BUILDING CODE ANALYSIS
BUILDING AREA:
BUILDING#1:15,699BUILDING#2:19,225BUILDING#3:11,498TOTAL:46,421
STORIES ABOVE GRADE: 5
USE OF BUILDING: CONDO&TOWNHOUSES
OCCUPANCY CLASSIFICATION: R-2
BUILDING CODE: IBC2009
FIRE CODE: NFPA13
BUILDING CODE CLASSIFICATION: IIIA
ALLOWABLE UNPROTECTED OPENINGS: NORTH: 45%-10'-15'(UP,S) SOUTH: NOTREQUIRED30'(UP,S) EAST: NOLIMIT24'+-(UP,S) WEST: 25%-5'-10' (UP,S)
REQUIRED EXTERIOR WALL FIRE RESISTANCE RATINGS NORTH: 1-HOUR SOUTH: 0 EAST: 1-HOUR WEST: 2-HOUR
OCCUPANT LOAD: 4PERUNIT
NUMBER OF EXITS REQUIRED: 1PERUNIT
NOTE:PERIBC1015.1EXCEPTION1. FIRE SEPARATION REQUIRED: YES FIRE RESISTANCE RATING REQUIRED: 2HOURATEXTERIORBEARING WALLONLYPERIIIBCONSTRUCTIONTYPE.NOTE:PROVIDINGADDITIONAL1-HOURRATINGATPARTYWALLS
1100,1102,1104,1106, 1108,1110,1112,1114, 1116,1118,1120,1122
SouthHighlandStreet Arlington,Virginia22204
CODE:
CP-FBC(ColumbiaPikeFormBasedCode) IBC2009
U.S.B.C2009
ZONING:
USE & OCCUPANCY:
R-2
R-5OneFamilyResidentialDwelling TYPE OF CONSTRUCTION:
STORIES INFO / USE:
36residentialunits(including12englishstylebasements)
12firstfloorflatsofwhichincludes(1)ADAunit 12uppertownhouseunits
Owner ETHIOPIANCOMMUNITYDEVEL
2"RIGIDFOAM(BASEMENT)
R10BATTINSULATION(BASEMENT)
R21BATTINSULATION(UPPEREXTERIORWALLS)
R38BATTINSULATION(FLOOR&CEILING)
901SouthHighlandStreet Arlington,Virginia22204 703.685.0510
KGPDesignStudio,LLC 109914thSt.NW Washington,DC20005 Phone:202.822.2102 Fax:202.822.2104
Architect Developer VMS,L.L.C. 8804SurreyCourt AlexandriaVirginia,22309 ProjectManagerGeneEdgecombe Phone:703.780.8886 e-mail:vmsllc@verizon.net
StructuralEngineer
LeuterioThomasLLC FortWashingtonMD20744
ProjectManager:HedyThomas Phone:301.203.1784
Fax:703.783.1359
e-mail:hedy@leuteriothomas.com
LandscapeArchitect caravalhogood,PLLC 1025ConnecticutAve,NWSuite1060 Washington,DC20036
ProjectManager:BrunoCaravalho ASLA,AICP Phone:202.857.9720 Fax:202.857.9799
e-mail:bruno@caravalhogood.com
CivilEngineer Vika,Inc. 8180GreensboroDrive,Suite200 McLeanVirginia,22102
ProjectManager:EdWagaman Phone:703.442.7800 Fax:703.761.2787
email:wagaman@vika.com
MEPEngineering
SolarEngineeringDesign,Inc. 3822PrinceWilliamDrive Fairfax,Virginia22031
ProjectManager:RobertCohen,PE Phone:703.978.0873 Fax:703.978.9473
e-mail:design@sed-inc.com
0-GENERAL
G0.00CoverSheet6
G0.01ListofDrawings6
G.01FireResistiveConstruction,LifeSafety,Diagrams& Notes
G.02FireResistiveConstruction,LifeSafetyDiagrams& Notes
G.03FireResistiveConstruction,LifeSafetyDiagrams& Notes
G.04CommonPathofTravelCaluculations
G.05CodeAnalysis-FireSeparationCompliance6
1-CIVIL
C-1CivilCoverShet
C-2SiteNotesandTabulations
C-3SiteNotes,DetailsandTabulations
C-4SiteNotesandTabulations
C-5ExistingConditionsDemolitionPlans
C-6InterimSitePlan
C-6AInterimSitePlan(HammerheadAlternate)
C-7InterimGeometricLayoutPlan
C-7AInterimGeometricLayoutPlan(HammerheadAlternate)
C-8InterimGradingPlan
C-8AInterimGradingPlan(HammerheadAlternate)
C-9ConceptualDominionVAPowerPlan
C-9ADominionVAPowerConceptualDesignAcceptance
C-10SedimentandErosionControlPhase
C-11SedimentandErosionControlPhaseII
C-12SedimentandErosionControlDetailsandNotes
C-13S.HighlandStreetPlanandProfile
C-14Future11thSt.S.ExternsionPlanandProfile
C-15BuildingDrainPlan
C-16SiteDetails
C-17SiteDetails
C-17ASiteDetails
C-18UtilityProfiles
C-19UtilityProfiles
C-20StormSewerComputationsandDetails
C-21SWMBMPComputations&Details
C-22SWMBMPComputations&Details
C-23SWMBMPComputations&Details
C-24SiteApprovalConditions
C-25SiteApprovalConditions
C-26SiteApprovalConditions
C-27SiteApprovalConditions
C-28SiteApprovalConditions
C-30PhotometricPlan2
C-31PhotometricPlan2
C-32TreeInventoryPreservationPlan
C-33TreeInventoryPreservationPlanData
C-34TreePreservationDetailsandNotes
C-35TreePreservationCorrespondence
2-LANDSCAPE
L1.01MaterialsPlan-Overall
L1.01AInterimMaterialsPlan-Overall
L1.02MaterialPlans-PavingPatterns
L2.01SiteDetailsPaving
L2.02SiteDetailsFurnishings
L2.03SiteDetailsRamp
L2.04CountyDetails-Lighting
L3.01LandscapingPlan-Overall
L3.01AInterimLandscapePlan-Overall
L3.02LandscapePlansBuidlings1&2
L3.03LandscapePlansBuilding3
L3.04LandscapePlanParkingLot
L3.05SiteDetailsPlanting&Schedules
L3.06CountyDetails-PlantingNotes
L3.07CountyDetails-PlantingDetails
3-STRUCTURAL
S0.01StructuralGeneralNotesandSymbols
S2.10Bldg100Basenent/FoundationPlan
S2.11Bldg101FirsFloorFramingPlan
S2.12Bldg102SecondFloorFramingPlan
S2.13Bldg103ThirdFloorFramingPlan
S2.14Bldg104&LowRoofFramingPlan
S2.15Bldg105HighRoofFraming
S2.16Bldg200BasementFoundationPlan
S2.17Bldg201FirsFloorFramingPlan
S2.18Bldg202SecondFloorFramingPlan
S2.19Bldg203ThirdFloorFramingPlan
S2.20Bldg204&LowRoofFraming
S2.21Bldg2-05HighRoofFramingPlan
S2.22Bldg3-00BasementFoundationPlan
S2.23Bldg3-01FirstFloorFramingPlan
S2.24Bldg3-02SecondFloorFramingPlan
S2.25Bldg3-03ThirdFloorFramingPlan
S2.26Bldg3-04HighLowRoofingFramingPlan
S3.10Bldg1-ShearWallElevations
S3.20Bldg2-ShearWallElevations
S3.30Bldg3-ShearWallElevations
S4.10ColumnSheduleandDetails
S4.11ColumnScheduleandDetails
S4.12MiscellaneousSchedules
S5.10TypicalWallSection
S5.11TypicalWallSection
S5.12TypicalDetailsFoundation
S5.13TypicalDetailsFoundation
S5.14TypicalSectionsandDetails
S5.15TypicalSectionsandDetails
S5.16TypicalSectionsandDetails
S5.17TypicalSectionsandDetails
S5.18TypicalSectionsandDetails
4ARCHITECTURAL
A0.1Symbols,Abbreviations&GeneralNotes
A0.2DumpsterPlans,Elevations&Details
A0.3FencingElevations&SectionCut
A0.4BikeRackElevations,Details&Specifications
A0.5BuildingSignageDetails
A1.1BLDG1-BasementPlan2
A1.2BLDG1-FirstFloorPlan2
A1.3BLDG1-SecondFloorPlan2
A1.4BLDG1-ThirdFloorPlan2
A1.5BLDG1FourthFloorPlan5
A1.6BLDG1-RoofPlan5
A1.7BLDG2BasementPlan1
A1.8BLDG2FirstFloorPlan
A1.9BLDG2-SecondFloorPlan
A1.10BLDG2ThirdFloorPlan
A1.11BLDG2FourthFloorPlan5
A1.12BLDG2RoofPlan5
A1.13BLDG3BasementFloorPlan1
A1.14BLDG3FirstFloorPlan
A1.15BLDG3SecondFloorPlan
A1.16BLDG3ThirdFloorPlan
A1.17BLDG3FourthFloorPlan
A1.18BLDG3ROOFPLAN
A1.19EnlargedPlans5
A1.20EnlargedPlans
A1.21EnlargedPlans
A1.22EnlargedPlans
A1.23EnlargedPlans
A1.24EnlargedPlans
A1.25EnlargedPlan2
A1.26EnlargedPlansatAtypicalConditions2
A1.27EnlargedPlansatTypicalBalconies
A1.28EnlargedRoofPlansatTypicalBalconies5
A2.1BLDG1ExteriorElevations5
A2.2BLDG2ExteriorElevations5
A2.3BLDG3ExteriorElevations4
A3.1BLDG1Sections2
A3.2BLDG2Sections5
A3.3BLDG3Sections
A4.1WallSectionsatBldg15
A4.2WallSectionsatBldg15
A4.3WallSectionsatBldg15
A4.4WallSectionsatBldg15
A4.5WallSectionsatBldg25
A4.6WallSectionsatBldg35
A4.7WallSectionsatBldg35
A5.1SectionDetails
A5.2SectionDetails
A5.3SectionDetails
A5.4SectionDetails
A5.5SectionDetails
A5.6ASectionDetails
A5.6BSectionDetails
A5.7PlanDetails
A5.8PlanDetails A5.9PlanDetails A5.10FencingDetails
A5.11EnlargedStairPlans
A5.12GateDetails-FAKEPG5
A6.1RCPUnitATyp.&UNITA7&A8Typ.1
A6.2RCPUnitBTyp.andUnitB7&B8Typ.1
A6.3RCPUnitC1&C2Typ.1
A6.4RCPUnitsC5&C91
A6.5RCPUnitsC7&C8Typ.1
A6.6RCPUnitB10(ADA)Typ.&UnitC12Typ.1
A7.1InteriorElevationsatLivingRoomUnitA12
A7.2InteriorElevationsatBedroomsUnitA1
A7.3InteriorElevationsatLivingRoom&BedroomUnitB1& B3 2
A7.4InteriorElevationsatLivingRoomUnitC12
A7.5InteriorElevationsatFamilyRoomUnitC1
A7.6InteriorElevationsatM.BedroomUnitC1
A7.7InteriorElevationsatThirdFloorUnitC1
A7.8InteriorElevationsatLivingRoomUnitB10
A7.9InteriorElevationsatLivingRoomUnitC10
A7.10InteriorElevationsatM.BedroomUnitC10
A7.11InteriorElevationsatBedroomsUnitC12
A8.0EnlargedInteriorElevationsatKitchen(AccessibleUnit TypeA) 1
A8.1EnlargedInteriorElevationsatKitchenUnitA5
A8.2EnlargedInteriorElevationsatKitchenUnitB
A8.3EnlargedInteriorElevationsatKitchenUnitC(typ)& UnitC10
A8.4EnlargedInteriorElevationsatBathroomUnitsA&B5
A8.5EnlargedInteriorElevationatPowderRoomBathroom UnitC
A8.6EnlargedInteriorElevationsatBathroomsUnitC5
A8.7EnlargedInteriorElevationsatbathroomUnitA7&B75
A8.8EnlargedInteriorElevationsatBathroomUnitC12
A8.9EnlargedInteriorElevationsatBathroomC7&C85
A8.10EnlargedInteriorElevationsatAccessiblebath(Unit C10)&MasterBath(UnitC12) 1
A9.1PartitionTypes1
A9.2FINISHANDDOORSCHEDULE5
A9.3WindowSchedule
A9.4WindowandDoorTypes2
A9.5WindowHeadFlashingDetails
A9.6Window&DoorSillFlashingDetails
A9.6bWindow&DoorSillFlashingDetails
5MECHANICAL
CS_MEPCoverSheet
M001MechanicalNotes
M002MechanicalNotes
M101.1Mechanical1sFloor-Bldg1
M101.2Mechanical1sFloor-Bldg2
M101.3Mechanicalf1sFloorBldg3
M102.1Mechanical2ndFloor-Bldg1
M102.2Mechanical2ndFloor-Bldg2
M102.3Mechanical2ndFloor-Bldg3
M103.1Mechanical3rdFloorBldg1
M103.2Mechanical3rdFloorBldg2
M103.3Mechanical3rdFloorBldg3
M104.1Mechanical4thFloor-Bldg1
M104.2Mechanical4thFloor-Bldg2
M104.3Mechanical4thFloor-Bldg3
MB01.1MechanicalBasement-Bldg1
MB01.2MechancialBasement-Bldg2
MB01.3MechanicalBasement-Bldg3
6PLUMBING
P001NotesandSchedules
P101.1Plumbing1stFloor-Bldg1
P101.2Plumbing1stFloorBldg2
P101.3Plumbing1stFloorBldg3
P101.G1Plumbing1stFloorBldgs1and2
P101.G2Plumbing1stFloorBldg3
P102.1Plumbing2ndFloor-Bldg1
P102.2Plumbing2ndFloorBldg2
P102.3Plumbing2ndFloor-Bldg3
P103.1Plumbing3rdFloor-Bldg1
P103.2Plumbing3rdFloor-Bldg2
P103.3Plumbing3rdFloor-Bldg3
P104.1Plumbing4thFloor-Bldg1
P104.2Plumbing4thFloor-Bldg2
P104.3Plumbing4thFloor-Bldg3
P200SanitaryRisers
P201SanitaryRisers
P202SanitaryRisers
P203WaterSupplyRisers
P204WaterSupplyRisers
P205WaterSupplyRisers
SheetNumberSheetName
P206GasSupplyRisers
PB01.1PlumbingBasementBldg1
PB01.2PlumbingBasementBldg2
PB01.3PlumbingBasementBldg3
PB01.G1Plumbing1stFloorBldgs1and2
PB01.G2Plumbing1stBldg3
S001FireProtectionRisers
S101.FSprinklersBldgs1and2
S102.FSprinklersBldg3
7ELECTRICAL
CSMEPCoverSheet
E001ElectricalNotes
E002ElectricPanels,Risers
E003LightingSchedules
E101.1Electrical1stFloor-Bldg1
E101.2Electrical1stFloor-Bldg2
E101.3Electrical1stFloor-Bldg3
E102.1Electrical2ndFloorBldg1
E102.2Electrical2ndFloorBldg2
E102.3Electrical2ndFloorBldg3
E103.1Electrical3rdFloor-Bldg1
E103.2Electrical3rdFloor-Bldg2
E103.3Electrical3rdFloor-Bldg3
E104.1Electrical4thFloor-Bldg1
E104.2Electrical4thFloor-Bldg2
E104.3Electrical4thFloor-Bldg3
E201LightingTypicalTypeAUnits
E202LightingTypicalTypeBUnits
E203Lighting-TypeC1andC2Units
E204Lighting-TypeC5andC9
E205Lighting-TypeC7andC8
EB01.1ElectricalBasement-Bldg1
EB01.2ElectricalBasement-Bldg2
EB01.3ElectricalBasement-Bldg3
2
1
2
1
PROJECT INFORMATION
NOTE: SEE "CIVIL AND LANDSCAPE" PLANS FOR MORE INFORMATION
BICYCLE RACKS: BIKE RACKS (2 SPACE CAPACITY) FOR THE COLUMBIA PIKE CORRIDOR SHALL BE AN INVERTED "U" IN GALVANIZED STEEL W/POWDER COATED FINISH.
- BIKE RACKS (2-SPACE CAPACITY) SHALL BE INSTALLED ON BOTH SIDES OF THE STREET, ALONG THE STREET TREE ALIGNMENT LINE OR W/IN THE FURNITURE ZONE (NOT TO INTERFERE W/ THE PLACEMENT OF STREET TREES OR STREET LIGHTS). AT THE TIME OF THE DEVELOPMENT, THE DEVELOPER IS ONLY RESPONSIBLE FOR THE INSTALLATION OF BICYCLE RACKS ON THE SIDE(S) OF THE STREET BEING DEVELOPED.
- WHERE FEASIBLE AND NOT IN CONFLICT W/ OTHER STREETSCAPE ELEMENTS, AT LEAST 50% OF VISITOR/GUEST BIKE RACKS SHALL BE LOCATED W/IN 50 FEET OF THE PRIMARY RESIDENTIAL/OFFICE BUILDING ENTRANCE AND SHALL BE LOCATED IN GROUPS OF TWO OR MORE. IN ALL OTHER LOCATIONS BIKE RACKS SHALL BE DISTRIBUTED W/IN A PROJECT EITHER AS A SINGLE RACK OR IN GROUPS OF TWO.
CONTRACTOR RESPONSIBILITIES
THE CONTRACTOR SHALL EXAMINE THE PROJECT DRAWINGS AND PROJECT SPECIFICATIONS AND SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCIES FOUND BEFORE PROCEEDING WITH THE WORK
THE CONTRACTOR SHALL VERIFY CONDITIONS AT THE SITE AND REPORT ANY DISCREPANCIES TO THE ARCHITECT BEFORE PROCEEDING WITH THE WORK.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK AND OPERATIONS OF ALL TRADES AND DISCIPLINES. THE CONTRACTOR SHALL:
SCHEDULE CONSTRUCTION OPERATION IN SEQUENCE TO OBTAIN THE BEST RESULTS WHERE INSTALLATION OF OTHER COMPONENTS, BEFORE OR AFTER ITS INSTALLATION.
COORDINATE INSTALLATION OF DIFFERENT COMPONENTS WITH OTHER CONTRACTORS TO ENSURE MAXIMUM ACCESSIBILITY FOR REQUIRED MAINTENANCE, SERVICE AND REPAIR.
MAKE ADEQUATE PROVISIONS TO ACCOMMODATE ITEMS SCHEDULED FOR LATER INSTALLATION.
FLOOR AND WALL OPENINGS, SLEEVES, VARIATIONS IN THE STRUCTURAL SLAB ELEVATIONS, DEPRESSED AREAS, AND ALL OTHER ARCHITECTURAL, MECHANICAL, ELECTRICAL AND OR CIVIL REQUIREMENTS MUST BE COORDINATED BY THE CONTRACTOR BEFORE THE CONTRACTOR PROCEEDS WITH CONSTRUCTION.
THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES BELOW GRADE AND RELATED SERVICE CONNECTIONS WITH THE RESPECTIVE UTILITY COMPANY PRIOR TO CONSTRUCTION.
THE CONTRACTOR SHALL NOTIFY MS. UTILITY PRIOR TO ANY EXCAVATION.
THE CONTRACTOR SHALL COORDINATE THE REMOVAL, ABANDONMENT AND / OR RELOCATION OF EXISTING UTILITIES ABOVE OR BELOW GRADE WITH THE RESPECTIVE UTILITY COMPANY.
THE CONTRACTOR SHALL PERFORM ALL WORK WITHIN STREET RIGHT-OFWAYS ACCORDING TO THE APPROVED CITY STANDARD PLANS AND SPECIFICATIONS.
THE CONTRACTOR SHALL PROVIDE TEMPORARY BRACES AND SHORES REQUIRED TO SUPPORT ALL LOADS TO WHICH THE BUILDING STRUCTURES AND COMPONENTS, ADJACENT SOILS AND STRUCTURES, UTILITIES AND RIGHT-OF-WAYS MAY BE SUBJECT DURING CONSTRUCTION.
CONSTRUCTION DOCUMENTS
ALL PROJECT DRAWINGS AND THE PROJECT MANUAL ARE A PART OF THE CONTRACT DOCUMENTS.
ITEMS MARKED "N.I.C." ARE "NOT IN CONTRACT." SUCH ITEMS ARE INCLUDED IN THE DOCUMENTS AND REQUIRE CONTRACTORS COORDINATION FOR CONSTRUCTION.
DIMENSIONS:
IN NO CASE SHALL WORKING DIMENSIONS BE SCALED FROM PLANS, SECTIONS, OR DETAILS ON DRAWINGS.
ALL DIMENSIONS TO INTERIOR STUD PARTITIONS ARE TO FACE OF STUD UNLESS OTHERWISE NOTED.
CEILING HEIGHT DIMENSIONS ARE FROM FINISH FLOOR TO FINISH FACE OF CEILING.
ALL INTERIOR ELEVATIONS ARE REFERENCED FROM TOP OF FINISH FLOOR BEING EQUAL TO +0'-0".
ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO CONSTRUCTION.
DIMENSIONS ARE NOT ADJUSTABLE WITHOUT APPROVAL OF ARCHITECT IN WRITING.
MINIMUM CLEARANCE AND OTHER DISABLED ACCESS DIMENSIONAL REQUIREMENTS SHALL TAKE PRECEDENCE IN ALL CASES. NOTIFY ARCHITECT OF ANY DISCREPANCIES.
DIMENSIONS AND GRAPHIC REPRESENTATIONS OCCURRING IN LARGE SCALED DRAWINGS SHALL TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS.
DIMENSION STRING TOLERANCES MAY VARY IN PRECISION. 1/8" TOLERANCE TAKES PRECEDENCE IN ALL CASES.
DETAILS MARKED "TYPICAL" (TYP) SHALL APPLY IN ALL CASES UNLESS SPECIFICALLY INDICATED OTHERWISE.
WHERE NO SPECIFIC DETAIL IS SHOWN, THE FRAMING OR CONSTRUCTION SHALL BE IDENTICAL OR SIMILAR TO THAT INDICATED FOR LIKE CASES OF CONSTRUCTION ON THE PROJECT.
DETAILS MARKED AS "SIMILAR" (SIM) MEANS COMPARABLE CHARACTERISTICS FOR THE CONDITIONS NOTED. VERIFY SIMILAR DIMENSIONS OR NOTES ON THE PLANS.
FOLLOW ALL MANUFACTURER'S RECOMMENDED SPECIFICATIONS AND INSTALLATION PROCEDURES UNLESS OTHERWISE DIRECTED.
ROOF COVERINGS AND ROOFING MATERIAL SHALL BE FIRE RETARDANT AND COMPLY WITH THE UNDERWRITERS LABORATORIES, INC. CLASS "A" U.L. FIRE HAZARD.
FIRE RATED WALLS SHALL EXTEND FROM RATED FLOOR AND TERMINATE AT A RATED CEILING ASSEMBLY.
SEE ARCHITECTURAL REFLECTED CEILING PLANS FOR DIMENSIONS LOCATING FIXTURES.
PROVIDE ADEQUATE ANCHORAGE, BLOCKING, BACKING AND FRAMING FOR SPRINKLERS, PIPING, LIGHT FIXTURES, ELECTRICAL UNITS, HVAC EQUIPMENT, ETC., AS REQUIRED FOR A COMPLETE INSTALLATION.
USE WATER RESISTANT GYPSUM WALL BOARD (W.R.) ON ALL VERTICAL FACES WHICH ARE EXPOSED TO WATER OR MOISTURE.
PROVIDE ADEQUATE ANCHORAGE FOR CEILING AND WALL MOUNTED EQUIPMENT (E.G. CABINETS, HANDRAILS & GUARDRAILS, AND LIGHT FIXTURES.)
SLOPE FLOOR TO DRAIN WHERE INDICATED ON DRAWINGS.
WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS. CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE JOBSITE AND ARCHITECT MUST BE NOTIFIED OF ANY VARIATIONS FROM THE DIMENSIONS AND CONDITIONS.
UNIT B2UNIT B3UNIT B4 UNIT B1
UNIT C2UNIT C3UNIT C4 UNIT C1
UNIT C4 UNIT C1
UNIT C2 UNIT C3
UNIT D4
UNIT A5UNIT A6
UNIT A9 UNIT A7 UNIT A8
UNIT
B5UNIT B6
UNIT B7 UNIT B8
UNIT B9
UNIT C5UNIT C6 UNIT C7 UNIT C9 UNIT C8
UNIT C5UNIT C6 UNIT C7 UNIT C9 UNIT C8
UNIT C5
UNIT C9
UNIT A10
UNIT A11
UNIT A12
UNIT B10
UNIT B11 UNIT
UNIT C10
UNIT C11
UNIT
UNIT C10
Enlarged Roof Plan - Front Balcony Bldg #1, 2, 3
02
Enlarged Roof Plan - Bldg 3 "L" Atypical Balcony
Enlarged Plan - Typical Metal Stair (Accessible Route)
TYPE "F"
TYPE "C"
TYPE "E"
TYPE "B"
TYPE "D"
TYPE "A"
CONSTRUCTION
PACInternational,Inc.AllRightsReserved. FLOOR
DIRECT
DOOR NOTES:
1.
2.
3. SEE MANUFACTURER FOR DOOR JAMB DETAILS.
4. REFER TO A9.5 FOR WINDOW HEAD CONDITIONS.
5. REFER TO A9.6 FOR WINDOW SILL AND CONDITIONS.
6.
1.