STEP BY STEP Our team will lead you through the process of developing your transitional care center with the following steps:
Our program provides several advantages that condense the traditional construction timeline. • Our modules are pre-designed – design is now a process of review of proven modules and discussing customized changes, instead of starting from scratch. • Our team of specialists work on coordinated but parallel tasks simultaneously, instead of traditional projects that require serial steps. • Modules are pre-constructed off-site, in a factory optimized for speed and quality, instead of the sometimes dangerous and messy on-site conditions common to many construction projects. • Module production happens simultaneously with site preparation and pad construction. • Modules are placed and the building enclosed quickly.
• EVALUATION of your operational and spatial needs, the site, project pricing and financing. • DUE DILIGENCE to validate initial EVALUATION phase concepts/designs for both the site and building packages; obtain preliminary phase municipal and state healthcare agency approvals; confirm budgets and financing. • DOCUMENTATION of the final design and construction plan packages, gain final municipal and state healthcare agency approvals; final financing approvals. • CONSTRUCTION in coordinated off-site and on-site activities to complete within twelve months.
BASED ON THREE FLOORS, 60 BEDS:
MDN DEVELOPMENT APPROACH
DUE
EVA
LUA TIO
N
TYPICAL APPROACH
EVA
DO
IGE
N
CO
NST
CUM
NC
ENT ATI O
E
DUE
LUA TIO
14 TURNKEY TRANSITIONAL CARE
DIL
N
RUC
DIL
DO
IGE
TIO
N
NC
CUM
E
ENT ATI O
N