
FARRAGUT NORTH AND FARRAGUT WEST IMPROVEMENT CONCEPTS
TUNNEL ALTERNATIVE 2: PARALLEL TO 17TH STREET ALIGNMENT

00COVER SHEET
SK-01SITE PLAN STATION OVERVIEW
SK-02SITE AXONOMETRIC
SK-03FARRAGUT NORTH / FARRAGUT WEST PEDESTRIAN TUNNEL
SK-04FARRAGUT NORTH / FARRAGUT WEST PEDESTRIAN TUNNEL UTILITY
SK-05PEDESTRIAN PASSAGEWAY SECTIONS
SK-06FARRAGUT NORTH IMPROVEMENT CONCEPTS

NORTH IMPROVEMENTS CONCEPTS SECTIONS
SK-11FARRAGUT NORTH IMPROVEMENTS - AXONOMETRIC VIEW
SK-12FARRAGUT WEST IMPROVEMENT CONCEPTS
























FARRAGUT SQUARE
1700 CONNECTICUT AVE (4 BASEMENT LEVELS)
BARR BUILDING (3 BASEMENT LEVELS)
FARRAGUT BUILDING (3 BASEMENT LEVELS)
FARRAGUT SQUARE
PROPOSED IMPROVEMENTS
EXISTING ESCALATORS
EXISTING ESCALATORS
ENTRANCE
RELOCATED EXIT FARE VENDING MACHINES
NEW ELEVATOR FROM PLATFORM
NEW STAIR FROM PLATFORM
RECONFIGURED FAREGATES RELOCATED KIOSK
TOTAL:
STANDARD 1 ADA
CONNECTICUT AVE
CONNECTICUT AVE
EXISTING ELEMENTS
PROPOSED IMPROVEMENTS
RELOCATED KIOSK
RECONFIGURED FAREGATES
RECONFIGURED FAREGATES
RELOCATED KIOSK
RECONFIGURED EXIT FARE MACHINES

PROPOSED IMPROVEMENTS
REDLINE TRACKS




ESCALATORS TO SURFACE


RECONFIGURED FAREGATES
NORTH ENTRANCE NORTH MEZZANINE
RELOCATED KIOSK
SOUTH ENTRANCE



NORTHWEST ENTRANCE


MACHINE ROOM SOUTH

MEZZANINE



NEW PASSAGEWAY TO FARRAGUT WEST








PROPOSED IMPROVEMENTS
EXISTING ELEMENTS PROPOSED IMPROVEMENTS
EAST ENTRANCE
I STREET
FARRAGUT SQUARE
NEW ELEVATORS TO MEZZANINE
17TH STREET
STATION BELOW
EL=+/- 68.0' EXISTING BUILDING
EXISTING SLOPE REMOVED AS PART OF NEW ELEVATOR IMPROVEMENTS TO ENTRANCE
NOTED DESIGN ISSUES: COLUMN CONFLICT WITH ELEVATOR