer
3
Flood Zones
Local Roads State and County Roads State Roads
Public Libraries
2 3
Wil so
Paddy Creek Dam SAINT MARYS CHURCH RD
Catawba River Dam and Truss Bridge
Natural Heritage Areas & Other Recreation Moderate Overmountain Victory NHExceptional Trail
Managed Lands
Interstates
Public Health Departments
Natural Community
Lake James Family Campground
4
AD
County Boundary
Rail Roads
Element Occurrence: Dwarf-flowered Heartleaf Bridgewater Fishing Access
Element Occurances Plant
Constraints
Study List (SL)
SL, DOE, and Landmark OVNHT DOE NRHD Surveyed Surveyed in NRHD Site Gone Sensitive Cultural Resources
20-Foot Contours
Bike Route
MAP 2
Inactive Hazardous Sites
NR and Local Landmark NRHD Boundary
Connectors
Transportation
MAP 3
Brownfields
National Register (NR) of Historic Places Site
National Register Historic District (NRHD) Opportunities State Natural Heritage Data
Alignment ‘B’
Schools
14 13
AD
Federal & State Ownership
Public Libraries
Colleges and Universities
Alignment ‘A’
1
Public Health Departments
Schools
Lake James
1
Managed Lands
RO
Crescent Resources Properties
N
Property Lines
Duke Energy Properties
Bridgewater Powerhouse
START OF STUDY AREA
Existing Trails
Map 3: Study Area 1 Site Analysis
OVNHT 1/2-Mile Buffer
Municipal Boundaries
ER
NC 126
OVNHT & Other Recreation Overmountain Victory NH Trail
20-Foot Contours
County Boundary
15
D
Lake James State Park
OU S
Constraints
Connectors
ST
38
MAP 2
BO
Alignment ‘B’
pT rail
RH
Opportunities
Lake James State Park
Loo
PO WE
50
es
es Lo op Tra il
SITE Alignment ‘A’
am
Lake Jam
eJ
BOST RO
study
ArEA 1
Lak
LEGEND
Freedom High School
END OF STUDY AREA
33 Catawba River Soccer Complex &Greenway Loop
Morgant
EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS
Study area 1 OPPORTUNITIES & (Map cONSTRAINTS Opportunities and Constraints: Lake James 1) OPPORTUNITIES 1 2 3 4
5 6
7
7
8 9 10
11 12 13 14 15 16
Potential Trailhead and improvement area Maintained open meadow Routes utilize private dirt roads Connect to Lake James Family Campground and single-family residential development by paralleling Benfields Landing Road Potential amenable landowner Flat area with potential to use Norfolk Southern right-of-way (around 200-feet) or adjacent private lands for alignment Bridgewater Road could be an excellent connector route or a preferred alignment if one alignment section was determined unfeasible Bridgewater Road hosts a Bed and Breakfast and may have opportunity for greenway related commercial Area is relatively flat Utilize Muddy Creek Historic Rail Road Bridge Potential amendable landowner on north side— alignment could utilize or parallel Corpening Chapel Road Potential amendable landowner on north side— alignment could utilize or parallel Rays Dairy Avenue Alignment parallels private road Potential trailhead at Bridge Water Fishing Access Area Powerhouse Road bridge has ample deck width to allow for on-grade bridge crossing Potential connection to North Powerhouse Road and Lake James Loop Trail Powerhouse Road has 60-feet of right-of-way and is fairly flat through the rest of this area going east
CONSTRAINTS 1
2
3 4
5 6
7
8
9 10
Steep hillside may require greenway alignment to parallel Highway 126 until the crossing of Benfields Landing Road Hwy 126 Bridge has narrow shoulder with railing obstruction for several hundred feet—would likely require a bridge attachment Wetland/low lying area Area has stream crossing and significant fill slope from rail road bed and would require alignment to be in floodway or elevated on a structure At-grade road crossing on Bridgewater Road Bridgewater Road bridge has narrow shoulder and would need to have a bridge attachment or separate pedestrian bridge Rail-bed is on elevated dike and significant fill slope from rail road bed and would require alignment to be in floodway or elevated on a structure Large disturbance area (possible motor cross track) within and adjacent to Norfolk Southern right-ofway Tree farm Sensitive cultural resource areas
7
View of Bridgewater Road flat and steeper areas
14
Approach to Bridgewater Fishing Access Area on Powerhouse Road
5
View of Bridgewater Road and potential ongrade road and railroad crossing
14
View of decking over the Catawba River on Powerhouse Road
Rail dike
rn
e uth So k l rfo ROW No
1
View of project terminus on Highway 26 with potential trailhead/enhancement area
10
View of Rays Dairy Avenue and potential onroad or parallel alignment
7
View of Norfolk Southern rail line constrained area
16
View of Riverview Apartments with sewer line easement shown at the right
21
chapter 1
SITE Alignment ‘A’
50
Opportunities
Alignment ‘B’
38
Constraints
Ca
no
eC
ree
k
OVNHT 1/2-Mile Buffer
Municipal Boundaries
Existing Trails
Property Lines
ANALYSIS Proposed Trails
Duke Energy Properties
Fishing Access Parks Golf Courses
Crescent Resources Properties
Civic Landmarks
Hospitals
Federal & State Ownership
Public Libraries
Private Municipal/County Owned Properties
Colleges and Universities Schools Historic Sites and Ditricts
LEGEND
il
NR and Local Landmark Alignment ‘A’
National Register Historic District (NRHD)
‘B’ NRHDAlignment Boundary
e ak
L
Element Occurrence: Sweet White Trillium
MAP 1
SL and Landmark SL and Determined Eligible (DOE)
no
Catawba Riv
er
21
18
22
Animal
19
OVNHT 1/2-Mile Buffer General Very High
Lake James
High Existing Trails Unranked Hydrology
Proposed Trails
Wetlands (NWI)Access Fishing
Crescent Resources Properties Bike Route
HydricParks Soils
NCDOT Bridge Locations Civic Landmarks
Golf Courses Waterbodies
Rail Roads
Hospitals
il
ra pT
Local Roads Public Libraries
es
am
J ke
Utilities Schools
22
18 19
22
17
18
Inactive Hazardous Sites
Catawba Riv
Active & Inactive Landfills
NR and Local Landmark National Register Historic District (NRHD) NRHD Boundary
State Natural Heritage Data
Local District Center Point
Element Occurances Plant
Study List (SL)
Animal Assemblage
SL and Landmark SL and Determined Eligible (DOE)
Animal
Exceptional
Moderate
Very High
General
High
Unranked
17
18
22 Catawba River Access Area
11
Wetlands (NWI) Hydric Soils
MAP 2
19
15
Glen Alpine 18 13 Dump 12
11
Hydrology
18
14
26
18
Catawba Riv
POW
er
21 22
E RD
27
Flood Zones
Floodway
25
OUS
Waterbodies
70
17
y ed
17
ern
uth
o lk S
RR
24
rfo
No
22
Glen Alpine Elementary School
k
ee Cr
100-Year Floodplain Site Analysis 500-Year Floodplain Overmountain Victory National Historic Trail
20 20
18
ERH
Streams
Re
GREATER GLEN ALPINE
er
16
Natural Heritage Areas
Transportation
21
Glen Alpine
Natural Community
SL, DOE, and Landmark DOE NRHD Surveyed Surveyed in NRHD Site Gone Sensitive Cultural Resources
Swan Pond (Easement:
Table Rock Historic Preservation Middle Foundation) School
24
Brownfields
Sewer
National Register (NR) of Historic Places Site
23
Element Occurrence: Sweet White Trillium
17
Private Municipal/County 500-Year Floodplain Owned Properties
Waterlines Historic Sites and Ditricts
21
18
o Lo
100-Year Floodplain
State and County Roads Colleges and Universities State Roads
k
20
La
FloodFederal Zones & State Ownership Floodway
Public Health Departments Interstates
ree
20
Glen Alpine Dump
Managed Lands Streams
Roads/Interstates
eC
Catawba 126 River Access Area
Natural Heritage Areas OVNHT & Other Recreation Overmountain Victory NH Trail Moderate Exceptional
Duke Energy Properties Transportation
Local Roads State and County Roads State Roads
Ca
18
Natural Community
SL, DOE, and Landmark 20-Foot Contours DOE NRHD Surveyed County Boundary Surveyed in NRHD Municipal Boundaries Site Gone Property SensitiveLines Cultural Resources
Interstates
Table Rock Middle School
Constraints 38 Element Occurances Plant
Roads/Interstates
MAP 2
State Natural Heritage Data
Animal Assemblage
Connectors
NCDOT Bridge Locations
19
Active & Inactive Landfills Opportunities 50
Study List (SL)
Rail Roads
18
m
Ja
Inactive Hazardous Sites
Local District Center Point
Bike Route
ra pT
oo
L es
Brownfields
National Register (NR) of Historic Places Site
Waterlines
Lake James
Managed Lands
Public Health Departments
Utilities
126
OVNHT & Other Recreation Overmountain Victory NH Trail
20-Foot Contours
22
MAParea 2 study 2
Connectors
County Boundary
Sewer
MAP 1
Map 4: Study Area 2 Site Analysis
study
ArEA 2 LEGEND
Lenoir to Morganton Greenway Study
Glen Alpine
23
EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS
study area 2 OPPORTUNITIES & cONSTRAINTS Opportunities and Constraints: Greater Glen Alpine (Map 2)
OPPORTUNITIES 17 18
18 19
20 21
22 23
24
25
26 27
Utilize 60-foot right-of-way (with 18-20-foot shoulder) on Powerhouse Road Potential for bridge underpass at low-flow periods— but on-grade crossing of Powerhouse Road may be more practical Bridge decking may accommodate a shoulder for on-grade crossing across the Catawba River Existing trail easement may allow for greenway accommodation in gated equestrian community— land bordering the Catawba River is owned by the club/community Potential amenable land owner Bridge clearance across the Catawba River would allow for a greenway underpass on either sides but lacks adequate shoulder on bridge deck for crossing the river Burke County’s Catawba River Access Area— potential trailhead location Subdivision platted but properties bordering river appear to be undeveloped and still owned by developer Watermill Glen Alpine Road/Turkey Tail Lane rightof-way has 60-foot right-of-way with approximately 30-feet of shoulder on the western side Downtown Glen Alpine hosts a commercial area that could serve greenway tourism including a bike shop, winery, and bed and breakfast Linville Street has an approximately 5-foot sidewalk through the majority of downtown Glen Alpine Powerhouse Road has 60-foot of right-of-way and relatively flat terrain into Glen Alpine
18
View of Powerhouse Road bridge over the Catawba River
CONSTRAINTS 11 12 13
14 15 16 17 18 19 20 21 22
Sensitive cultural resource area Homesite is close to Catawba River—alignment would need to navigate around it Bridge clearance may not be desirable for a greenway underpass and on-grade crossing may be necessary Tree farm Trust property Homesite located fairly close to Catawba River Sensitive cultural resource areas Wetland/low lying areas Trust property not likely to be amendable to a greenway Trust property Use of some private property in drainage would be needed for alignment This alignment may be less probable due to the intersection with several small privately held parcels
12
View of home site on the Catawba River that prevents an adjacent alignment on the south end
Club owned property
19
Gated equestrian community has commonly owned property on the riverfront
22
Burke County Catawba River Access area and potential trailhead
20
View from Catawba River Bridge—landowner on right of picture may be amenable
14
View of Watermill Glen Alpine Road right-of-way as a potential connector to Glen Alpine
21
View of Bridgewater Road and potential ongrade road and railroad crossing
16
Downtown Glen Alpine (with Norfolk Southern railroad line in the foreground)
23
chapter 1
Opportunities
38
Constraints
Connectors
Wil so
nC
SAINT MARYS CHURCH RD
39
ree
k
wb Cata
OVNHT 1/2-Mile Buffer
Municipal Boundaries
ANALYSIS Existing Trails
Property Lines
Fishing Access Parks Golf Courses
Crescent Resources Properties
Civic Landmarks
Hospitals
NRHD Boundary
Element Occurances Plant
Connectors Local District Center Point Study List (SL)
Animal Assemblage
SL and Landmark SL and Determined Eligible (DOE)
SL, DOE, and Landmark DOE NRHD County Boundary Surveyed Municipal Boundaries Surveyed in NRHD Property Lines Site Gone Sensitive Cultural Resources Duke Energy Properties
Colleges and
AST
126
126
23
Very High
General
eC
re
re
ek
END OF STUDY AREA
Freedom High School
Catawba River Soccer Complex &Greenway Loop
29
30
MAP 3
Quaker Meadows Cemetery, Circa 1767-1879
Y1
26
AST
EE R
OAD
Element Occurrence: Carolina Foothills Crayfish, Eastern Creekshell
Floodway
RO AD ST
Meadows Golf Course
34
31
126
END OF 28STUDY AREA
Ca
no
31
ba
w ta
Ca
26
Forest Hill Elementary School
181
31
Silver Cr
27
Lenoir to Morganton Greenway Study
ML King Park
D
23
eC
re
ek 32
r
ve
Ri
Swan Pond (Easement: Historic Preservation Foundation)
Quaker Morganton
126
35
OA
NR
OW EST
36
JAM
eek
Waterbodies
Flood Zones
37
Casc HW
DOC
H
West Street Historic District
70
23 26 WY 1
38
Quaker Meadows House
33
Collett St. Rec. Center & Martha Park
30
29
126
64
ek
24
Unranked
Site Analysis 100-Year Floodplain Overmountain Victory 500-Year Floodplain National Historic Trail
eC
32
28
Hydric Soils
Streams
way
a Green
Catawb
reenway
Moderate
Avery Avenue Historic District
Catawba Meadows Park (NC State Easement)
Catawba G
no
Hydrology
WEST MORGANTON
31
ve
Exceptional
Ca
181
Freedom Park & Greenway
r
Ca
25
Wetlands (NWI)
Local Roads State and County Roads State Roads
26
Natural Heritage Areas
Transportation
NCDOT Bridge Locations
Swan Pond (Easement: Historic Preservation Foundation)
Natural Community
High
no
28
Ri
Animal
SL, DOE, and Landmark DOE NRHD Surveyed Surveyed in NRHD Site Gone Sensitive Cultural Resources
Ca
27
a
SL and Landmark SL and Determined Eligible (DOE)
iver
aR tawb
31
wb
Animal Assemblage
ML King Park
126
35
31
ta
Study List (SL)
k
34
OAD
Ca
Element Occurances Plant
39
ree
Quaker Meadows Golf Course
36
EE R
Element Occurrence: Carolina Foothills Crayfish, Eastern Creekshell
State Natural Heritage Data
Local District Center Point
Sewer
HWY
Brownfields
Sewer
NRHD Boundary
Waterlines
DOC
Waterlines
National Register Historic District (NRHD)
Utilities
26
23
Floodway
Active & Inactive Landfills
Interstates
Quaker Meadows Cemetery, Circa 1767-1879
Y1
Waterbodies
NR and Local Landmark
Roads/Interstates
HW
29
Streams
Inactive Hazardous Sites
Rail Roads
30
Unranked
National Register (NR) of Historic Places Site
Bike Route
ek
126
Private 100-Year Floodplain Municipal/County 500-Year Floodplain Owned Properties
Utilities
Historic Sites and Ditricts
re
Flood Zones Federal & State Ownership
Local Roads State and County Roads State Roads Universities
Public Libraries
nC
37 SAINT MARYS CHURCH RD
Hydrology
Managed Lands
Roads/Interstates
eC
Cascade Park
Fishing Access Wetlands (NWI) Parks Hydric Soils Golf Courses
Public Health Departments Interstates
Schools
General
Proposed Trails
NCDOT Bridge Locations Rail Roads
Moderate
Very High Existing Trails High
Bike Route
Hospitals
no
Animal
ExceptionalBuffer OVNHT 1/2-Mile
Wil so
Quaker Meadows House
OVNHT & Other Recreation Natural Community Overmountain Trail NaturalVictory HeritageNH Areas
Transportation Crescent Resources Properties
Civic Landmarks
ay
Greenw
BO
Constraints State Natural Heritage Data
38
Ca
AD
Alignment National ‘B’ Register Historic District (NRHD)38
Active & Inactive Landfills
eenway
Inactive Hazardous Sites Opportunities
MAP 2
Site Alignment National ‘A’ Register (NR) of Historic Places50 NR and Local Landmark
24
MAP 3
Brownfields
BOST RO
LEGEND
Historic Sites and Ditricts
BOST RO AD
Private Municipal/County Owned Properties
Catawba Gr
Federal & State Ownership
Public Libraries
Colleges and Universities
20-Foot Contours
Catawba
Managed Lands
Public Health Departments
Schools
Catawba Meadows Park (NC State Easement)
Proposed Trails
Duke Energy Properties
er
a Riv
OVNHT & Other Recreation Overmountain Victory NH Trail
20-Foot Contours
County Boundary
Map 5: Study Area 3 Site Analysis
50
Alignment ‘B’
MAP 2
Alignment ‘A’
OA D
SITE
MAParea 3 study 3
LEGEND
BO ST R
study
ArEA 3
28
29
Freedom Park & Greenway
Freedom High School
64
Collett St & Ma
END OF STUDY AREA
33 Catawba River Soccer Complex &Greenway Loop
Morganto 70
EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS
study area 3 OPPORTUNITIES & cONSTRAINTS Opportunities and Constraints: West Morganton (Map 3)
OPPORTUNITIES 28 29 30
31 32 33 34 35
36 37 38 39
Historic farm (Swan Pond) Alignment could parallel Docastee Road Alignment could travel on-road on Elm Street and would need to travel through private property to access along the river Alignment overlaps with sewer lines/easements Canoe Creek bridge may accommodate a greenway underpass and separated pedestrian lane Connection could use some current path alignments through Freedom Park Intersection has planned signalization improvements Development is planned to link in sidewalk infrastructure and will link to the north side of Hwy 181 Connection to Quaker Meadows Cemetery—a historically significant OVT site Potential amenable landowner—property was historically a part of Quaker Meadows Connection to Quaker Meadows House—a historically significant OVT site Bost Road has significant 60-foot right-of-way and could serve as a connection to a neighboring subdivision
28
Swan Pond (a National Historic Register site) was settled just after the American Revolution
CONSTRAINTS 23 24
25 26 27
28
29 30
Alignment leaves OVT mile-buffer Topography is steep with a bluff that drops off behind buildings—alignment could need a switchback in this location Homesite close to the Catawba River would make an adjacent river alignment less likely Sensitive cultural resources area and trustee property Alignment on Cresthill Drive would need to be on-road or the construction of a 5-foot sidewalk— which is less than the recommended minimum 10foot path for a greenway in suburban/urban areas Access is restricted on the Morganton Water Plant but alignment is proposed around the perimeter and would require fencing (also a sensitive cultural resource area) Sensitive cultural resource area and wetlands Intersection of Saint Marys Church Road and Highway 181 is signalized but no crosswalks exist
29
A view of Docastee Road from Highway 126
24
30
25 Catawba River
30 24 25
Section where alignment would navigate away from the river
20
View of Cresthill Drive—a potential on-road or parallel alignment
28
View of Morganton Water Plant and its restricted access
22
14
16
View from Independence Boulevard bridge over Canoe Creek
Quaker Meadows Cemetery—revolutionary War grave sites and one of the oldest historic sites in Western NC
The McDowell House (Quaker Meadows)— historically significant through several eras
25
chapter 1
26
Chapter 2 landowner engagement
Landowner outreach and engagement was a key component of the planning process.
The environmental analysis (Chapter 1) was critical to determine physically feasible locations for trail development. However, significant portions of these routes impact private property and require landowner outreach to fully assess trail feasibility. This chapter highlights the good-faith effort to engage landowners
T h e en ga gemen t Process Identifying the Landowners Landowner Communications Landowner Workshop
throughout the planning process. Trail Route Re-evaluation
E DR
ED
R
DR
FINA L E
EZ
BY
RE
MU D LL
CAM
IA E LL
DR
SIL V
ER
ST
identify the landowners
MAP 2
R
MAP 3
EB
R KI
M SA
chapter 2
LA K
!
! !
W PO
DR
!
!
LA NE
!
N
97
!
!
!
!
!
!
!
DR !
HEL T ON
SH
¬¬¬¬¬
AD
93 92 91 90 89
OW
RIVER BREEZE DR
.
!
FRANKLIN ST
DR OW O
O
D
DR
T
HE NN
DE LL W
ES
ST
HAMP ST
FOXF IRE DR
0.5
1 FE RN
DR
BE AV ER
SURREY DR
ST
ST N SO ILG W IB G BS JUL ST ON DO N ST
IN
!
! !
!
!
!
!
! !
!
ARNE Y DR
N
ST
DR
AI
IN S T
EP RE
M
E MA
EA D
AL LE N
P AL
0 LIV AN
T PIT
ST
W
GROV ER
SU L
T IS S
T SS
NM
126
DAV
SCOTT ST
!
!
CEMETERY ST
ED BOWMAN ST
!
!
LINVILLE ST
ES
!
!
125
82 ¬
GE
!
87 ¬
T NS
BRID
! !
IS O
T
!
!
!
!
!
!
Y ST
127
!
ED MULL ST
¬
! !
AB ERNATH
! !
!
!
LAIL RD
124
!
!
!
!
E RD
RR
CATAWB A ST
¬ ¬ ¬ !
!
!
HOUS
GA
DR
ES
!
!
!
!
!
PO WE R
PA RK
SE
!
123
N
PEA RIDGE ST
!
!
!
¬
ST
84 ¬
ORDE RS DR
!
!
!
!
122
83 ¬ 81 ¬
!
CA
ER
!
!
¬
ND S T
!
RIV
R SO U
!
!
!
RIV E
!
N LE
94
!
G
R
!
L IL
E
!
!
!
AV E
ER AT W
M
N
!
NL EY
!
!
RD
!
BU
!
! !
CO
!
NE R AR MG
!
! ! !
!
PO LL A
ND R
PI AL
D
!
IS O
95
96
!
!
!
DR
85 ¬ 86 ¬
!
!
!
!
!
!
!
ST ER
88 ¬
!
!
!
!
!
!
!
JA M
!
LA N
100
!
RD
!
!
116
!
28
CO
!
!
D
!
98
99
!
HO
!
!
ER
!
US
!
!
ER
101
!
!
119
!
CONVERSATION WITH LANDOWNERS. !
104
118
¬
121
!
!
!
COB B HOL LOW DR
!
¬
!
128
107
105
106
117
!
¬ ¬ ¬ A step 2: START 129
¬ ¬ 102
¬ ¬ ¬ ¬ ¬ ¬ ¬ ¬ ¬ ¬ ¬ ¬ ¬ ¬ DR
!
!
step 1: determine where the trail is feasible (CHAPTER 1). 130
!
115
!
R
RD
VE RI
H
!
!
RC
!
HU
!
LC
!
120
PA U
103
!
¬
NT
!
114
SA I
¬ 110
!
113
T DR
¬
!
112
DR
UB CL
¬ ¬ ¬ ¬
!
DR
SS
!
VE
NE
108
DR
¬
NL EY
109
FORNEY ST
CO
ER
A mailing database was created that included all property owners impacted by the preliminary trail alignment(s). E CRES
¬ ¬
111
IN V
DY
Landowner Database
DR
!
E
R
S
!
CH
FD
N SA
E BE
UF BL
RE
!
Trail alternatives were developed based upon an environmental feasibility analysis (see Chapter 1).
O SH
MAP 6: Landowner Database
Feasibility Analysis
2 Miles
I
W OO D
landowner engagement video production
landowner invitation
Date: February 16, 2015
landowner communications
[Insert Landowner Name and Address
Re: Trail Planning Meeting for Landowners Dear [Insert Landowner Name]: Thanks to grant support from the National Park Service, regional community organizations and local government leaders, a plan is being developed for establishing a walking and leisure biking trail to connect from Lenoir to Morganton to Lake James. This trail celebrates the walk made by the Overmountain Men who won a major Revolutionary War battle at Kings Mountain in 1780. Since November 2014, the planning team has been working to identify a feasible route to construct the trail. As part of this analysis, your property has been identified as a potential location for a trail section. Without a voluntary commitment from landowners, this important trail will either be relocated or not constructed. We would like to invite you and other landowners to discuss this project during a special meeting that will take place at [insert time and location]. An informational video can be found on the web at: www.OVTplan.com. Also, enclosed is a project Fact Sheet that further describes the project. Please RSVP if you plan to attend the meeting by sending an email or calling using the contact information below. Thank you.
Sincerely,
A custom video, specifically produced for landowners, highlighted the story of the Overmountain Victory National Historic Trail and included a request for landowner participation. Web Portal The project website, OVTplan.com, provides information about the planning process and features the landowner outreach video.
Eric Woolridge Consultant Project Manager Destination by Design Planning Phone: 828.386.1866 Email: eric@DbDplanning.com
Destination by Design Planning 815 W. King Street, NC 28607
web portal
Video Production
Landowner Invitation Formal letters were sent to all landowners directing them to the website and requesting their attendance at a special meeting.
29
chapter 2
landowner workshop Video Showing After signing in, the landowner workshop began with a viewing of the custom video. Focus Group Focus groups were organized according to various geographic areas throughout the study area. Landowners were able to ask questions about their specific property and the associated trail alignment. Sentiment Card The meeting concluded with landowners noting their level in Victor y Overmounta of willingness to provide a trail easement via the yLandowner rve Interest Su Landowner Interest Survey. __________ __________ __________ r Plan ic Trail Maste ES
al Histor Nation L E NO I R
in Victor y Overmounta il Master Plan
ic Tra National Histor L E NO
LAK IR • MOR GANTON •
Landowner
E JA
M
ES
rvey Interest Su
___
__
_________
____
__________
__ er ________
Phone Numb
_
__________
________ __________
______
Email ______
___
________ __________
__________
__ __________
public viding for the interest for pro your level of Please share ) ow trail. (check bel e ted at this tim Ο Not interes r discussions welcome furthe and ted interes Ο Somewhat ted Ο Very interes
30
JAM
_____ __________
__________
__________
__________
___
__________
__________
__________
__ Address____
__________
__________
__________
__ Address____
KE
____
Name ______
______
__________
__________
________ Name ______
• MORGANTON • LA
___
__________
__________
__ er ________
Phone Numb
__
__________
Email ______
_____
________ __________
public viding for the interest for pro your level of Please share ow) trail. (check bel e ted at this tim Ο Not interes cussions me further dis ted and welco res inte hat Ο Somew ted Ο Very interes
landowner engagement
on march 5, 2015, 23 landowners attended the landowner workshop at the burke county government center. A similar landowner meeting was held for the Lenoir to Morganton sister OVNHT plan in Caldwell County on March 10, 2015. The photos seen here are from both events.
31
chapter 2
trail route re-evaluation
Revise Trail Alignments “Landowner Sentiment” was helpful for determining the preferred alignment and was included as a component of the final map series (Chapter 4). HN JO IV SR ER
WA RR
IOR F O
K R
of factors, including
2M 1/
N
CA E
O
EE
AN BR
PE E
K
EE
GLEN ALPINE
MU DD Y
EXISTING TRAIL
VER CREEK SIL
PROPOSED TRAIL
LANDOWNER SENTIMENT
RK
FO
LI
LE TT
40
EY IL BA
K EE
V RI
Y UNT E CO TY BURK OUN LL C OWE
N
ALTERNATE ROUTE
70
MCD
determine the
K
MORGANTON
PREFERRED OVNHT ROUTE
ER CATAWB A RIV
CR
A
ER
EE CR
Y ED RE
OLD CATAW B
CH
LEGEND REEK SILVER C
were used to
32
D
CR
FREEDOM TRAIL
sentiment,
(chapter 4).
CATAWBA RIVER GREENWAY
LAKE JAMES
and landowner
alignment
EE K
126
environment,
preferred trail
CR
CORRIDOR ILE
K
the built
LAKE JAMES STATE PARK
REE
environment,
181
C DY PAD
the natural
WILSON
126
Map 7: Landowner Sentiment
a combination
JOHNS RIVER GAMELANDS
YES NO POSITIVE NO RESPONSE
40 0
0.5
1
2 MI.
LEG
trail character and design guidelines
Chapter 3 trail character & design guidelines
This chapter provides design details for various trail types and signage and offers insight for incorporating social media.
Between Lake James and Morganton exists a diverse natural and built environment. Specific trail types must be applied throughout the corridor to ensure minimal maintenance and the best user experience.
I n t h is c h a pt er
This chapter defines three trail types and illustrates their transitions along the preferred trail alignment as fully described in the subsequent chapter.
C. Signage and Wayfinding
A. Trail Types B. Trail Profile D. Social Media Marketing
A specific theme is presented for signage, wayfinding, and trail support facilities. This chapter concludes with recommendations for using social media to market the trail and its history.
33
chapter 3
trail types
T
hree trail types are proposed along the preferred alignment. A specific trail type is proposed according to its surrounding environment, whether it's located within a rural or urban area, and the opportunity to create a meaningful user experience.
MILE MARKER FENCING TO MARK PRIVATE PROPERTY BOUNDARY
30’ PREFERRED BUFFER TO RIVER TO PROTECT WATER QUALITY
typical greenway 10' paved asphalt User Group: Multi-use Material: Paved Asphalt Preferred Width: 10' Average Construction Cost: $80/ln. ft. Preferred Easement Width: 50'
photo: The Catawba River Greenway
Minimum Easement Width: 20'
incorporates approximately four miles of certified Overmountain Victory National Historic Trail.
34
photo: discoverburkecounty.com
10’ PAVED ASPHALT
trail character and design guidelines
3:1 MAX CROSS
2’-3’ CLEARED
GUARD RAIL
5’
5’ NATURAL SURFACE
2’-3’ CLEARED
2’-3’ SHOULDER
multi-use trail
ncdot side path
5' natural surface
8' paved asphalt
User Group: Hikers and Cyclists
User Group: Multi-use
Material: Crushed gravel fines
Material: Paved asphalt
Preferred Width: 5'
Preferred Width: 8'
Average Construction Cost: $12/ln. ft.
Average Construction Cost: $120/ln. ft.
Preferred Easement Width: 50'
Preferred Easement Width: 25'
8’ PAVED ASPHALT
2’-3’ SHOULDER
Minimum Easement Width: 25' Note: Trail to be approved in accordance with NCDOT encroachment agreement.
35
chapter 3
trail type profile
t
here are two (2) trail type transitions proposed along the preferred trail route, which extends approximately 20 miles. The Trail Type Profile identifies the transition location, along with associated length, for each trail type.
ts n i po T trail types NCDOT SIDE PATH
8’ PAVED ASPHALT
MULTI-USE PATH *
5’ NATURAL SURFACE
R STA
C
BR L A AN
GE
R ID B L
A CAN
E AD H L I TRA
CK O L HEM
4 G#
N SSI
NG PR I
OA R ( S
RO C D
S
E
)
UK D R NTE
YL G R E E EN
O AND
DA S ’ AY
D.
FF R
UKE D T EXI
E
GY R E N
L
NTE E /
AND
OW P T XI
OW P R
SE U O ERH
SE U O ERH
W
RO . D R
E
.2 1.3
1.4
2.2
.8
5.7
TYPICAL GREENWAY
10’ PAVED ASPHALT
*Final trail type will depend on specific environmental conditions and whether trail is located within NCDOT ROW or within a private trail easement.
36
approx. distance in miles
matchline
t s e er t n of i IDGE
R IRY
OW R . RD
5.7
matchline
EXHIBIT 2: TRAIL TYPE PROFILE
trail character and design guidelines
EXI
R IR VE ILL M R ATE W G
ES C C A
S ARK P M
DO E E FR
N STI
K ROC
OR YF
END
D
ESS C C A
G
ER C A R
ID
EAD H L AI R T GE
4.6 .7EXISTING CATAWBA RIVER GREENWAY (4.0) 2.2
.2
approx. distance in miles 37
chapter 3
signage and wayfinding
t
he OVNHT signage family provides for a modern rustic theme and incorporates materials consisting of metal, rock, and concrete. The signage family serves as a template and can be altered and further refined depending on local preferences and specific site needs and opportunities.
Trailhead
Trailhead
Monument Sign
38
Trailhead ID
Break-away sign for use along NCDOT Roads
M
trail character and design guidelines
Trailhead
way sign e along T Roads
Map Kiosk
Spur Trail ID to Historical Site
Confidence Marker 39
chapter 3
social media: THE NEW WORD OF MOUTH #Trail2Victory
EXHIBIT 3:SOCIAL MEDIA
t
rail users should be encouraged to utilize social media to share their experiences with their "friends" and "followers." Special signage along the trail will signal users to consider posting pictures of themselves or their friend group as the walk or ride bikes along the trail. In addition, special props and features should be developed during the final design phase. After all, who can market this destination-quality trail better than the trail users themselves? Let's take advantage of social media -- the new word of mouth.
The proposed official hashtag for the OVNHT is "Trail2Victory." The use of this hashtag will allow local tourism leaders to curate local photos and content that can be shared on websites and re-posted through other social media platforms.
#findyourpark
burke county, nc
Find Your Park is the official centennial campaign of the National Park Service (NPS). The NPS is encouraging National Park enthusiasts to use the hashtag "findyourpark" when posting to social media. The OVNHT can help continue this campaign for years to come by encouraging the use of this hashtag at unique locations along the trail.
"Find Your Park" is the official centennial campaign of the National Park Service (NPS). The NPS is encouraging National Park enthusiasts to use the hashtag "findyourpark" when posting to social media.
40
trail users should be encouraged to utilize social media to share their experiences with their "friends" and "followers."
56 likes Busy day on the Catawba River along the #trail2victory. #findyourpark
recommendations
Chapter 4 recommendations
This chapter serves as the heart of the Lake james to morganton ovnht master plan.
I n t h is c h a pt er A. About the Planning Section Maps B. Quick Facts: Learn about each Planning Section
41
chapter 4
MAP 8: planning sections overview
study area sections
Study Area SECTIONS: The 20 mile study area from Lake James to Morganton is divided into four (4) planning sections. The geographic extent of each section includes a beginning and ending terminus that features a key asset or significant connectivity point for the trail. Many of the planning sections represent project areas that can be developed independently over time, providing a logical method for implementation as landowner willingness, funding, and other opportunities arise.
THE 20 MILE STUDY AREA FROM lake james TO MORGANTON IS DIVIDED INTO four (4) PLANNING SECTIONS; THIS CHAPTER IS ORGANIZED ACCORDINGLY. 42
T EC ID G
T
LR
TT S
RE LA U
FLOR A T RAIL
LLR ODW
FONT A
LHL OW O
ER OW
WW HHI IP PP OO RW RW ER I LL IL HL DR O
PR
LA K
RT H
CK WDU ORC TKH W LNO
ST
CA
LA N
DU
TE
RR
DR I TE H IW
23
landowner sentiment.
7
13 CO RP E R
D ARKK PA E
O
L
N PE C GN NI IN
LEGEND
G
D R EL ELAP APH HC
MM CCC
R ATE EW
CLEL
LEL
IDG
LAL
BR
PA RK
NA DNR
R
R
VI EW
VE
RI
DS
TRAILS
RA YS
DA
TRAIL FEATURES
LANDOWNER SENTIMENT
IR Y
AV TRAIL ROUTE PREFERRED
YES
TRAILHEAD
and trail user orientation. RoadNOcrossings indicate the about the pl anning section maps # ROAD CROSSING SPUR TRAIL need to provide for traffic calming measures and approPOSITIVE Each planning section is anchored by a # MAJOR BRIDGE EXISTING LOCAL TRAIL priate signage for both trail users and0.45motorists. Major Wet Lowland NO RESPONSE 0 0.225 map that highlights proposed trail routes, PROPOSED LOCAL TRAIL # MINOR BRIDGE/ CULVERT bridges indicate a significant stream orMilesriver crossing 1.0 MI. trail features, and landowner sentiment. The 1 in = 0.29 miles that requiresNCaOneMap, bridge greater than 20NCfeet NC Center for Geographic Information and Analysis, 911 Board in length. A proposed routes are identified as either preminor bridge/culvert demonstrates the need to cross a ferred, alternate, or spur. These trail alignrelatively small stream; at this broad level of planning, it ments are the result of extensive analysis, remains uncertain whether a small bridge or culvert is including environmental feasibility, landownnecessary. er willingness, and insights provided by local government and local trail development MORGANTON >> l ake james: by the numbers leaders. R BA
N JE DA
W
OO
ALTERNATE TRAIL ROUTE
¯
CROSSINGS
GE W CH ATER RD IG GE R ST
RO
1/2
BR ID
1/4
WH
C
I EW
G
OP OS ED
D US
T C E
G
ID ER
W
SLEE SPY LEHO EPLL YO HW OLL LNO
S
CK
12
EV
BA
i
RR
24
11
3SUNSET RD
ER
K
RI VE
E RD
6
VISTA (POSSIBLE PRIMITIVE CAMPING)
14
routes, trail features, and H OU S
N
BEACH W/ VISTA
22
SE
LA ND I
LAK
W TA CA
C
BA
15 ELD S
LA
R PO WE
D
LO
BE N FI
CA TA W
17
G
OL M EO H EMHL
16 PADDYS CREEK DAM
21
R
R
4
10
18
U HO
9
20
LAKE JAMES FAMILY CAMPGROUND
R
TE AS NC
highlights proposed trail ER W PO
5
D
BRIDGEWATER PUBLIC RIVER ACCESS
E INT TE PO OIN ELEL P RR UU A A LL
S G GNS INRI 8 PRSP
0
NP
NORTH
HO
DR
H
5
N
anchored by a map that
Potential Trailhead
Bridge Has Ample Deck Width (Photo Taken of Deck) '19
CT CK CK LO LO M HE EM
Narrow Bridge
6 12
7
2
Bridgewater Public Fishing Access
HOLI DA Y S
4
6
RD
HO
F
3
POWERHOUSE BRIDGE
NER RD
RD G IN G ND LA DIN S N LD LA IE NF DS BE EL I
N BE
2
T
each planning section is
BRIDGEWATER DAM
CONLEY BUMG ARN
OOR CT
IN
STREAM SID E LN
CONLEY BUMGAR
CRESTM
EA ST SOUTH SHORE DR PO
OW
ER
T
1
HO
DR PO INT V
F KE
TC
MALLARD CO VE DR
ES
RD
OR AK RE DR S
N EL
NORT LI D H SHO AY RE DR SH OR RE ES AV
OR
LA
2
VE
VE CO
CO
EP
EP DE
Trailhead / Future Improvement Area
LAKE JAMES
NP
TSIDRID GEWAY AV E AV
EF
WOOD DUCK LN
HO ER
RD E PARK E PARK
K LA
1
DE
1
GAG CO TATT
EXISTING OVT
recommendations
COT
E US
BE S
SI E
CO
RP
EN
ING
RD
Noted trail features include the physical infrastructure and facilities that support the proposed trail. These features are highlighted along the preferred route and provide critical information for developing an estimate of probable cost for each section. These features include trailheads and crossings associated with either a road or water feature. Trailheads will provide for parking
ROY MCGALLIARD AV
20.4 9 15 7 69 $2.8 M
SNOWHILL CHURCH RD
SNO W
HILL C
H URC
>> TRAIL MILES >> trailheads >> >> >> >>
H RD
quick facts Each planning section begins with a “quick facts” exhibit. This information includes the trail distance, vicinity map trail type (see Chapter 4: Design Guidelines), and key features and assets associated with each section. Also, Canal Bridge an Estimate of powerhouse road Probable Cost is provided, which total length: trail type: is further deEstimated Cost: scribed within points of interest: the written text for each planning section. 5.9 miles
5 Foot Natural Surface
$ 985,372
road crossings major bridges minor bridges/ culverts
Lake James
Canal Bridge Trailhead
Bridgewater River Access
Lake James Family Campground
APPROX. cost
43
chapter 4
section 1 vicinity map
Canal Bridge Powerhouse Road total length: trail type:
5.9 miles NCDOT Side Path
Estimated Cost:
Multi-use Trail
Trail Features
This planning section extends 5.9 miles from Canal Bridge to Powerhouse Road. Canal Bridge, which serves at the westernmost terminus of the entire planning study area, is also the terminus of an existing section of certified OVNHT that meanders through Lake James State Park. Considering there are major landowners throughout this section that are sympathetic to the mission of the OVNHT, including Duke Power and Crescent Resources, an opportunity exists to implement a significant portion of this trail section within a relatively 01 short timeframe.
Trailheads
From Canal Bridge the preferred route extends south and then east before paralleling Hemlock Springs Road and connecting to Lake James Family Campground. From here, the trail will parallel Benfields Landing Road before reaching a vista and beach area on Lake James. As the trail continues east over Paddy’s Creek Dam, another vista opportunity exists, which could accommodate a primitive camping area.
Two trailheads are proposed within this planning section. The Canal Bridge Trailhead is proposed on property currently owned by Duke Power. From here, a short spur trail, 02 approximately 1,000’ in length, will serve as a connector to the preferred trail route. The second trailhead is proposed at the Bridgewater River Access, which is a major feature to be connected via the preferred trail route. Both of these locations provide an opportunity to display information about the trail and its history must be developed. This portion of trail could take significant time and expense to implement, thus creating the need for another trailhead along Advent Road should this entire planning section not be developed within a single project.
$985,372
points of interest:
Lake James
Canal Bridge Trailhead
Canal Bridge Public Access
Bridgewater River Access
Lake James Family Campground
Proposed Trails
The preferred route ultimately connects to the existing Bridgewater River Access, which is maintained by Duke Power and is programmed for further infrastructure improvements. Users will need to cross the Muddy Creek Bridge and continue on the east side of Muddy Creek before continuing parallel along Powerhouse Road. This planning section ends where the trail leaves Powerhouse Road and connects to established trail easements that follow the Catawba River.
03
photos: (1) Canal Bridge serves as the westernmost terminus of the entire planning area. (2)
A trailhead is
proposed on Duke Energy property located adjacent to the Canal Bridge Public Access. (3) Bridgewater River Access is a major feature to be connected via the preferred route.
44
recommendations DR VE
N
CO
R
T LS Y AURE L DR IV
WAY
W AY
R
T DR
GA FO TEER CT
R
ID G
T
LR LA U
S
LLR ODW
FONT A OP OS ED
LHL OW O
O RW RW I LL IL HL O
LA K
IP PP O
H
ER
DR
WW HHI
RT
CK WDU ORC TKH W LNO
ST CA LA N
DU
TE
PR
12
I W TE H
RR
HI
23
7
13 CO RP E O
R
D ARKK PA E
N PE D R EL ELAP APH HC
D AR OB
E AJ
N
W
OO
GE W CH ATER RD IG GE R ST
MM CCC
R ATE EW
CLEL
LEL
IDG
LAL
BR
PA RK
NA DNR
R
G
BR ID
Wet Lowland
1.0 MI.
LEGEND
C GN NI IN
VI EW
R VE RI
L
C
I EW
G
R
1/2
DR
W RR
24 11
EV
BA
N 1/4
FLOR A T RAIL
D ER US T C E
G
ID ER
W
SLEE SPLYEH EO PLYLO HW OL LN LO
S
K
3SUNSET RD
14
ER
8
6
E RD
N
VISTA (POSSIBLE PRIMITIVE CAMPING)
RI VE
H OU S
LA ND I
BEACH W/ VISTA
E
ELD S
BA
R PO WE
15
22
US
BE N FI
HO
C
17
CA TA W
21
ER
LO
16 PADDYS CREEK DAM
LAK
W TA CA
M EO H EMHL
D
4
10
18
LAKE JAMES FAMILY CAMPGROUND
R
D
PRSP
9
20
LA
NER RD
UU LLAA
5
R
BRIDGEWATER PUBLIC RIVER ACCESS
E INT TE PO OIN ELEL P RR
R
TE AS C N
G
OL
S G GNS INRI
0
OW
HO ER OW NP
DR
W PO
5
7
Potential Trailhead
Bridge Has Ample Deck Width (Photo Taken of Deck) '19
H
6 12
6
2
Bridgewater Public Fishing Access
CT CK CK LO LO M HE EM
Narrow Bridge C
POWERHOUSE BRIDGE
RD
HOLI DA Y S
4
N
NT
NP
R PO INT D
F
N
3
OI
CONLEY BUMG ARN
O OR C T
RD G IN G ND LA DIN S N LD LA IE NF DS BE EL I
BE
2
NORTH
EA ST SOUTH SHORE DR P
STREAM SI DE LN
CONLEY BUMGAR
CRESTM
NORT LI D H SHO AY RE DR SH OR RE ES AV
T
EXISTING CANAL BRIDGE PUBLIC ACCESS
V
RD
1
LN
BRIDGEWATER DAM
HO
TC
VE
E OR AK RE DR S
LAKE JAMES
ER
HO
ES
CO
F KE
VE CO
2
LA
EP DE
EP
DE
DR
OR
WOOD DUCK LN
Trailhead / Future Improvement Area
CANAL BRIDGE TRAILHEAD
HO
E US
D
EF
E TON
K LA
RES
1
1
MALLARD CO VE DR
P FI
EAST S
EXISTING OVNHT
CK
CAM
CANAL BRIDGE
COT
RE
LE
E
RT
R E PARK E PARK
PH
O SH
IDRID GEWAY AV E AV
SP
ST SS ST L BA IL
E
LAUREL AV B BARTLETT START
M
M HE
WATERMILL RIVER ACCESS
TT S
T L
GAG TT OA CT
SE AK EV RVO T E S RGO T S G N CE INI T RU MAA
EC
T
W AT
POWERHOUSE RD.
E CRES
SO
SS D NE T
D
IN D
W ERF AT O RD
W
KE
I JO
CANTERBURY PL
SA N
PROPOSED LAKE JAMES STATE PARK HIKING TRAIL
BU R
CT
MAP 9: PLANNING SECTION 1
DY
SECTION 1 CANAL BRIDGE
TO
LINVILLE AV
AS H
BE S
SI E
TRAILS
RA YS
DA
ALTERNATE TRAIL ROUTE
RP
EN
ING
RD
LANDOWNER SENTIMENT YES
TRAILHEAD
DS
¯
CROSSINGS
SPUR TRAIL
#
ROAD CROSSING
EXISTING LOCAL TRAIL
#
MAJOR BRIDGE
#
MINOR BRIDGE/ CULVERT
PROPOSED LOCAL TRAIL CO
TRAIL FEATURES
IR YA PREFERRED V TRAIL ROUTE
NO
POSITIVE
0
NO RESPONSE
0.225
0.45 Miles
URC 1 in = 0.29 miles ILL CH N O WH
H RD
S
ROY MCGALLIARD AV CHURCH RD NC OneMap, NC CenterSNOWHILL for Geographic Information and Analysis, NC 911 Board
45
chapter 4 Crossings
EXHIBIT 4: LAKE JAMES FAMILY CAMPGROUND
Proposed within this section are seven (7) road crossings, two (2) major bridges, and twenty-three (23) minor bridges/culverts.
The primary route crosses a combination of major roads and local roads throughout this section. Benfields Landing Road is a significant road that will need to be crossed near Canal Bridge and again near Lake James Family Campground. A significant crossing is also necessary across Bridgewater Road near its intersection with Benfields Landing Road.
The two major bridge crossings exist at Canal Bridge and the Muddy Creek Bridge near the Bridgewater Public River Access. Both of these bridges will require appropriate treatments that signal motorists of possible trail users.
LAKE JAMES FAMILY CAMPGROUND existing
04 photos: (4)
Benfields Landing Road is a significant road
crossing within this planning section.
46
T
he preferred alignment extends parallel to Benfields Landing Road and provides a direct connection to the Lake James Family Campground. This trail section will be notable to passing motorist and will create interest for those visiting the campground and Lake James area.
EXHIBIT 5: POWERHOUSE BRIDGE
EXHIBIT 6: BRIDGEWATER ACCESS IMPROVEMENTS
recommendations
powerhouse rd. bridge
T
he Powerhouse Bridge will need to be modified to appropriately accommodate OVNHT users.
CONCEPTUAL
existing
DESIGN PROVIDED BY duke energy
duke energy Bridgewater access improvements
t
he Bridgewater Access is popular among fisherman and boaters. Duke Power has plans to significantly enhance the site, providing for additional parking and an enhanced boat launch area.
47
chapter 4
section 2 vicinity map
Proposed Trails
Trail Features
This planning section extends 5.7 miles from Powerhouse Road to Watermill River Access.
Trailheads
The preferred route continues along the north side of the Catawba River after crossing Powerhouse Road in the vicinity of North Bend Access: a planned NC Wildlife Resources River Access. Farther east, there are large tracts where landowners have expressed their unwillingness to provide a trail easement. With successful negotiations with other surrounding landowners, the trail will need to bridge the Catawba River and connect on its south side where there are secured existing trail easements. From here, the trail will continue on the south side and connect to the existing Watermill River Access.
Two trailheads are proposed within this planning section. The first is proposed along the Catawba River at Powerhouse Road where NC Wildlife Resources will ultimately construct a river access area. This access should provide for OVNHT information and welcome its users. The second trailhead is proposed at the existing Watermill River Access. The trail will need to extend under the Watermill Bridge to connect with this access area, which can use some minor enhancements to organize parking and orient users to area recreation opportunities.
powerhouse road watermill river access total length: trail type: Estimated Cost:
5.7 Miles Multi-use Trail
$884,652
points of interest:
Planned NC Wildlife Resources
River Access
Watermill River Access
06 photos: (5 & 6) The existing Watermill River Access could serve as an important OVNHT Trailhead.
05 48
CO CON NLLE EY YD
R
MAP 10: PLANNING SECTION 2
EY
K K IR
IRKKSS EEYYK
RN FO
NLS
WA WA TETER MIL RM ILL L RD
RW OO IPP WH
AL PINE
EN
GL RD PI NE AL EN GL ILL M
W AT ER
ST
W LN
BUTLER HO LLO
SURREY DR
CATAWBA
EY T AIL L
TURK
TS
DR
OW
RK
N
PEA PEA RIDGE RIDGE ST
PI T
T PS
PU M
EAD
ST N
O
IL S
CUTHBERSON ST
W G TT SJTU
DE KELLER AV LLW
NO RESPONSE
R
ST
P AL
S
ST
IB B
EN
G
L AL
N
GREER AV GREER
ST
MINOR BRIDGE/ CULVERT CARRIAGE HILLS DR
PD
AN
LN T EPLEY BENNET POSITIVE CAR BON CITY RD
REE
JE HT RHCC UC RN CH# MAJOR BRIDGE IG
ST
OO NC OneMap, NC Center for Geographic Information and Analysis, NC 911 Board DD
ES
T
R
IN
DR
YES NO
CHUR
#
LANDOWNER SENTIMENT
ROAD CROSSINGST
N
ARNE Y
#
DO
1.0 MI.
EXISTING LOCAL TRAIL ST EE E SS E S NE S N E HE PROPOSED LOCAL NN TRAIL T E H S INN AI A M M WW
ISST DVAISV TRAILHEAD DA OLD MIL LS CROSSINGS T E MA IN
O ND LO
1/2
ALTERNATE TRAIL ROUTE SPUR TRAIL
LEGEND
ST
N LO
1/4
GILES ST ST ERR TLE UL ST BT PAYNE SU ST D GE BRI E
0
TERY ST CEME CEMETERY
WB WS
LL LN O WE
LL
ST RICERICE
LINVILLE E ST LINVILL
OLD L
JOJHON TRAIL FEATURES HS NO SO NN
PREFERRED TRAIL ROUTE
DG BRI
26
EY Y AV
ED MULL ST
M MA ALLOONNE
8
House Located Very Close To River Tree Farm
ST
25
Y ST
FERC River Access Area to be developed in this location-also potential primitive campground
DALE
28
Trust Property
CATAWBA ST
N H
TU REEP ST
DR
27
ABERNATH
E RD
DALE
Cr e ek
OSUES
LEONARD ST TRAILS LEONARD BRIGHT ST BRIGHT
PPOW
N Mu d dy
24
GA
J A ROSS J A ROSS ST
RK DR ST ON
IS RR
SC O
AA YY EE RR SS DR
HH EE LTLO TNOD NR
DR
LAAI L I LLR D
NT Z
NNPA PA RK
RIVER BREEZE RIVER BREEZ E DR
NM
CC OO NLNL EYE BYUB UM MG ARB NA RN ER RE DR
HO LLOW
ILDL R LR OW W
W I LLH HIP OO L
RW WH
ER
D UCK W CKOW RO TH RTL
NE EECT GRE
GREEN
AY
LIND A WAY LINDA WAY RD
PARKER ST
House Fairly Close to the River
PROPOSED NORTH BEND ACCESS AREA
W
IL TA
PARKER
POWPO ER WH EO RHU
EN
ST
GL
CA
T
EY
GLEN ALPINE CLO
DU
ES
LA N
R FO R
D
S S LA LAIL IL AV
ARDARD ST LLIALLI MCGAMCG E ITDR
R
RR DDA V
29
N LA N LAILILAV
R
DR RS DERS ORDE OR
PPO OL LLLA A
30
E IV
31
EXISTING WATERMILL RIVER DR ACCESS Properties Subdivided But May Not Be Developed Yet EN
R
IISSOO NN D
LD
NO ON NBBA A LLLL ST
JJA AM M
O
32
23
10
L RG RIVE IVE R SO NR UND R ST ND E N LE L G G Turkey Tail Lane Would Make Rand IVE Excellent Bike Route Connector ERR RS V VE HA RRII UN DO D OE R R SS WS UN S D T I P RA
CA CA NNN
LA
HE WIT WH R RR
Alignment Option Connection (Ex. Bridge)
52
Connect Into River Access (Owned By Burke County)
ROCK FEATURE
R
Cresecent Properties Broder River Here
51
Trust Property
33 34
TE AS NC
R
DR
50
R IVE AR B AW CAT
35
E LAN
AY SW
RD
23
GE
Trustee Property/Property Should Not Be Considered In Study
36
COBB HOLLOW
COBB HOLLOW DR
47Some Private Property Use Would Be Required To Meet A Reasonable Grade 48 49
D LE
L
DR
37
PA U
S PA CH UL UR C S CH H RD UR CH
RIVER
ST
ST
46 BB LUU
E PARK
IPO
39
38
COTTAG
'
3 40
CCL EERR
9
45
IVV RRI
OOLLD
STREAM SI DE LN
ILL
LN
UL V PA L A T PAU S T S D
TABLE ROCK MIDDLE
ILL
PS O M H
FONTA FLO RA T RA IL
W AY
CT
OCKKCI R DOC AD PPA DD
41
PRO POS ED
W AT ER
FO
R
GA TE
42
T DR
D
R
N
D
SO
O PS
126
43
RD
EY R
IN D
E CRES
M HA
44
Catawba River Club/Equestrian Community: Lands Along River Is Owned By the Club
W AT ER M
N
ST YLAURE L DR IV
DR
D
WATERMILL RIVER ACCESS
ST
IMPS
S
E
MC G
NE
C
Y PSE GIM MC
I JO
R SP
U
A
W
FORNEY ST
PO
L
CEFU
A UL LN PEEF PEAC
LANE
E
12 6
OLD LUMBER YAR D RD
US
LE AV
N
BBUUCCK KT HO HR ONRTN AVTEAV RNERN R
HO
POWERHOUSE RD.
NE
SS BU D RK R E ST
T
ER
RD
V VE A
CT
AV
IL LINV
ER
ILL
RY
GR O
SB
R
T
BRA X
SECTION 2 HO
R TE
CANTERBURY PL
W
NC
LN
BR LU B FFL U CTFF
A
IV RE
GAT
AN N
BEND RIVER BE ND LN
SC
T DR ES
LL Y
RI V RE
C
CT
NC
PO
T IN
TO
E
PO
AS H
G
NS
IN V
D
IA
T ON
LO
N TKI WA
S
ES
HA WK
WATERMILL RIVER ACCESS
recommendations AL L
L LI L
ED
R
C
49
chapter 4 Crossings
EXHIBIT 7: OFF THE ROAD AGAIN @ POWERHOUSE
Proposed within this section are three (3) road crossings, one (1) major bridge, and twenty-nine (29) minor bridges/culverts.
07 The first major road crossing exists at Powerhouse Road where an initial visual inspection revealed that the trail will likely need to cross the road rather utilize a trail underpass. However, during the design and engineering phase or with the development of the river access planned in this vicinity, an opportunity for a trail underpass should be further explored. The second crossing is along Saint Pauls Church Road, a rural collector road that the trail will need to cross to again reach the Catawba River. The final road crossing in this section is located at Watermill Bridge, which provides sufficient room to accommodate a trail underpass.
The only necessary major bridge crossing is centrally located within the planning section. This bridge will allow the trail to avoid landowners located on the north side of the Catawba River that are unwilling to provide trail easements, while accessing existing trail easements located on the south side of the river within the River Club
photos: (7) The trail will need to cross (crossing #8) Powerhouse Road.
50
Off the road again @ powerhouse existing
a
fter paralleling the Powerhouse Road for approximately one mile, the preferred route leaves the roadside, extends south to the Catawba River, and takes advantage of trail easements provided by Duke Power.
EXHIBIT 8: WATERMILL RIVER ACCESS ENHANCEMENTS
recommendations
# T R A I L 2 V I C T O R Y
watermill river access Enhancements existing
t
he existing Watermill River Access serves as an ideal location to organize and orient OVNHT users. Future enhancements at this pocket park might include paved parking, a picnic shelter, and an information kiosk.
51
chapter 4
section 3 vicinity map
WATERMILL RIVER ACCESS FREEDOM PARK total length: trail type:
Trail Features
This planning section extends 4.6 miles from Watermill River Access to Freedom Park. This section is recognized as the most challenging area within the study area in regards to feasibility for implementation. There are such significant challenges on both the north and south side of the Catawba River that a preferred route is not provided, but rather only two alternative routes.
Trailheads The only trailhead proposed within this planning section currently exists at Freedom Park, which provides access to a certified section of OVNHT. Enhancements at this trailhead might involve incorporating trail signage and other features noted within this plan.
Since the previous planning section (Section 2) highlighted the existing Watermill River Access as its eastern terminus, ideally the trail would continue along the south side of the Catawba River. However, development density and noted unwilling landowners represent significant challenges on the south side of the river. Along the north side of the river, Swan Pond would serve as an ideal connection since its part of the NC Preservation Program. Also, the Canoe Creek corridor serves as an environmentally suitable location for a trail, but again, landowner issues within this vicinity present a barrier.
4.6 Miles Multi-Use Trail
Estimated Cost: points of interest:
Watermill River Access
Catawba River Soccer Complex
Freedom Park
Proposed Trails
$296,956
This planning section will require significant landowner outreach that is beyond the scope of this study. Furthermore, the consultant team determined that a specific preferred route could result in the further alienation of area landowners.
09
Freedom Park High School
photos: (8) Swan Pond would serve as an ideal connection point. (9) Freedom Park has an existing section of certified OVNHT.
08 52
recommendations
BOST
MULL
RDEN LIA GA
BRANSTROM
WILBURM NEWTON
E
JIM WALL
TONE
EM ORY
SW AN
BRO OKS
ND PO
WOOD
LA FORET
NE PI AL N LG IL RM W AT E
SA
NC EP
EN
DE
Y HE UG NA N
IND
SU
TT A
MI
LL
FREEDOM PARK
FREEDOM HIGH SCHOOL
TREE FARM
LD
O
EXISTING WATERMILL RIVER ACCESS
RI
VER CATAWBA RI
RI
JURISDICTION
VE R
ELM TS
BRITTAIN
GLENDALE
NORMANDY
WHITLEY
OLD LUMBER YARD
PIT
PREFERRED TRAIL ROUTE
1/8
1/4
CROSSINGS
SPUR TRAIL
#
ROAD CROSSING
EXISTING LOCAL TRAIL
#
MAJOR BRIDGE
#
MINOR BRIDGE/ CULVERT
PROPOSED LOCAL TRAIL 0
TRAILHEAD
RD
TR DUS
IN
T AR S
LVD IAL B
LEGEND TRAIL FEATURES
TRAILS
ALTERNATE TRAIL ROUTE
O CARB
70
TS HEIGH
ALE SPRINGD
Y N CIT
ARK AIR P
POPL
IN CALV
RIVER BREEZE
E FO
ENLE
CITY OF MORGANTON
CATAWBA RIVER SOCCER COMPLEX
GRE
ER
V
CA TA W BA
N
W AM
ALL MW
O
10
11
Y WA EN RE RG RIVE
LE
EEK
QUAKER MEADOWS CEMETERY
AWB A CAT
LANE
E CR
MC C
EN
12
T
CANO
RE
NEIGHBORHOOD WALMART
B E A CHMON
DR
126
CAME L
WHISPERING PIN E
126
53
13 55 54
MAP 11: PLANNING SECTION 3
HARBINSON
CL AY
STEPHENS TABLE ROCK MIDDLE
NG
56
CH
WATERMILL RIVER ACCESS
MCDOWELL HOUSE/ QUAKER MEADOWS
181
UR
FREEDOM PARK
H SC
WATERMILL RIVER ACCESS
TRUAX
S T MA RY
SECTION 3
57
V S IL
ER
EE CR
K
70
LANDOWNER SENTIMENT YES NO POSITIVE NO RESPONSE
1/2 MI.
53
chapter 4
section 4 vicinity map
fREEDOM pARK grace ridge trailhead total length: trail type:
4..2 Miles
This planning section extends 4.2 miles from Freedom Park to Grace Ridge Trailhead.
This section primarily highlights an existing and certified section of the OVNHT. However, within this area exists an opportunity for a spur trail that will link OVNHT historical assets, including the McDowell House. Furthermore, this section serves as the eastern terminus of this plan and as the southern terminus of the OVNHT sister plan than extends north to the City of Lenoir.
The Rocky Ford Access serves as the southern terminus of the OVNHT sister plan that extends north to the City of Lenoir. The preferred alignment for this planned trail segment would connect to Rock Ford Access after utilizing a trail underpass at the Highway 18/64 bridge.
From Freedom Park a spur trail is proposed to cross Independence Boulevard and then over Highway 181 to connect to the historic McDowell House, which is further examined in Chapter 1. The spur trail alignment then extends east to Bost Road before heading north until reaching the northern intersection of Bost Road and Lost Corner Road. After heading east on Lost Corner Road, the trail can access existing trail easements along the Warrior Fork corridor (see Appendix A-6 & A-7). A
Typical Greenway
Freedom Park
McDowell House/ Quaker Meadows
Quaker Meadows Cemetery
$609,480*
Catawba Meadows Park
Rocky Ford Access
Grace Ridge Trailhead
11
photos: (10) The McDowell House is an important historical
* Total cost of Section 4 including spur trail and associated trail features is approximately $2,607,080. While important, the spur trail isn't critical to connect the OVNHT.
asset worthy of connection via a spur trail. (11) Significant greenway easements are secured along Warrior Creek (see Appendix A-6 & A-7).
10 54
major bridge over the Catawba River would be necessary to reach the existing trailhead at the Rocky Ford Access. If complete, this spur trail would create an approximate 8.5 mile loop.
Existing Typical Greenway
Estimated Cost: points of interest:
Proposed Trails
O
T F IL WATER
F O M
EK
S
AT
D ER
N
RN
D
RIVERS
SO
N
IL
WE
ST P A
RK
LS
ID
0
O RA
LENOIR M
EE TI N
G
1/4
W
G
RE
CO
E
RC
H
#
ROAD
#
MAJOR BRIDGE
#
MINOR BRIDGE/ CULVERT
LANDOWNER SENTIMENT
N
YES
G
NO
CO
1/2
CH
U
IT
N
W
TRAILHEAD CROSSINGS
E
ES
LD
H
E
N
TRAIL FEATURES
N
EG RD E
IO
UN
AR
DE
YORK
MULL AVERY
EN
LL
KI
D
R
CO
CO
EN
CO
W
E
NORTH
ROCK WILSON Y
O D
RK
GLENW O
ET T ON
S
IDE
H
LL
N AN E D RS
PROPOSED LOCAL TRAIL
MORGANTONVA UE
AR
NE
ROCK YFOR
D
W EDG EW OO D
LAU REL H
SHERWOOD
N
SA
CLA
NW OO
PE
ALTERNATE TRAIL ROUTE
EXISTING LOCAL TRAIL
EAST
S
E
SPUR TRAIL
BRISTOL
Q
RI V BA
WO O
KI
IS DAV
CA TA W
G
CE N T ER R A
E IN
CATAWBA RIVER SOCCER COMPLEX
N KIN
VI
CO
RINK
LL
FREEDOM PARK
FREEDOM HIGH SCHOOL
R
CO
BOST
MEADOW VIEW
BRANSTROM
NC E
ND E
WILBUR NEWTON
MI
DB
IND EPE
MULL
TRUAX BEECHMONT
CAMELL IA
GARDEN
HARBINSON
S EN PH
AY CL
ST E
WHISPERING PINE
OU
ER
R
W
WOODSWAY
FAIT H
EMORYW OOD
TT A
ND EXISTING GREENWAY JEFFE RSON
IS
SU
SECO
RT
NH
R
CU
SP AI
PE
SETZER
181
PROPOSED FIR GREENWAY ST
RIDGE
RO
T
N RA
PREFERRED TRAIL ROUTE EB
ED
MIT
BE
CH
PE
PARK
WALKE R MOREHEA D EVANS CASCA DE
LE
HA
W AM
11
EL
LP
12
LEGEND
TRAILS
SUM
POWE
CH
A
ILLE
ERVIN
PINE
U
BO
FOX
OAK
LINV
53
RD
KIRK
AN EX AL
VINE A RDE N
VIEW
55 54
FO
R
DE
KIMBERLY
O W S
K
OOD DOGW
E
BA
ES TH
D
56
QUAKER MEADOWS CEMETERY
ALL MW SA
EA
ILLS
AB
W TA CA
CR
M
TA TE
SEE LENOIR TO MORGANTON OVNHT MASTER PLAN FOR RECOMMENDATIONS EAST OF GRACE RIDGE TRAILHEAD
Y
H
RC
D
OE ILL
N
EN
CA N
BROOKSTONE
EE AST DOC
E CR E EK
V LO
CAN O
EXISTING D GREENWAY R FO
CATAWBA MEADOWS PARK
57
13
7
GRACE RIDGE RETIREMENT COMMUNITY
58
MCDOWELL CH HOUSE/ ARQUAKER LE S MEADOWS
NORTHRIDGE
SE RK
HU
O WO
D
INE
KI
C YS AR
GE
59
OW L
PROPOSED GRACE RIDGE TRAILHEAD
60
FOR
KINC AID
RK
4
AD
15
EXISTING ROCKY FORD ACCESS
A
SH
E RE GC
M ST
R
INE
HA
RL
BE
A
IS
LA
LY
ED
TIM
181
N
POL
CAMELOT
EL M
69
AW
C
6
LO ST
I
E
61
PA
CREEK
FW
68
PROPOSED GREENWAY
RVIEW VE RI
SHERWOOD
W
V
W
WI LS ON
LAT IME R CL EA RW AT ER ND I NG C
E
R TAYLO
RE
FORK
R IVE R BA
TIN H UN
AL TE R
SP
K LA NG RI
ER
62
D
OR
WALTER JOHNSON MIDDLE
67
N
O
64
63
BELVED
EW O
N
PL
OA KS
O
A
5 14
TI
M
IL
IC
NC
RI
66
65
SD
ER
CO U
RI
FL
JU
N
N
UF
AR W
TO
AN RG
SH
VALLEY VIEW
MAP 12: PLANNING SECTION 4
ER
TY
GRACE RIDGE TRAILHEAD
UD DB RE
FREEDOM PARK
JOHNS RIVER GAMELANDS
PL
CI
SECTION 4
AN T
recommendations
POSITIVE
1.0 MI.
55
chapter 4 tRAILHEADS o wa r r i
r fork
CONCEPTUAL DESIGN PROVIDED BY CITY OF MORGANTON
EXHIBIT 9: GRACE RIDGE TRAILHEAD
Two trailheads are noted within this planning section. Rocky Ford Access serves as the existing trailhead for the northern terminus of the Catawba River 12 Greenway and Morganton’s certified section of the OVNHT. The trailhead would benefit from improved parking and trail user orientation. A new OVNHT trailhead is proposed along Highway 18/64 adjacent to the Grace Ridge Retirement Community. A spur trail will connect the parking area to the proposed OVNHT along the Catawba River.
location of existing rocky ford access
Crossings
hi
w ta Ca
g h
The proposed spur trail will require four (4) road crossings, two (2) new major bridges, and seventeen (17) minor bridges/culverts.
ay w 18
ba
/6
ve
4
ri
Major road crossings are required at Independence Boulevard, Highway 181, Bost Road, and Lost Corner Road. All of these crossings will require treatments appropriate to signal motorists of trail users.
grace ridge retirement community
r
As previously noted, a major bridge over the Catawba River will be necessary to reach the existing trailhead at
photos: (12) The design and planning team meets with local officials at the existing Rocky Ford Access to determine a preferred trail alignment.
56
grace ridge trailhead
a
new OVNHT trailhead is proposed along Highway 18/64 adjacent to the Grace Ridge Retirement Community. A spur trail will connect the parking area to the proposed OVNHT along the Catawba River.
EXHIBIT 10: HIGHWAY 18/64 UNDERPASS
recommendations
highway 18/64 underpass existing
t
he 18/64 underpass in Morganton is critical for connecting the existing Rock Ford Access/Catawba River Greenway with the Johns River Game Lands.
57
chapter 4
58
Chapter 5 implementation
To construct the ovnht from lake james to morganton will be no small task, but with time, perseverance, and a little luck, there is no doubt that a destination-quality
This chapter aims to summarize details regarding
trail is within grasp.
ensues.
each Planning Section and establish responsibilities and priorities for trail implementation. Furthermore, this chapter describes the “Trail Rubicon,� or the focus areas that when developed, result in a perception that the complete trail is imminent and widespread support
I n t h is c h a pt er A. Implementation by Section and Responsibilities B. Priority Implementation Areas and Responsibilities C. Trail Rubicon D. Trail Support Spectrum
chapter 5
implementation Implementation BY SECTION AND RESPONSIBILITY
implementation details by section and responsibility Distance
Key Challenges
Estimated Budget
Implementing Agency
SECTION 1-Canal Bridge to Powerhouse Rd.
5.9
Canal Bridge Crossing; NCDOT Side Paths along Benfields Landing Rd. and Powerhouse Rd; Benfields Landing Crossing; Muddy Creek Bridge Crossing; Securing Landowner Trail Easements
$2,239,900.00
Burke County
SECTION 2-Powerhouse Rd. to Watermill River Access
5.7
Securing Landowner Trail Easements; Catawba River Bridge; Watermill Glen Alpine Rd. Underpass
$884,652.00
Burke County
SECTION 3- Watermill River Access to Freedom Park
4.6
Securing Landowner Trail Easements
$296,956.00
Burke County, City of Morganton
SECTION 4- Freedom Park to Rocky Ford Access
4.2
Spur Trail to McDowell House; Highway 181 Crossing; Highway 18/64 Underpass
$609,480.00*
City of Morganton
Section
$4,030,988.00 * Estimated budget shown above pertains only to the completion of the preferred OVNHT route. Total cost of Section 4 including spur trail loop and associated trail features is approximately $2,607,080. ALL SECTIONS TOTAL
60
20.4
EXHIBIT 11: IMPLEMENTATION DETAILS BY SECTION AND RESPONSIBILITY
The table below provides key implementation information associated with each planning section. Key Challenges include a summary of the most difficult barriers for realizing each trail section. Many of these barriers include costly features or note the need to acquire trail easements from private landowners. Most importantly, this table assigns an Implementing Agency to each planning section.
implementation
Priority Implementation Areas & responsibilities
The table below supports a trail development strategy that prioritizes areas west of Watermill River Access (sections 1 and 2). If these were to be fully developed, this would likely provide the formula for "Trail Rubicon," the point in which the public, elected officials, and partnership funding agencies recognize that connectivity and complete implementation is imminent. At this point significant momentum and synergy would likely propel forward the completion of the OVNHT from Lake James to Morganton.
T
hink snowball effect. Which sections of the trail need to be developed before there is widespread support and a collective energy, beyond that of the community's traditional trail support base, to ensure that the OVNHT is complete? These trail section or focus areas represent the Trail Rubicon. Between Lenoir and Morganton, there are three areas:
1. canal bridge to powerhouse road 2. powerhouse road to watermill river access
trail Rubicon
PRIORITY implementation AREAS and responsibilities
Implementing Agency
Priority One
Priority Two
Burke County
Section 1: Canal Bridge to Powerhouse Road
Section 2: Powerhouse Road to Watermill River Access; Section 3: Watermill River Access to Freedom Park
City of Morganton
Section 4: Rocky Ford Access to Grace Ridge Trailhead
Section 4: Spur to McDowell House
EXHIBIT 13: PRIORITY IMPLEMENTATION AREAS
Burke County and Morganton must work in tandem to successfully realize the OVNHT. Trail implementation does not have to occur in a specific, linear order according to each planning section. In fact, the priority areas for implementation are merely suggestions and are in no way intended to hem creativity or necessary work in "lower" priority areas. Trail implementation is an art and requires the acumen to recognize and then seize opportunities, whether related to funding, landowner willingness, politics, etc.
EXHIBIT 12: TRAIL RUBICON
trail rubicon: finding the point of no return
61
chapter 5
trail support spectrum Creating a destination-quality trail system requires a significant commitment from local governments, including staff time, the holding of land and trail easements, and the dedication of local funding.
spend local funds, but instead must leverage their funds to obtain support from partnership funding agencies sympathetic to the creation of trails and the OVNHT.
The “Trail Support Spectrum� illustrates the steps local governments can take to support trail development.
Each local government must evaluate the OVNHT in relationship to its other priorities. However, a trail of this magnitude should be recognized as an economic development initiative that will provide a return on investment. Furthermore, each jurisdiction must not merely
5 4 3 2 1 62
EXHIBIT 14: TRAIL SUPPORT SPECTRUM
TRAIL SUPPORT SPECTRUM
APPENDIX
APPENDIX
(A1) BUDGET
SECTION 1- Canal Bridge to Powerhouse road Canal Bridge Trailhead Multi-Use Trail (5 ft. Natural Surface) NCDOT Side Path (6 ft. Paved Asphalt)
*1
Road Crossings Major Bridges Minor Bridge/ Culvert
SECTION 2- Powerhouse Rd. to Watermill River Access Existing Watermill River Access Improvements Multi-Use Trail (5 ft. Natural Surface) Road Crossings Major Bridges Minor Bridge/ Culvert
Units
Unit Cost
Total Cost
1 30096 1056 7 2 23
$125,000.00 $12.00 $120.00 $5,500.00 $75,000.00 $8,000.00
$125,000.00 $361,152.00 $126,720.00 $38,500.00 $150,000.00 $184,000.00
Units 1 30096 3 1 29
Total Cost Unit Cost $125,000.00 $12.00 $5,500.00 $150,000.00 $8,000.00
Total Cost SECTION 3- Watermill River Access to Freedom Park Multi-Use Trail (5 ft. Natural Surface) Road Crossings Major Bridges Minor Bridge/ Culvert
Grace Ridge Trailhead Typical Greenway (10 ft. Paved Asphalt) Road Crossings Major Bridges Minor Bridge/ Culvert 18/64 Underpass (Road Crossing)
Total Cost
24288 1 TBD TBD
$12.00 $5,500.00
$291,456.00 $5,500.00
Section 4 including spur trail loop and associated trail features is approximately $2,607,080.
64
$296,956.00
Units
Unit Cost
Total Cost
1 1056 0 0 0 1
$325,000.00 $80.00 $5,500.00 $175,000.00 $8,000.00 $200,000.00
$325,000.00 $84,480.00 $0.00 $0.00 $0.00 $200,000.00
ALL SECTIONS TOTAL
2 * Estimated budget shown above pertains only to the completion of the preferred OVNHT route. Total cost of
$884,652.00
Unit Cost
Total Cost 1 * Unit cost based on NCDOT estimate provided to Burke County on 6/17/2015. Final trail type will depend on specific environmental conditions and whether trail is located within NCDOT ROW or within a private trail easement.
$125,000.00 $361,152.00 $16,500.00 $150,000.00 $232,000.00
Units
Total Cost SECTION 4- Freedom Park to Northern Catawba River Greenway Trailhead
$985,372.00 Total Cost
$609,480.00 2 $2,776,460.00
APPENDIX
(A2) FACT SHEET
(A3) LANDOWNER LETTER
Date: February 16, 2015
FACT SHEET
[Insert Landowner Name and Address Re: Trail Planning Meeting for Landowners
BACKGROUND
A trail master planning effort is underway to help create a section of the Overmountain Victory National Historic Trail (OVT) that would connect from Lenoir to Morganton to Lake James!
Dear [Insert Landowner Name]: Thanks to grant support from the National Park Service, regional community organizations and local government leaders, a plan is being developed for establishing a walking and leisure biking trail to connect from Lenoir to Morganton to Lake James.
Thanks to grant support from the National Park Service, regional community organizations and local governments are working to establish a walking and leisure biking trail that connects the region and celebrates the trail walked by the Overmountain Men who won a major Revolutionary War battle at Kings Mountain in 1780.
This trail celebrates the walk made by the Overmountain Men who won a major Revolutionary War battle at Kings Mountain in 1780.
The trail planning process requires an analysis of the Lower Creek corridor in Caldwell County and the Catawba River corridor in Burke County. The trail is best suited in floodplain areas where development generally cannot occur and where there are meaningful connections to existing parks, civic buildings, and neighborhoods. After identifying feasible trail route options, there will be a major landowner outreach effort. Without the voluntary commitment from landowners, the trail will either be relocated or not constructed.
THE PLANNING PROCESS
An educational video will be developed to help communicate the historical significance of the OVT, which will be made available online.
www.OVTplan.com
1 Direction Setting and Project Launch
| September 2014 The consultant team will meet with local trail and government leaders to generally discuss environmental constraints and opportunities for trail connectivity.
2
Research | October – January 2015 The consultant team will conduct a thorough environmental assessment of the study area and determine feasible trail route options. With the trail routes identified, a landowner contact list will be developed.
3
Landowner Outreach | February – March 2015 Landowners with property along an identified feasible trail route will be invited to a special meeting to learn more about the trail project. After receiving comments from landowners, the preliminary trail routes will be updated.
4
Plan Development | March – May 2015 The consultant team will document the trail analysis and landowner comments. Recommendations will highlight alternative routes and the project’s overall feasibility for completion. A draft plan will be made available for public comment.
5
Final Plan Preparation | May – June 2015 The consultant team will publish a final plan that incorporates all public comments.
Since November 2014, the planning team has been working to identify a feasible route to construct the trail. As part of this analysis, your property has been identified as a potential location for a trail section. Without a voluntary commitment from landowners, this important trail will either be relocated or not constructed. We would like to invite you and other landowners to discuss this project during a special meeting that will take place at [insert time and location]. An informational video can be found on the web at: www.OVTplan.com. Also, enclosed is a project Fact Sheet that further describes the project. Please RSVP if you plan to attend the meeting by sending an email or calling using the contact information below. Thank you.
Sincerely,
Eric Woolridge Consultant Project Manager Destination by Design Planning Phone: 828.386.1866 Email: eric@DbDplanning.com
CONSULTANT CONTACT: Eric Woolridge, AICP Destination by Design Email: Eric@dbdplanning.com Phone: (828) 386-1866 Web: www.DbDplanning.com
Destination by Design Planning 815 W. King Street, NC 28607
65
APPENDIX
(A4) landowner interest survey
(A5) funding sources
Note: The completed Landowner Interest Surveys were provided to local government leaders.
Partnership Funding Agency
Overmountain Victory
National Historic Trail Master Plan LE N
OIR
• MO RGANTON • LAK
M ES E JA
Landowner Interest Survey Name ________________________________________
66
Active Living/ BuiltEnvironment Implications
Construction provided all easements are secure. Overmountain Victory
TIGER
Maximum Amount
Matching Funds Required
Deadlines
N/A (min. $1 million)
$0 (for rural counties
May (typical)
Not specified, but 20% is competitive
February 1st
N/A
50%
January 1st and June 1st
$100,000.00
25%
February 1st
$500,000.00
50%
February 1st
$10,000.00
20%
May 24th
N/A (for major projects)
20% generally
N/A
National Historic Trail Master Plan LE N
OIR
• MO
Based on 6/2015 Land Acquisition: Fee Simple or ES JAM discussion w/ staff, a Easement. Must protect $750K / multi‐year floodplain areas. Greenway trails and other park areas are application would be welcome. allowed.
RGANTON • LAKE
Clean Water Management Trust Fund (www.cwmff.net)
Landowner Interest Survey River access areas or
NC Water Resources (www.ncwater.org)
greenways along rivers
All types of trails and Name ________________________________________ Recreation Trails Program (ncparks.gov/About/grants/main.php)
Address_______________________________________
greenways All types of parks, trails, and Parks and Recreation Trust Fund Address _______________________________________ (ncparks.gov/About/grants/main.php) recreation facilities
_____________________________________________
_____________________________________________ Bikes Belong Foundation Trails and Greenways
Phone Number _________________________________
Phone Number _________________________________ Bike and Pedestrian Projects‐ NCDOT Transportation Plan For Bike and Pedestrian Projects
Email _________________________________________
both engineering and Email _________________________________________ construction
Please share your level of interest for providing for the public trail. (check below)
Please share your level of interest for providing for the public trail. (check below)
Ο Not interested at this time
Ο Not interested at this time
Ο Somewhat interested and welcome further discussions
Ο Somewhat interested and welcome further discussions
Ο Very interested
Ο Very interested
APPENDIX
(A6) warrior fork greenway easement
67
APPENDIX
(A7) crescent resources/ warrior fork Greenway easement
68
APPENDIX
69
APPENDIX
keep the story alive
70