Portfolio and Technical Drawings
Extension Project on Rochester Road, Camden
This is an extension project on Rochester Road, Camden where we did an extension on the top floor. As the client is a entrepreneur, he wanted to separate his home from his office.
The biggest challenge of this project was figuring out how to communicate with the planner and city council. We needed to consider the fire regulations for both a workplace on the first floor and residential space, that being the new extension on the top floor.
As this was a complicated project, I didn’t put all drawings here. However, I put some of the drawings that felt demonstrated my architecture knowledge. As well as that, have included some pictures of the site as a working record.
Status: Project completed.
Position: Part II Architectural Assistant
Job Description:
- Prepare materials in advance of meetings
- Update drawings for the senior architect or other specialist
- Attend the site regularly and provide updates
- Attend meetings and taking notes
- Prepare material for pre planning application and party wall agreement
- Steel fabrication
- Attend meetings with QS and Building Control
3 5 0 3 5 0 E eva on C E eva on B E evat on A 38 96 38 96 38 96 38 36 S - o ou d nd Se o u e e de Ro gh up d F b c me s a PPC um um w dow S m e PPC um n um a g y em F e emen a c a L e o o h G ee o n s ec S o ou d nd F e emen a c S g do S m e PPC a m m a s s m Pa e s e ba us ad G a e g e s a e pa e W2 01 W2 1 2 W2 3 W2 0 4 W2 1 W 0 6 W2 2 W2 2 3 W 0 4 Fa 6 0 0 36 23 W2 2 RL 02 RL 5 RL 6 sh W W W W W W 900 B droom K hen L ng Room 3 1 0 D n ng 6 2 0 Laund y Room 9 0 0 3 0mm 900 Ensu e W 7 0 0 7 0 0 W W 7 0 0 RL 0 RL 4 6540 FFL Terrace Ex g o g T e r r a c e No 57-59 Rochester P ace Ex s ng roo gh E x i s t i n g r o o f l i g h t E x i s t i n g r o o f l i g h t E x i s t i n g r o o f l i g h t E x i s t i n g R o o f l i g h t Ex s ng oo gh Ex s ng roo gh Ex s ng roo gh Ex s ng oo gh Ex st ng roo gh 6850 e n e o a o e FFL 6540 FFL 4090 460 6010 2 5 FF 5 0 TBC FF 460 460 6015 4410 F 6540 FFL Ya d o d a c c s e u n R d 2 7 7 6 ww o o c m61- 3 Ro he e P a e Lo do NW 1 JU Pr pos d Se ond oo P n 9 1 3 m D w C C R a n e 1 1 1 0 @ A 17- 01 P g o Proposed Second Floor P an 6132 E n o g x s n o h s E g o RW Ra nw e o e a o e RWP R wa u e p p b v New rubbe walkwa t ead S e p E n a w RWP N w a e s F o 7 0mm h b u d g s e n N w o g N w a n d e n e b k p n R wa e u 2 3 6 0 3 4 9 5 1 5 2 0 0 m S d c v e s u e h wn e 30 30 3 8 08 3 9 09 10 10 37 37 A-A 103 B-B 104 C-C 105 D-D 06 F-F 108 C-C 105 A-A 103 B-B 104 RW 6 W 0 1 0 1 K 3 W 0 1 0 1 H 3 W 0 1 0 1 F 2 W 0 1 0 1 D 3 RW1 1 0 W 0 5 RW 1 4 RW1 0 RW1 1 0 RW1 1 0 W 0 1 0 1 F 3 W 0 1 0 1 D 2 W 0 1 0 1 H 2 W 0 1 0 1 K 2 Ex s ng oo gh F-F 108 RL 01 Rochester P ace Ex s ing Fi s F oor Roo 3 8 2 W2 0 0 W2 3 H1 W 0 F W2 0 1 W 1 W 2 0 2 3 W2 0 4 W2 1 5 W2 1 6 W2021 W 2 0 2 4 W2 2 2 W 1 W 2 0 4 2 W 2 0 4 1 s n c u e m b w o e emo d 32 32 G e n g o e a 201 275 03 75 202 275 3 2 1 3 2 1 320 317 33 36 F b eme p n s n a F e c me p n s c n w F e c me p n s c n w F b eme p n e n o wa s e e d o h s n o wa p me e o p b s o e n e n e o wa e ow w d ws s e n e o n o wa n u a d n e h c o w F b em n a e o h s e o wa D-D 06 31 31 NOT A x g o g u n & wo d o e em v d o ew e s o 3 3 1 0 7 37 4 5 0 1 11 9 M P L J D E G H F K 7 3 4 5 6 2 8 2 mm d a o s WC R2 0 Ensu e Mas e B droom 9 0 0 9 0 0
1 8 0 0 TO S 35 930m FC L C R A N K LE V E L 38 478m 38 166m FFL 35 993m M A X H E G H T 38 960m S prem ro ng and nsu a on o de a P a r t y w a l l n u a ed d y n ng o pec a on New ound p oo oor ng o de a E s ng o s s o ema n Ex s ng p as e boa d o ema n New ep o med o de a Of ce s ud o New ound p oo oo ng o de a D y ng o de a S ee uc u e hown do F b e cemen pane on mbe ame wa o De a 312 Ex ng oo gh o ema n m m 5m CA E o on e s a c e s G e n d Hou e 0 a n R ad on on N22 7DE e 0 37 6 6 6 www n r n c u m o n n w a m a b d m n b o a a e n m w E A o o m a he a e n m A m a m e o m m - m n n u m e h e m e 61-60 R oches e P ace London N W 1 9JU S ho S ec on C C R n D wn NBC Ch k d b a n e e a 04 1 1 c 1 0 @ A3 317-105 P R OS F S E P m a P n n T d Co u o Ex ng me a oo de k ng o ema Ex s ng oo gh o ema n Po yes powde coa ed a um n um g a ng sy em nsu a ende o De a 310 FFL 36 007m De a 3 4 De a 374 F b e cem as a pane R 2 2 n p d 7 6 8 9 Sto Rende o s m lar app oved nsu ated ender sys em ted as per manu ac u ers recommendat ons Co our as per e evat ons 18mm WBP Plywood 150x50mm ana ised mber s ructu a member 12 5mm Dup ex p asterboard 240 Sca e:1:2 6 Scale:1:2 150 DPM W I N D O W 150mm Rockwoo nsu a ion F bre cement pane F bre cement pane A um num corner r m (no shadow o nt Secret f x ngs back o s ruc ure Aluminum r ms wi h shadow detai F bre cemen pane F bre cemen pane n o e a h e G ee s d Hou e 5 S o Ro d L nd n N 2 DE T 07 7 63 5 0 www n o e c u a n e R v n 2 3 A 0 D aw b LC Ch c ed b RE Re Da e 1 3 3 S a 1 5 @ A3 317- 383 A e e e n T d n n w w S o m e a b o T p u d o n a m o a w p N L o h Ve N e n d a p e e e m m n o m - e n u e m m n a h e e p PU PO E O SU P e m n y P nn n T n e Con c o 61-63 R oches er P ace, London N W 1 9JU Corner Detai
Takao Long House, 5 floors building combining work and family life. Through void space, nature is led into the middle of the longhouse.
A porous facade permeates air flow while limiting the sunlight and reducing heat adsorption, minimising the use of air conditioning.
Status: Project completed.
Position: Architectural Designer Job Description: - Site Planning - Architectural design - Law review, - Apply for Planning Application
Projector Screen 182*212 182*212 182*212
Takao Long House
After graduating from university, I joined Shigeru Ban + Key Stone Architects. As an architectural assistant, had the honor of being a part of the Tainan Art Museum project. This role provided me with experience in large-scale projects and the opportunity to collaborate closely with various experts, including structural engineers, materials engineers, interior designers, and government officials.
Status: Project completed.
Position: Part Architectural Assistant
Job Description:
- Prepare materials in advance of meetings
- Update drawings for the senior architect or other specialist
- Attend the site regularly and provide updates
- Attend meetings and take notes
This page illustrates our collaboration with structural engineers. It’s crucial to deliberate on the setup of beams and columns, especially when the building’s volume might exceed the city’s typical pattern.
Additionally, in light of potential earthquakes, it’s imperative to evaluate whether the foundation is robust enough for the building. My daily responsibility involves attending meetings, summarizing discussions, updating drawings, and liaising with specialists.
Tainan Art Museum Building 2
This page illustrates how we decided on the roof canopy.
As it is an irregular sun shelter on the rooftop, we need to find the prototype and use this prototype as a base to develop the entire layout of a steel beam.
Also, need to think about the weather conditions in Taiwan.
As a tropical country, there are usually thundershowers in the afternoon, therefore, each angle on the shelter influences the quantity of water that can exit via the drain which is important.
Chatsworth House
After one year of working at Norton Ellis Architects, changed my company to Inskip Gee Architects. was fascinated by classic buildings and wanted to find an opportunity to practise balancing classic and modern design. I think it was a good chance to gain a working knowledge of conservation projects, due to there being a lot of Grade and Grade II buildings in London.
At the same time, I think it was a good chance to learn the government process when you want to work on a listed building.
Status: In Progress.
Position: Part II Architectural Assistant
Job Description:
- Prepare materials in advance of meetings
- Update drawings for the senior architect or other specialist
- Attend the site regularly and provide updates
- Attend meetings and take notes
- Working on Planning Application and Listed Building Consent
- Work closely with clients, archaeologist, interior designers, and QS.
Accessible and Inclusive Play Spaces
After World War ll, European people looked forward to the new life in the peace period; they would like to go back to life as it was before the war. A Dutch architect Aldo van Eyck and his team started to design several projects all about the play space in Amsterdam, Netherlands (Withagen and Caljouw, 2007); he tries to create a space where the residents in the city can gather together and spend time with friends and family, allowing them to forget the sadness brought by the war. This moment is the first time people realised that play space could create a sensation of happiness for people.
With the changing times, play space has a new function in the city for the resident besides increasing happiness; place space provides the space for people to catch their breath in this high pressure working society. Balancing work and life is a new trend in the present day, people understand gradually that mental and physical health are equally important (Eusuf et al., 2014).
According to the research from the department of children, schools and families (DCSF) (Shackell et al., 2008) the play space was defined as a playground or play area; this place should provide a safe and interesting space for the children in the city. The play spaces are normally located in the city centre, green belts, and parks; hereby, the play space not only belongs to children but also creates a space for adults to relax and gather with friends and family (Withagen and Calijouw, 2017).
Paths of Resonance - Learning Space
For The Blind
Sight determines much of how the sighted perceive space and navigate through space. Yet, for the blind, the same is done through mainly touch, echolocation and memories. Sadly, much of our public spaces are built in favor of the former, at expense of the latter. What if our public spaces are designed to accommodate the needs of not only the sighted, but the blind as well, creating an equal platform for learning, establishing social connections, and gaining experiences through sensory stimulations. What will the architecture be like?
1F Plan B1 Plan
nor one sarchi ec s GreensdeHouse 50S atonRoad LondonN227DE Te 07375636560 wwwnor one scouk ane 61-63RochesterPace, LondonNW19JU WCR203 Revson: Drawnb : LC Checkedby RE Rev Date 090323 Scae 120@A2 317-403 WCR2.03 A dm n o s o e he d n a d n ds e an y o e po ed o heAc c p c n u n T sdawng o e a nc n n nw h h d wn s n d g o e ohe c ns n Sampe o a m e as b p vde c mme pp v o o ab c n on c on T e p ua d n c n ue n c n ean p n e o c n c A aemen o a e h s p ua a o hs op a m d w u h e p sb n e a N o E Ac cs d o eVen o o Le s s No e e aemen o a e h s p u sas o h p p yae o e d n s emens e e e a on o a A m a ueme saeap o ma a dn e p n b y s a en o n e ms o ms- eme a d n nen gp c a e na m s s y h m e e b ns e n o ew ea o he o e n s e c o hes eme sc n n d n e e a ua a s 0 3No nE A h e L d PURPOSEOF SSUE Pe mnay Pannng Tender Cons uc on 0 1000mm 2000mm SCALE 500mm PLAN REFLECTEDCEILINGPLAN ELEVATIOND ELEVATIONA ELEVATIONB ELEVATIONC RL.04 A A B B C C D D RL.04 1 1 0 0 CL 7 2 0 4 7 5 1 6 4 0 150 100 150 100 2 2 8 5 2 0 0 6 1 0 4 7 7 7 2 0 2 1 8 0 2200 150 100 150 100 1500 2 4 8 5 150 100 150 100 150 100 150 100 1 5 0 0 2200 150 1100 1 9 4 5 3 4 0 2200 1 5 0 0 3 0 0 850 800 Fuuredoorpostonshoweddoted 1 4 6 0 850 800 2 0 0 0 Futuredoorposiion showeddoted LEDuplghs Extractlocaton n wala hgh eve Exrac ocaton 250 250 1 2 3 4 4 4 5 6 8 7 FinishesKey: 1 WalltileMattPorcelainTilePLAINPhard 2 Mirror 3 Washbasin 4 Handrail 5 Toilettank 6 Walllight 7 Toilet 8 WalltileMarvelMattAlmondMilkWallTiles
nort on e ll s a ch tec s Gree ns de House 50 St at on Road London N22 7D E Te : 07 375 63 6 5 60 www no tonel s co uk a n e 61-63 Roche ster P ace Lon don NW1 9JU WC an d Sh ow er R2 03 Re s on Re B: 26/04/23 Gene a Upda e A 05 Re C A San a rywa e updated + Doo w d h updated Drawn by LC Checked by RE Re v C Date 09 03 23 Sc a e 1 20 @ A2 317 - 403 WC and Shower R2.03 A d m s o s b e k d n a d n d s e p n y o e po e d o he A c c p o c n s u n T s d a w ng o e ad n on n w a h d w n s n u g o e o he c s n Samp e o m e a b p v de c mme p v o o b c on on c on T s p u a d o no c n e n c n e n p o e o c n c A a e m n o n a e n h s p u s a o h o p a m d e w h u h e po s b o e N o E s A c c d o e V n o o e s s No e e a e m n o a e n h s p a u s s o p p y a e o e d n s e men s e e en a n o a A mea eme s a e a p o ma an n e p n b y s a en o n e m o o m s- e men a a y n n n p c a e na m s s y h em e e b s e n o e w e a s o he c e n s o e h o h e eme s c a n d e e p u a p a 0 3 No n E A h e L d PURPOSE OF SSUE P e m nary P ann ng Tende Cons uc on 0 1000mm 2000mm SCALE 500mm REFLECTED CEILING PLAN ELEVATION D ELEVATION A ELEVATION B ELEVATION C RL 04 2400 1500 2 3 3 5 1 5 0 0 2400 Fu ture doo r pos on showed do ted LED s r p g hts Ext ac o ca t on n wa a t h gh leve Ex ract o ca i on Fi ni she s Key : 1 Wall tile 1 - Concrete Porcelain (7. 2m ) 2 Painted Wall 3 4 5 Ceiling Type 1 - Painted Plasterboard 6 Floor Tile (1 9m ) Door - Painted Mirror 7 Wall tile 2 (2 7m ) 2 2 2 LED s rip g h s 3 1 6 7 4 Hand drye PLAN RL 04 A A B B C C D D 2400 Fu ture doo r pos t on showe d do te d 5 Ste p 800 375 650 9 1 0 800 1500 Ste p 250 3 3 2 3 3 5 2 1 8 5 2 3 3 5 4 LED s rip g hts 1500 800 7 5 8 5 0 4 3 0 8 5 0 1 1 1 5 910 1 1 2 Shower 800 850 1100 7 2 0 3 0 0 1 2 0 0 1 5 0 800 2 5 0
FinishesKey:
CeilingType1-PaintedPlasterboard PaintedWall Mirror- 8
nor one sarchi ec s GreensdeHouse 50S atonRoad LondonN227DE Te 07375636560 wwwnor one scouk ane 61-63RochesterPace, LondonNW19JU WCR204 Revson: Rev A 29 03 23A ee a onsupdated A 04 Drawnb : LC Checkedby RE Rev A Date 090323 Scae 120@A2 317-404 WCR2.04 A dm n o s o e he d n a d n ds e an y o e po ed o heAc c p c n u n T sdawng o e a nc n n nw h h d wn s n d g o e ohe c ns n Sampe o a m e as b p vde c mme pp v o o ab c n on c on T e p ua d n c n ue n c n ean p n e o c n c A aemen o a e h s p ua a o hs op a m d w u h e p sb n e a N o E Ac cs d o eVen o o Le s s No e e aemen o a e h s p u sas o h p p yae o e d n s emens e e e a on o a A m a ueme saeap o ma a dn e p n b y s a en o n e ms o ms- eme a d n nen gp c a e na m s s y h m e e b ns e n o ew ea o he o e n s e c o hes eme sc n n d n e e a ua a s 0 3No nE A h e L d PURPOSEOF SSUE Pe mnay Pannng Tender Cons uc on 0 1000mm 2000mm SCALE 500mm PLAN A A B B C C D D REFLECTEDCEILINGPLAN ELEVATIOND ELEVATIONA ELEVATIONB ELEVATIONC 1 2 8 5 100 6 0 0 250 2 4 8 5 2200 1000 4 1 0 4 1 0 8 5 0 2 4 8 5 1000 8 5 0 100 100 100 100 1 0 0 0 2200 9 0 0 150 100 100 1530 975 975 CL
2
1 WallType1-Concreteporcelaintile
FloorTile 3 4 5 6 Door-Painted 7 Walltype3CeilingType2-StainlessSteelPaper
250 1000 1 0 0 0 9 0 0 2200 1 1 3 5 475 50 LEDStrps otop LEDStrps tosides LEDStrps to opandsdes 1 1 3 5 LEDSrip LED 1 1 1 2 2 4 5 Paintedpaserboard toLEDrecess 6 7 8 8 1 1 3 5 Sanlessstee paper inshtocurved quadran celng 5 2 2 Painted plasterboard toLEDrecess 8 8 Handdryer 5 5 5 5
Proposedsotwoodhandrai
Repacementcross bracngsteelshown ngreentobe added
Crossbracngstee shown nred obe removed
Proposedsoftwoodsarcase
Newpariionusng 75x50mmtana sed imber suds@400mmcentres, wth12WBPplywoodand 125mmdry-inng+skin
NOTE CONTRASTNGNOSNGDETAIL FORBUILDNGREGULATONSFOR COMMERCIALSTARCASE(PAINTED NONSLP)
Exisingwa pariion ine
Steelshownin redtoberemoved
Exsingfoor
sta s 100
Proposed
sotwood
6 7 6 7 K ----FFL ----FFL New50mm damee steel handra s K J 9 0 0 1 6 7 250 25 RevB 120 109 1 3 4 5 6 7 8 9 10 13 14 2 250 25 250 250 250 250 250 2 5 0 25 0 2 5 0 2 5 0 250 250 250 15 3 0 0 1000 1 0 100 11 12 7 0 56 78 J 1 3 5 0 1 0 0 1 0 0 0 1 0 0 6 6 1350 1200 escapestarcase Newpariionto ne upat hspon 1200mmwide
coat 100 100 150 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1200 2layersof125mm freboard 2 ayerso 125mm ireboard nor one sarchi ec s GreensdeHouse 50S atonRoad LondonN227DE Te 07375636560 wwwnor one scouk ane 61-63RochesterPace, LondonNW19JU Commercia starcase Revson: RevB 21/02/23A 02 RevsedSta caseWdh Drawnb : LC Checkedby RE Rev B Date 151116 Scae 120@A2 317-201 Commercialstaircase A dm n o s o e he d n a d n ds e an y o e po ed o heAc c p c n u n T sdawng o e a nc n n nw h h d wn s n d g o e ohe c ns n Sampe o a m e as b p vde c mme pp v o o ab c n on c on T e p ua d n c n ue n c n ean p n e o c n c A aemen o a e h s p ua a o hs op a m d w u h e p sb n e a N o E Ac cs d o eVen o o Le s s No e e aemen o a e h s p u sas o h p p yae o e d n s emens e e e a on o a A m a ueme saeap o ma a dn e p n b y s a en o n e ms o ms- eme a d n nen gp c a e na m s s y h m e e b ns e n o ew ea o he o e n s e c o hes eme sc n n d n e e a ua a s 0 2No nE A h e L d PURPOSEOF SSUE Pemnay Pannng Tender Cons uc on J K J K 6 6 7 7 S2 S1 S1 S2 Section:S1-S1 Section:S2-S2 Plan 3Dviewofstairs&steelwork 0 1000mm 2000mm SCALE 500mm
4gangswtch paecicuts C1,C1a,C2andWL
LightingNotes:
Drectiona Downight(typeA)
Externalwal
Walmountedup-ight(typeI) Pendant ightDmmable(typeC)
ACCeiingopenng
LEDBulkhead(typeH) LEDStrpLights S Externalspurlightsonroof
Pendant ight(typeD)
Directonal ightDmmable (typeE)
LEDstrippendant(typeF) u EmergencyExtLight
LEDBulkhead(typeG) E S H SmokeAlarm Heatdetector
4gangswtch paecrcuts C1-C5
4gangsw ch patecrcu s C6-C9
3gangswtch paec cuts C10-C12
3gangsw ch patecrcu s C6a,C8a,and C3a S
no tone sa chtecs GreensdeHouse 50Statonroad LondonN227DE Tel 07375636560 wwwnorone scouk ma @norone scouk ane SecondFloorRelectedCeiing Plan Drawnby LC Checkedby RE Rev: H Dae 180522 Scae:150@A2 317-115 A m n o s o e h c edons e ndan ds e an obe p e o h A h c p c n u n T d wn obe ea c nun nw h o e aw g n d g ho e h c n u ans S m e o a ma as o e o d d omme p o o a c n o s c o T e e a c a d n on u n on u a y a n o a on a emens o ane h s a ua a hs o e a mad w ou h e p n b y n e a o N o E A h e s d o heVe o L s o N neo he eme s o ane s p ua a o hs op a obe e edonass eme so pe e a o s c A m a u m a a po ma a d o s on y a e o an e ms n m -s eme a d n e d g u ha e o n n mus s h m ev y n pe n ohews a o h o c e s e c o h sa m c n n d n e e a c a a s 2 2 N o E d PURPOSEOF SSUE Pe mnary Pannng Tender Constucton 60-61RochesterPace LondonNW19JU Revson RevG Sw chesandRWPupdaed RevH 180423To et ayou updaed C6andC6a gh ng oopupdaed and angedwndow&deckngupdated SecondFloorReflectedCeilingPlan Exs ngroo ghts T e r r a c e Lneo cranked roo above 6540 FFL 4090 460 6010 460 460 6015 4410 Fal Existngroof ghs Existngroof RWP Ranwaer ou etpipe above RWP Ranwate oute ppe above Stee posts RWP 1700mmhgh obscuredglass screen 2 3 6 0 3 4 9 5 1 5 2 0 W20301 W203H1 W203F1 W2021 W2022 W 2 0 4 2 W 2 0 4 1 Lneo cranked roo aboveRL02 RL01 308 308 375 375 W2011 W2012 W2014 W2015 W2016 W2013 6225 FFL W 2 0 2 3 W 2 0 2 4 Fxed wndoes RL05 RL06 5 1 1 1 2 1 11 1 WC R204 RL03 RL04 WC R203 304 304 310 310 311 311 312 312 328 328 329 329 201 275 203 275 202 275 3 2 1 3 2 1 336 336 337 337 320 275 Exs ng copng Newcopng Newpanted see ra ng fxed oback ofupsand Ranwaer oute nsuatedrenderto wa beowwndows nsuatedrenderto o hissecionofwa Fbrecement panes o hs sec ono wa Exstngpary wa MEETNG ROOM R202 BREAKOUT SPACE R205 OPENPLAN OFFICE R201 ACoudoorun 309 309 LED nce ng LEDince ng Rev H Rev H Rev H Foor ghsindecking shown ndca vey B B2
lght(typeB)
EmergencyLghtor EmergencyPack E
Wal light
S S S S C9
C2
C6 C4 C3 C7 C8 E3E2 WL C5 C1 C1a C6a C8a
S
E E S E E E S C3a S S S 7 9 9 2 M P P L J E G H F K 6 5 4 3 8 7 3 4 5 6 2 8 7a M L E F G H J K 4 5
S S