YANJIE_HUANG_GSA_Architecture_DipArch

Page 6

YANJIE HUANG Architecture (DipArch) Application Reference: 489574611 Apply for Glasgow School of Art Portfolio.

YANJIE HUANG

Personal Statement

Education

Work Experience

Activities

Name Nationality Birthday Marrage Current Living

Yanjie Huang China 30/March/2000 Single Chengdu, China Contact

A motivated and confident professional graduated architecture student, with enough social awareness. I am interested in the social value of architects' role and how architecture impacts society and public behavior. Good listening, communication, and collaboration skills and willingness to learn new things.

Mail Phone Wechat Linkedin

y.huang0330@gmail.com +86 19981636177 MEGAAimer http://linkedin.com/in/yanjiehuang-480385223 About

University of Liverpool

September 2020 - June 2022 Bachelor of Arts, BA Architecture, RIBA Part I/ ARB

Xian-Jiaotong Liverpool University Feburary 2019 - June 2020 BA Architecture, RIBA Part I/ ARB

Xian-Jiaotong Liverpool University September 2018 - January 2019 Business and Management

Language

A3 Architecture Studio/ Sichuan, China

2020 July - 2020 August Intern Assistant.

I work on architectural publications on WeChat and poster design. This experience helps me understand the importance of communication skills to present architectural projects to the public. http://www.scsj.com.cn/index.aspx

Mandarin Native English Fluent

Alternative Endings Workshop/ LAC Studio X DEZACT

2021 July - 2021 September Hadin Charbel, Deborah Lopez

A research lead architecture workshop focuses on building worlds that will be influenced by different variables, reconstructing a combination of existing and potential realities which are to include buildings and landscape. During this workshop, I was exposed to the front-edge design tools, processes, and presentation skills, and I realized the importance of research, adopting new technologies into architecture design, and the potential of architecture.

Vice President / XJTLU Modeling Club

Communicate & arrange task with fellow departments.

Leader of Publicity Department / HMAK Kendo Club

Prepare activity proposals & wechat articles.

September 2019 - June 2020

September 2019 - June 2020

Technical Skills

September 2018 - June 2019 Help with composing and layout online articles & posters. Publicity Department / Students Architecture Society

Publicity Department / XJTLU Archery Club

September 2018 - June 2019 Help translating Chinese articles into English version & Sharing architecture experience.

Windows Mac OS Word PowerPoint AutoCad Sketchup Rhinoceros Grasshopper Unity Vray Photoshop Lightroom Illustrator InDesign

P 10-17

BA2 Coursework, 2020 Reflection of the fragile relationship between organizations and the public.

Final Year Project, 2022 From research to manufacturing, experience the whole production journey.

Other Works & Hobbies

02. Research
03. Screen
Deal
05.
01. Lifeboat Station
Center
New
04. Arctic Hotel
Other Works P 2-9 Marcus Schofield Ranald Lawrance, Hazel Weir Hadin Charbel, Deborah Lopez
P 18-24
Group Project ,2021 Imagineering a sustainable screen new deal for Disney company. P 25-29 P 30-30
Individual Project, 2022 Discovering the natural forest through the elevated sky path. Contents 1

Project I

RNLI Lifeboat Station

Liverpool, UK

2020 Oct. - Dec.

ARCH202 Design Coursework

Tutor: Marcus Schofield Individual

2

RNLI History Project Brief

The project is to build a lifeboat station for Ainsdale beach, “one of the premier beaches in the UK for extreme kite activities, with zones set aside for kite buggy & land board". The chosen site for the RNLI station sits in the sand dunes above the beach, in an area of approx. 9000 sqm.

There are lots of people who are always ready to serve the public in obscure ways, police officers, street cleaners, firefighters… These are characters who are easily ignored by the enormous while they do lots of contributions to society. For the aspect of beach safeguards, people will not notice them even when they are in trouble until they are saved by the brave safeguards. In the lifeboat station design, I want to stress how the Ainsdale beach is protected by the RNLI. This idea will not only improve the social esteem of the RNLI volunteers but also make the tourists feel safer.

For a charity-funded organization, it is important to let the public know how it works and how the donation is used if the work of the RNLI lifeboat station is transparent and accessible to the public while not interrupting volunteers’ work. Since it is a lifeboat station, working efficiently should be one of its basic requirements

Working Method

Workflow

RNLI needs to work more effectively in partnership with other organisations and identify how to influence lifesaving through policy-makers and regulators.

Influence Supervise

RNLI can prevent more tragedies through the lifeguard service around the UK and Ireland – and help international communities to set up lifeguard services.

Rescue

While maintaining our core, world-class lifeboat and lifeguard services, we will further develop our relationship with other search and rescue organizations in the UK and Ireland to help save more lives.

Educate

Our education work can save more lives by promoting safety through behavior change campaigns, products and messages, and by working more closely with communities.

2001 1936 1824 Sir William Hillary’s vision for a service dedicated to saving lives at sea became a reality in Bishopsgate’s trendy London Tavern on 4 March 1824. Foundation The arrival of the motor lifeboat Royal Silver Jubilee at Wellsnext-the-Sea in Norfolk marked the end of the iconic sight of horses pulling lifeboats. Last horse-powered launch RNLI lifeguards starting patrolling beaches in 2001 and are now an essential part of our seamless rescue service from the beach to the open sea. RNLI Lifeguards In-house manufacture of the Shannon class lifeboat brings a new era of lifesaving to the RNLI. The Shannon Class lifeboat 2013 Emergency Detected Command Center Drag ship out of ship yard Drag to the beach Emergency Happened Search to rescue Concept idea: Exhibition inside the lifeboat station
3

Massing Models

Center Atrium

To priorate the main lifeboat for the station, the main boat hall is located at the center of the volumn and all the function areas are located around.

Clear the center mass to create an atrium for the main boat hall and create a circulation around the boat for maintenance and repair.

Function Division

The surrounding volumn is divided into four main sections, including public Space, control room, staff working space, and staff living space.

Reducing Public Opening

Creating a front opening underneath the control section for the lifeboat to get in and out and reducing the volumn for public functional space to ensure the landslide of working space.

Creating a clear wide opening for the public to enter and remaining a relatively open space for the public. The staff living sector is also reduced to provide better floor height for public openings.

Public Circulation & Ajusting

Adding circulation around the main boat hall for the public, allow them to have a full view of the inside lifeboat station. Compressor the working area to create a staff corridor across the whole working section. Enlarge the Control room to the public part to communicate public with the station.

4

Staff Corridor

Set back the working and living volumn and create a corridor through the transportation core for staffs and crews to connect their workflow.

Isometric

Rooftop Sun Shading

The prefabricated concrete shading sustitute direct sunlight with soft indirect natural lightning, preventing potential damage and interuption to the boat and work.

Staff Bedroom

Bedrooms for staffs working for night shift.

Final Model

Adding facades with rooftops, the public volumn used glass cladding to keep its transparency. Special rooftop sun shading is added to the middle atrium to control natural sunlight.

For crews to change from regular suit to working suit & equipment.

Crew Changing Transportation Core

Connect staffs' working section & living section while works as a boundary to divide them.

Staff Meeting Room

For crews training and staffs discuss daily working and emergency solution.

Crew Dayroom

A small balcony specificly for crews and staffs to take a break or feed themselves while working.

Control Room

Overall control center to monitor and direct all the emergency event with wide view angle and different equipment.

Public Circulation

A circulation for public to walk around the main hall, allow them to observe how the lifeboat station works.

Reception / Lobby

Public enterance.

Toilet

Small unsecual toilet for public use.

Storage

A circulation for public to walk around the mainboat hall and observe how the station works.

First Aid

Place for simple emergency treatment of injuries and wound.

Main Boat Hall

The center of the station. Specifically for daily maintainance and repairment for Shannon.

Small Boat Hall

For small lifeboat storage and maintainance. Workshop & Power Plant

Technique workshop for small quipment maintainance and repairment. The power plant supply electricity for

5
Senarioss 6
7
Section 8

Detail Axonometric

solar shading Steel structural tube Steel connection node Glass panel
solar shading Solar shading system Exchange room Repair
Tourist Tunnel
Concrete
Concrete
workshop
9

Project II

Plastic Research Center

Liverpool, UK

2022 Feb. - May.

BA3 Final Year Design

Tutor: Ranald Lawrance & Hazel Weir

Individual Project

10

The Deglobalization Reality

Age of 'Slowbalization'

Deglobalization

The COVID-19 pandemic illustrates the danger of relying on global supply chains for essential medical supplies, while climate change demands reductions in the enormous carbon footprint of international trade. Which represents the United Kingdom now facing the challenges of producing products in a domestic context sustainably. In return, to contribute as part of the UK's new production industry, the project is proposed as a university facility to explore sustainable production with recycled plastic material.

Masterplan

The PlayStation 5, along with about 70% of the world's toys, is made in China - and the cost of getting supplies to the UK has gone up hugely.

Importing also has suffered during Covid, paying elevated costs and dealing with unreliable shipments.

Shipments have sometimes taken almost double that to arrive.

Mass Development

Containers are scarce in Asia, because of the effects of the pandemic on international supply chains, so shipping charges are now 10 times higher.

Structural Strategy

Campus Delivery Accessability Activate Ground Floor
Russia
Spanish
Great
Outbreak
Industrialization Cheaper Labor Cheaper & Faster Delivery
World War
communist revolution
Flu New Immigration restrictions
Depression in 1929
in protectionlism in 1930s -Econimic Rebound -General Agreement on Tariffs and Trade -The Soviet states and China has not participated yet -The developing world choose to import substitutions and remain isolated -Developing countries began dismantling trade barrier -The fall of Berlin Wall and collapse of Soviet Union -Improved transportation & communication technologies -Creation of global supply chain
11
Light
Social & Communication Shadow Labs & Workshops Activities Application of the Screen Example 1. Example 2. Example 3. Ground Level Wall Vault Height Roof opening Summer Winter Final Section Model Central Vault | Light, storage, screen Model Development 12
Sunlight
1 2 3 4 5 6 7 1 2 3 4 4 7 5 1 2 3 5 6 6 7 GF Exhibition Storage, Workshop1 Takeout food, Baby Care 1F Kitchen & Lounge Workshop 2, Cafe, Meditation Lecture Hall 2F Production 3F Development 4F Research 5F Management Synthesis Processing Characterization Data Interpretation Performance Evolution Management Initial Proposal Group Discussion Trial Production Trial Production Workflow & Working Circulation Workflow Research & Development to Production Production Feedback to Research & Development 13

Atmosphere Facade | Transition: floor to floor Transition: through movement

Lecture Hall, Completely closed and the nature light is limited Perspective Renders

Meditation Space Semi-closed, some outside view, not influenced by outside Physical Models Same perspective rendering Research Floor Application Floor Meditation Eating Space Eating to Meditation Meditation Space

July 20th, 15:00 Product Exhibition November 13th, 11:00 Product Trial Production November 13th, 13:00 People Resting 14

Research Floor Application Floor Eating Trial Production Meditation Research
Eating Space Open, more sunlight, more view

Sun Shading Device

The sun shading device is majorly used to control the interior light condition and prevent solar radiation to heat the building directly.

Specifically, the shading device in meditation space prevent the sunlight come into the space directly during most of the day time, ensure the consistent atomosphere of the space.

1:20 Detail Drawings 1:50 Section Drawing

15mm safety glass Concrete, vapour layer, 76 mm polystyrene insulation upon 200mm concrete floor

3 mm anodized-aluminium mesh panel, fixed with steel clips.

13mm aluminium sheeting, 24mm ventilated cavity, moisture-diffusing windbreak

Simulation Example in June 21st

12:00 13:00 14:00 15:00 16:00

Materiality Light Condition Comparison

3mm white aluminium mesh panel

450/150mm plastic wood, made from useless plastic rubbish collected among the city, which claims use 66% less energy than virgin plastic production.

305/105mm steel beam, used to cantilivered new floor structure

The light condition of exsisting EE building is more direct and the direction of light is simple, therefore only small parts of the building can benefit from the natrual sun light.

After conversion, the building have more openings allowing light to come through, and the special opening design keep the sunlight indirect in staff's working space to ensure the consistency.

White extrude aluminium sheet used for upper floor facade construction

Dark color corrugated aluminium sheet for lower floor facade construction

steel hollow section melt to 305/105mm beam, bolted to main structure

double galzed window, 2*6 mm galss with 13mm cavity in red aluminium frame

16mm plasterboard, framed metal supporting structure with 140mm insulation, 16mm plaster board

200/16mm steel panel welded to steel flat then bolted to steel hollow section

450/150mm plastic wood rotatable sun shading device, bolted to 200/300/25mm aluminium channel

6/13/6mm double glazed curtain wall, fixed to aluminium frame, hold with steel plate melted to beam

150mm concrete floor on steel decking panel.

310/120mm beam cantilivered on 250mm exsisting concrete floor

50mm insulation with waterproof layer

Steel structure to hold laminated timber cladding

Before conversion After Conversion
|
Technique Details Facade
Embodied Carbon 15

Block A Exhibition & Research Center

Block B Master Students Learning Sector

In this afternoon’s meeting, we are going to discuss with manufacturers.

Ashton St

Today’s dancing performance is actually amazing!

Sunken Plaza

The sunken plaza provides space for public activities. e.g. music & dancing performance.

Lecture Hall

The lecture hall is used for lectures, meetings for working staff, and movies for university activities.

Meditation Slope Slope to create the atmosphere for yoga, snape, reading and meditation.

Kitchen Preparing food and giving space for public visitors and working staff.

We can finally jog without the interruption of cars.

Open Chatting Zone

Open chatting zone between Block A and B to provide casual chatting and study space.

Students, the next chapter of our research will focus on...

Group Study Closed group study private study and group discussions.

Public Experience, Researcher Offices, Production Site Management Offices
Design Phase II 16
Researchers Office, Lecture Room, Student Study Space Laboratories

Space

Light Diagram

Shall we study together until 5 p.m.?

Connection Bridge

Room study room for intensive discussions.

Cafe Cafe bar in the middle building to energy and juice up the students

Self-study Zone

Students and Researchers could use self-study zone as daily

Balcony Outdoor balconies give space for students and researchers to refresh

17

Project III

Imagineering a Screen New Deal

Los Angeles, US

2021 July. - Sep.

Tutor: Hadin Charbel, Deborah Lopez Groupwork Project

Yanjie Huang, Lihua Feng, Yucheng Kuang, Jiangwen Lu

(All the drawings are produced by the applicant if not specified)

18

Proposed Senario

Street
View
Waiting Line Transportation Filming Movable modular streetview to split public and filming sectors. Props to create scenarios for the waiting lines between Props to create scenarios for the waiting lines between Filming with exsisting props inside the Disney Park Narrative Site Plan
Lihua Feng, Jiangwen Lu
19

Workflow Methodology

02. Split the filmsets into voxels and protect them within the exterior modular wood skeleton structure.

01. Filming at the sound stage with the filmset.

04. Arrived at Disneyland, the filmsets will be handed to the transfer apartment and sent to a specific selection sector later.

03. Then the filmsets will be loaded into the truck containers and transferred from the production sound stage to Disney Resort.

05. Filmsets are processed, selected and recomposed inside the transfer center and waiting to be dispatched.

06. Filmsets and voxels travel through the Disneyland Resort and eventually arrived at a specific site.

07. Finally, the tower crane or craw crane will lift up the filmset voxels.

08. Selecting voxels to construct functional space and storages depending on their characteristics.

Lu
Lihua Feng, Jiangwen
20
Entertainment Entertainment Vertical Height Gallery Gallery Storage Commercial Exit Warehouse Commercial Isolate Storage Transport Astro Orbitor Main Road Before After Connect Front Facade Connect North Entrance Conversion From Moive To Reality Original Site Function Simulation Function Collapse WFC Generate Artificial Modify Explode Generation Rules Modification Experiments 21

Waiting Line

Exsisting Structure

Gallery & Souvenir

Warehouse & Logistic
Library
Voxel
Starwar Guardians of the Galaxy Ironman
Lihua Feng 22
Dr.Strange
Partial Application

Warehouse sector is a combination of different types of manual operationg space and transportation voxels.

The manual operating space is for voxel storage while the transportation voxel is for filmset storages.

Logistic & Transportation Voxel Warehouse Manual Operation Monorail Transportation Rooftop Supporting Structure Vertical Delivery System Non-structural Wall Duo-layered Facade System Outside Voxel Facade Inside Decoration Facade Variable Wall System Vertical Delivery Horizontal Delivery System Transportation Voxel Manual Operating Space Voxel Selection Inner Wall Voxel Structure Voxel Facade Voxels Individual Voxel Voxel Groups Special Character Voxel Shelf Structure
Structure & Logisticy 23

Isometric Sectors

Lihua Feng

Image 1: Gallery of the Dr.Strange

A finished structure constructed with the existing props and voxels is used as an immersive gallery for Dr.strange's fans.

Image 2: Reconstruction

The skeleton frame is conserved while the prop voxels are refurbished or substituted with new voxels to form different themes.

Image 3: Real Scene of the Dr.Strange

Combined with a physical replicate of the iconic Sanctum Sanctorum from the film and 3-D Holography to create an immersive scenario.

Image 4: Starwars' Space Fight

Using the existing voxel form Starwar walls to recreate the fight scenes in the Death Star and the fight scene is recreated with 3-D Holography.

Function Circulation
Appearance Entertainment Gallery Warehouse Waitingline Outside Logistic Interior Logistic Outside Layer: Movable Facade Middle Layer: Support Structure Inside Layer: Storaged Voxel
24

Project IV

Arctic Hotel

Rovaniemi, Finland

2021 Jun. - Sep. Individual Project

Santa Claus Golf-Ounasvaara Golf Park 9421 Highway Ounasaara Disc Golf Course Ounasaara Ski Oy Tottorakka Lift Station Ounasvaaran Lookout Lapland Hotel Sky OUnasvarra Majappu Ounasvaara Obeservation Tower
25

Concept Masterplan

The concept idea of the Arctic Hotel project is to provide a comfortable environmental conditions to attract and encourage tourists to discover the beautiful and undeveloped Finnish forest. The concept idea is accomplished with an elevated sky walkway and all other functional units are arranged along with it.

By creating an elevated sky walkway through the Finnish forest, giving a different and unusual perspective to exploring and appreciating the aurora and natural landscape.

Living Units

Developed Open Forest View Platform Hot Spring Nod

Undeveloped Primitive Forst Outdoor Activities Service

Living Units

Developed Open Forest View Platform Hot Spring Nod

Undeveloped Primitive Forst Outdoor Activities Service

26
Preliminary Site Area Site Ecological Environment Landscape Ecological Design Landscape Location Landscape Configuration 原始场地 原始生态环境 生态设计 规划地址 景观改造 原始场地,指出现存主要森林道路& 小径,进而锁定主要的居住区域 在确定的居住区的基础上确定主要的 游览路径以及温泉活动区域 居住区域 温泉活动区域 规划好的游览路线基础上确定观景平 台 观景方向,景观设计. 包括了适应道 路和居住区的植被位置,下一张图可 以对比做出密度变化 在初步规划的植被基础上修改密度和 布局,确定野外活动区域 并联系出居 住点所连接的的游览路线 细化居住点,活动区域与海滩的关系 ,确定海滩更精确的布局。同时找出 海滩活动点与总体规划线路的关系, 确定环湖的活动路线 Site Landscape Design Location 原始场地,指出现存主要森林道路& 游览路径以及温泉活动区域 居住区域 规划好的游览路线基础上确定观景平 台 观景方向,景观设计. 包括了适应道 路和居住区的植被位置,下一张图可 在初步规划的植被基础上修改密度和 布局,确定野外活动区域 住点所连接的的游览路线 细化居住点,活动区域与海滩的关系 ,确定海滩更精确的布局。同时找出 海滩活动点与总体规划线路的关系, 确定环湖的活动路线 Preliminary Site Area Site Ecological Environment Landscape Ecological Design Landscape Location Landscape Configuration 原始场地 原始生态环境 生态设计 规划地址 景观改造 原始场地,指出现存主要森林道路& 小径,进而锁定主要的居住区域 在确定的居住区的基础上确定主要的 游览路径以及温泉活动区域 居住区域 温泉活动区域 规划好的游览路线基础上确定观景平 台 观景方向,景观设计. 包括了适应道 路和居住区的植被位置,下一张图可 以对比做出密度变化 在初步规划的植被基础上修改密度和 布局,确定野外活动区域 并联系出居 住点所连接的的游览路线 细化居住点,活动区域与海滩的关系 ,确定海滩更精确的布局。同时找出 海滩活动点与总体规划线路的关系, 确定环湖的活动路线 Preliminary Site Area Site Ecological Environment Landscape Ecological Design Landscape Location Landscape Configuration 原始场地 原始生态环境 生态设计 规划地址 景观改造 原始场地,指出现存主要森林道路& 小径,进而锁定主要的居住区域 在确定的居住区的基础上确定主要的 游览路径以及温泉活动区域 居住区域 温泉活动区域 规划好的游览路线基础上确定观景平 台 观景方向,景观设计. 包括了适应道 路和居住区的植被位置,下一张图可 以对比做出密度变化 在初步规划的植被基础上修改密度和 布局,确定野外活动区域 并联系出居 住点所连接的的游览路线 细化居住点,活动区域与海滩的关系 ,确定海滩更精确的布局。同时找出 海滩活动点与总体规划线路的关系, 确定环湖的活动路线 Preliminary Site Area Site Ecological Environment Landscape Ecological Design Landscape Location Landscape Configuration 原始场地 原始生态环境 生态设计 规划地址 景观改造 原始场地,指出现存主要森林道路& 小径,进而锁定主要的居住区域 在确定的居住区的基础上确定主要的 游览路径以及温泉活动区域 居住区域 温泉活动区域 规划好的游览路线基础上确定观景平 台 观景方向,景观设计. 包括了适应道 路和居住区的植被位置,下一张图可 以对比做出密度变化 在初步规划的植被基础上修改密度和 布局,确定野外活动区域 并联系出居 住点所连接的的游览路线 细化居住点,活动区域与海滩的关系 ,确定海滩更精确的布局。同时找出 海滩活动点与总体规划线路的关系, 确定环湖的活动路线 165m 250m 320m Hot Spring & Main Travel Route View Platform & Rest Nod Preserved Forest &Outdoor Activities Secondary Route & Waterside Activities Living Settlement & Main Distance Living Zone Living Sector View Platform View Platform View Platform Original Route Living Zone Living Zone Living Zone Living Zone Hot Spring Open Forest Outdoor Activity Forset Activity Riverside Activity Premitive Forest Low Density Water Activity Main Route Main Route Main Route Secondary Route Main Route Mid Density Forest Distance Distance Distance High Density Waterside activity Nod View Platform Slope 27

The Accommodation unit design is differentiated into 3 types:

Type A: Designed specifically for single or couple tourists who favored outdoor activities. The bottom floor includes types of equipment for different outdoor activities.

Type B: Developed with more view angles and openings for the tourists who enjoy the nature view.

Type C: Contained two or three bedrooms for families or friends. Unit C has more public space, for example, a living room, a tearoom, and a gym room.

Enthusiasts TYPE A TYPE B TYPE C Quantity Quantity Quantity Function Room Function Room Function Room Outside Activity Outside Activity Outside Activity Casuals Families TYPE A TYPE B TYPE C
Clients & Users 28
Accomodation Unit
29
Redraw Sketches Photograhy Model Making Daily Photography Selected Works 2019-2022 Other Works # ARC101 Design Thinking and Articulation - 2019 # ARC102 - 2020 # ARC205 - 2020 # ARC225 - 2021 # ARC302 - 2022 # Hobby 30

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
YANJIE_HUANG_GSA_Architecture_DipArch by Yanjie Huang - Issuu